Home / Terms & Conditions

Legal & Contractual Framework

Terms & Conditions.

Approved Version 4 contractual framework for Industry Pro Solutions LLP. Designed to govern commercial engagements with clear allocation of technical, operational, and warranty responsibilities across 15 activity-specific categories.

Version 4, Rev 03 15 Activity Categories Working Draft Governing Law: India
DOCUMENT GUIDE Version 4, Rev 03

About Industry Pro & How to Use These T&Cs

Industry Pro (IP) works across the industrial technology lifecycle — from product supply and repair through programming, integration, installation, commissioning, modernisation and ongoing technical/operational support.

Industry Pro provides industrial technology, automation and lifecycle support services across the working life of industrial equipment and systems. Its role may vary from supplying a product, repairing an existing unit, programming a controller, integrating multiple systems, installing and commissioning equipment, supporting plant handover, modernising a legacy system, providing IT/OT and connected-automation solutions, or providing continuing technical and operational support.

Depending on the assignment, IP may therefore act as a supplier, repair service provider, programmer, system integrator, installation and commissioning partner, retrofit/modernisation specialist, IT/OT partner, automation O&M and technical advisory partner, plant stabilisation support partner, engineering and technical consultancy provider, trainer, or provider of technical manpower and other specialised technical services. IP may work with equipment and systems that are new, used, refurbished, reconditioned or legacy, and may work alongside OEMs, EPC contractors, Customer teams, service associates and other third parties.

Why are there different T&Cs?

IP's engagements are not all of the same nature and therefore cannot always be governed appropriately by one generic set of conditions. The risks and responsibilities involved in selling a new PLC, repairing a customer's legacy drive, modifying PLC/SCADA software, integrating an automation system, commissioning a new installation, supporting an operating plant, or undertaking a legacy-system retrofit are materially different.

Accordingly, IP maintains Common General Terms & Conditions (T&C-1) together with 14 activity-specific Terms & Conditions. The Common General Terms contain provisions that apply generally to IP engagements, while the Specific T&Cs address the particular technical, operational, commercial and risk conditions of the relevant activity. A single customer engagement may involve more than one activity; in such cases, the relevant Specific T&Cs should be read together with the Common General Terms and with the applicable quotation, Statement of Work, Work Order, Purchase Order, tender or other agreed project documents.

How to Navigate the T&Cs

Start with the Common General T&Cs (T&C-1), then identify what IP is actually being engaged to do. Where an engagement combines several activities, the applicable Specific T&Cs may operate together rather than one replacing all the others. The applicable commercial and project documents will determine the exact scope, responsibilities and contractual commitments.

T&C No. Activity / Scope Action
T&C-1 Common General Terms & Conditions Framework applying generally to all Industry Pro transactions View Terms →
T&C-2 Repair Services Customer Terms & Conditions Component repair, diagnostics, workshop testing and customer warranties View Terms →
T&C-3 Repair Service Provider / Associate Terms & Conditions Service provider, technician and associate contractor obligations View Terms →
T&C-4 Preventive Maintenance / Non-Comprehensive AMC Customer Terms & Conditions Non-comprehensive periodic maintenance, inspections and reporting View Terms →
T&C-5 PLC / HMI / SCADA / Programming Services Industrial automation software, logic programming and IEC 61850 View Terms →
T&C-6 Automation / System Integration Services Multi-vendor automation integration, networking, FAT/SAT and handover View Terms →
T&C-7 IT/OT, Industrial Digitalisation & Connected Automation Edge/cloud connectivity, remote access, SCADA/DCS and cybersecurity View Terms →
T&C-8 Installation, Commissioning & Handover Support Physical site erection, pre-commissioning, energisation and start-up View Terms →
T&C-9 Automation O&M Support, Technical Advisory & Plant Stabilisation Operational advisory, ongoing plant stabilisation and technical escalation View Terms →
T&C-10 Supply / Sale of New Products Supply and trading of new automation, control and electrical components View Terms →
T&C-11 Supply / Sale of Used, Refurbished, Reconditioned & Legacy Products Secondary-market hardware, legacy lifecycle support and testing View Terms →
T&C-12 Retrofit, Modernisation, Migration & System Upgrade Services Control migration, drive replacement, panel modernisations and cutover View Terms →
T&C-13 Engineering, Design, Consultancy & Technical Assessment Services Feasibility studies, electrical design, system audits and consultancy View Terms →
T&C-14 Training & Knowledge Transfer Services Technical workshops, operator familiarisation and maintenance training View Terms →
T&C-15 Miscellaneous Technical Services & Supplies Occasional technical manpower, inspections, calibration and small supplies View Terms →
T&C-1 General Framework Version 4, Rev 03 — Working Draft For use with IP’s Specific Terms & Conditions

Common General Terms & Conditions

PURPOSE & APPLICATION

Purpose. These Common General Terms establish the contractual framework applicable to Industry Pro Solutions LLP (“IP”) transactions. They are intended to be read together with the Specific Terms applicable to the relevant activity and the transaction-specific commercial and project documents.

These Common General Terms (“General Terms”) establish the common contractual framework for the sale, supply, trading, repair, maintenance, programming, installation, integration, IT/OT, engineering, consultancy, training and other products or services provided by Industry Pro Solutions LLP (“IP”), except to the extent modified or supplemented by an applicable Specific T&C or transaction-specific agreement.

The applicable Specific T&C shall govern matters particular to the relevant activity. Where an engagement combines more than one activity, the relevant Specific T&Cs may apply together to their respective portions of the engagement.

These General Terms become contractually applicable only when expressly incorporated into the applicable Contract or Transaction Documents. A website reference shall identify the applicable version/date or otherwise clearly incorporate the relevant terms; a later website revision shall not automatically amend an existing Contract.

“Acceptance” means acceptance of Goods, Services or Deliverables in accordance with the applicable Transaction Documents.

“Business Day” means a day other than a Sunday or public holiday at the place relevant to the applicable obligation, unless the Transaction Documents specify otherwise.

“Contract” means the binding agreement between IP and the Customer comprising the documents identified in Clause 3.

“Customer” means the person, firm, company, government entity or other legal entity purchasing Goods or engaging IP for Services.

“Customer Data” means data, records, drawings, programs, specifications, credentials, documents and other information supplied by or on behalf of the Customer.

“Deliverables” means reports, drawings, software, configurations, documents, records or other outputs expressly identified as deliverables in the applicable scope.

“Goods” or “Products” means tangible equipment, components, parts, assemblies, instruments and other items supplied by IP, and software supplied as a product where applicable.

“IP” means Industry Pro Solutions LLP. IP may engage employees, consultants, Service Providers, Associates, subcontractors, OEMs and other third parties to perform portions of the Contract.

“OEM” means the original equipment manufacturer or other manufacturer identified for the relevant Product or system.

“Services” means repair, maintenance, programming, installation, commissioning, integration, IT/OT, engineering, consultancy, training, technical support and other services provided by IP.

“Specific T&C” means an IP Terms & Conditions document applicable to a particular activity or transaction.

“Transaction Documents” means the quotation, quotation acceptance, SOW, Work Order, Purchase Order, Letter of Award / Letter of Acceptance, accepted tender, technical/commercial schedules, agreed deviations, project contract and other documents expressly incorporated into the Contract.

“Warranty” means only the warranty expressly applicable to the relevant Goods, Services or Deliverables.

“Defect” means a material non-conformity of Goods, Services or Deliverables with an expressly agreed contractual requirement attributable to IP, excluding matters expressly excluded under the applicable Specific T&C.

References to writing include traceable electronic communication where permitted by applicable law and the Contract. “Including” means including without limitation. Headings are for convenience and do not affect interpretation. Words in the singular include the plural and vice versa where the context requires.

The Contract shall comprise the Transaction Documents expressly accepted or incorporated by IP.

Where the applicable project contract or accepted tender specifies its own order of precedence, that order shall govern. Otherwise, in the event of inconsistency, the following order shall apply: (a) mandatory applicable law; (b) express amendments, deviations or special conditions expressly agreed by the parties for the particular transaction; (c) the accepted project contract, tender, Letter of Award / Letter of Acceptance or equivalent transaction-specific instrument; (d) the applicable Specific T&C; (e) the accepted quotation, SOW, Work Order or order acceptance, to the extent it does not expressly vary a higher-ranking term; and (f) these General Terms.

A quotation, Work Order or Purchase Order line item, description or routine commercial note that merely states price, quantity, scope or schedule shall not by itself be treated as an express deviation from a Specific T&C. A deviation intended to modify a Specific T&C should identify the provision being varied or otherwise make the intended variation clear and shall be accepted by IP.

A Customer Purchase Order or standard purchasing terms shall not modify IP’s terms merely by being issued or referred to. They shall apply only to the extent expressly accepted by IP or incorporated into the binding project contract.

Quotations are valid only for the period stated in them. Unless expressly stated otherwise, a quotation is based on the information, specifications, quantities, site conditions, access, third-party inputs, foreign-exchange conditions and other assumptions known to IP when the quotation is issued.

A quotation is a commercial proposal and does not constitute acceptance of a Customer order unless IP expressly accepts the order.

If material assumptions change before acceptance or during execution, IP may revise the affected scope, price, schedule or other commercial conditions through the applicable change-control process.

A Contract shall arise when IP accepts the Customer’s order or otherwise confirms the transaction in writing or electronically, or when performance is commenced in circumstances in which such commencement constitutes acceptance under applicable law.

Electronic approvals, emails, digitally transmitted documents, photographs, service reports, site records and other traceable electronic records may form part of the contractual and evidentiary record, subject to applicable law.

IP may rely on communications, approvals and instructions received from persons identified by the Customer or reasonably appearing to be authorised to act for the Customer. The Customer remains responsible for its internal delegation and authority arrangements.

Prices shall be those stated in the applicable quotation or Contract.

Unless expressly included, applicable GST and other taxes, duties, levies, freight, packing, handling, insurance, customs charges, travel, accommodation, site expenses, testing charges, third-party fees and other transaction-specific costs shall be payable by the Customer as applicable.

Changes in statutory taxes, duties, government charges or other mandatory costs after quotation or Contract formation may be reflected in the amount payable where permitted by the Contract or law.

Payment shall be made in accordance with the applicable quotation or Contract.

The Customer shall make payment without unauthorised deduction, withholding or set-off except where required by law or expressly agreed. Where tax is deducted at source, the Customer shall provide the prescribed certificates and documentation within the applicable statutory period.

Applicable statutory payment protections, including mandatory MSME payment requirements where applicable, shall prevail over inconsistent contractual provisions.

Disputed amounts shall be raised promptly with reasonable particulars. The Customer shall not withhold undisputed amounts merely because another amount is under genuine dispute.

Amounts overdue may attract interest or other charges stated in the Contract or permitted by law.

Where payment remains overdue, IP may, after notice where reasonably appropriate, suspend affected or further performance, delivery, support or other future obligations until the overdue amounts and applicable charges are settled, subject to the applicable Contract and law. Such suspension shall not by itself extinguish a warranty or other remedy that has already accrued and cannot lawfully be withheld.

IP may also suspend affected Services where essential Customer inputs, access, approvals, safety conditions, credentials, utilities or other agreed prerequisites are unavailable.

The Customer shall provide accurate and timely information, specifications, drawings, access, approvals, decisions, personnel, utilities, permits, licences, credentials, site readiness and other inputs expressly or reasonably required for the agreed scope.

The Customer remains responsible for its plant, process, operating decisions, statutory obligations and matters expressly allocated to it under the Contract.

IP may rely on Customer information unless independent verification is expressly included in the scope. Delay, rework, additional visits or additional cost resulting from inaccurate, incomplete, late or changed Customer information may be treated as additional work subject to the applicable Specific T&C and change-control process.

Where Services are performed at a Customer or third-party site, the Customer shall provide safe and lawful access, required permits and site facilities and shall identify applicable site rules and hazards.

The Customer retains operating authority for its plant and process unless IP expressly accepts a defined operational responsibility in the Contract.

IP may refuse, suspend or stop work where it reasonably considers that required safety controls, isolation, permits, access, equipment condition or other essential conditions are absent or unsafe. Such action shall not by itself constitute IP default.

For Goods, delivery, transfer of risk and title shall be governed by the applicable quotation, purchase order, Incoterms® or other Contract terms.

Unless expressly agreed otherwise, delivery dates are estimates subject to Customer readiness, payment, availability, third-party/OEM dependencies, logistics and other agreed assumptions.

For Services, completion and risk allocation shall be governed by the applicable Specific T&C and Contract.

Changes to scope, quantity, specification, assumptions, design basis, schedule, deliverables, acceptance criteria, site conditions or other agreed requirements may require adjustment of price, time, resources, warranty or other Contract conditions.

A change shall be implemented through the mechanism stated in the Contract or, where none is stated, through traceable written or electronic confirmation by authorised representatives.

IP personnel are not authorised to accept contractual changes merely because a Customer instruction is given at site. Technical personnel may acknowledge technical instructions without thereby accepting a variation to price, scope, schedule, liability or warranty.

Where immediate action is reasonably necessary to prevent imminent injury, unsafe conditions or material physical damage, IP or its authorised Service Provider may take the minimum reasonable action necessary within the circumstances and shall record and report the action to the Customer/IP as soon as practicable. Any resulting additional work, cost or schedule impact shall be dealt with under the applicable Specific T&C and change-control mechanism. Any monetary threshold, approval route or emergency protocol specified in the applicable Specific T&C or Transaction Documents shall govern that activity.

A change shall be implemented through the mechanism stated in the Contract or, where none is stated, through traceable written or electronic confirmation by authorised representatives.

IP personnel are not authorised to accept contractual changes merely because a Customer instruction is given at site. Technical personnel may acknowledge technical instructions without thereby accepting a variation to price, scope, schedule, liability or warranty.

Acceptance shall be determined by the mechanism expressly stated in the applicable Specific T&C or Transaction Documents, including inspection, delivery acceptance, testing, commissioning, completion certificate, approval of a Deliverable or other agreed method.

Where an acceptance mechanism is required but neither the Transaction Documents nor the applicable Specific T&C specifies an acceptance period, and to the extent permitted by the Contract and applicable law, the Customer shall complete the agreed acceptance activity or provide written rejection identifying specific, reproducible non-conformities within ten (10) Business Days after IP gives written notice that the relevant Goods, Services or Deliverables are ready for acceptance. Failing such action, the relevant Goods, Services or Deliverables shall be deemed accepted to the extent permitted by the Contract and applicable law.

The default mechanism in the preceding paragraph shall not override any different inspection, acceptance or deemed-acceptance period expressly provided in a Specific T&C or Transaction Document. It shall not apply where acceptance is not applicable to the nature of the engagement.

Completion of one activity does not imply completion of other activities that are separately scoped.

No universal acceptance period or deemed-acceptance mechanism is created by these General Terms. Any deemed acceptance shall apply only where expressly provided in the applicable Specific T&C or Contract.

Completion of one activity does not imply completion of other activities that are separately scoped.

Warranty applies only where expressly provided for the relevant Goods, Services or Deliverables.

Product warranty, service warranty and project-specific warranty / Defect Liability Period (DLP) may have different commencement dates, durations, exclusions and remedies. The applicable Specific T&C and Contract shall govern the relevant warranty.

Unless expressly agreed otherwise, a warranty is not a guarantee of plant performance, production output, process result, continuous availability, future compatibility or performance of Customer or third-party equipment.

Where a covered Defect is established, IP’s primary remedy shall be repair, correction, replacement or re-performance as specified in the applicable Specific T&C or Contract. No warranty provision shall enlarge IP’s responsibility beyond the agreed scope or make IP responsible for a Product, system, process or equipment outside IP’s contractual responsibility.

IP may use, supply, integrate with or depend upon OEMs, manufacturers, laboratories, contractors, software licensors, Customer-appointed vendors and other third parties.

IP shall be responsible for the portion of Services expressly undertaken by IP. IP does not automatically assume the warranty, performance, certification, licensing obligations or liabilities of an OEM or other third party merely because IP supplied, integrated, repaired, configured or coordinated its Products or Services.

Third-party terms and licences shall apply where expressly incorporated or required for the relevant Product or Service.

IP retains ownership of its pre-existing and reusable intellectual property, including methodologies, templates, libraries, tools, software, source code, scripts, designs, know-how, calculation methods and engineering practices, unless expressly assigned or licensed under the Contract.

Customer-specific Deliverables shall be owned or licensed only to the extent expressly agreed. Payment for a Service or Product does not by itself transfer IP’s pre-existing intellectual property.

Where the Contract expressly provides for assignment of copyright in an identified work, the assignment shall be recorded in writing and shall identify the work and the rights assigned and specify the duration, territorial extent and consideration/royalty, as applicable under the Copyright Act, 1957. Where the Contract provides for a licence instead, the licence scope, duration, territory, permitted use and other material conditions shall be as expressly agreed.

Nothing in an assignment or licence of Customer-specific Deliverables shall transfer IP’s background IP, reusable libraries, generic software tools, methods, know-how or other pre-existing/reusable materials unless the Contract expressly and specifically provides for such transfer.

Third-party intellectual property remains subject to the rights and licences applicable to it.

Customer-specific Deliverables shall be owned or licensed only to the extent expressly agreed. Payment for a Service or Product does not by itself transfer IP’s pre-existing intellectual property.

Third-party intellectual property remains subject to the rights and licences applicable to it.

Each party shall protect confidential information received from the other and use it only for the purposes of the Contract, subject to applicable law and agreed confidentiality arrangements.

The Customer warrants that it has the right to provide Customer Data to IP and authorise its use for the agreed Services.

Where IP processes personal data or accesses Customer systems, the parties’ respective roles and obligations shall be determined by the Digital Personal Data Protection Act, 2023, rules and other applicable law as and when applicable to the relevant processing. Where required, the parties shall document the applicable Data Fiduciary / Data Processor or other statutory roles rather than assuming them merely from the nature of the engagement.

Where IP interacts with Customer IT/OT environments, the parties shall comply with applicable cybersecurity laws, directions and mandatory requirements, including applicable CERT-In directions. Specific IT/OT, cybersecurity, data-security or remote-access requirements, including incident-notification and cooperation periods, shall be governed by the applicable Specific T&C or Transaction Documents.

Where a cyber or data-security incident materially affects a shared environment, each party shall notify the other without undue delay and shall provide reasonable cooperation and information required for containment, investigation and any applicable statutory reporting. Where a Specific T&C prescribes a shorter operational notification period, that period shall apply. Nothing in this clause transfers responsibility for the Customer’s statutory reporting, security infrastructure or system administration to IP unless expressly included in the Contract.

The Customer warrants that it has the right to provide Customer Data to IP and authorise its use for the agreed Services.

Where IP processes personal data or accesses Customer systems, the parties’ respective roles and obligations shall be determined by applicable law and the Contract. IP shall not be deemed to assume a broader data-protection, cybersecurity or system-administration responsibility merely because it receives data or is granted technical access.

Specific IT/OT, cybersecurity, data-security or remote-access requirements shall be governed by the applicable Specific T&C or Transaction Documents.

Each party shall comply with applicable laws relating to anti-bribery, anti-corruption, sanctions, export/import controls and other trade restrictions applicable to its obligations under the Contract.

Neither party shall require the other to undertake an act that would violate applicable law. IP may suspend or decline a transaction or activity where it reasonably believes that performance would expose IP to a material legal, sanctions or compliance risk.

Customer-specific integrity, sanctions, export-control or compliance requirements shall apply to IP only to the extent expressly identified and accepted as part of the Contract.

Each party shall comply with laws and regulatory requirements applicable to the obligations allocated to it under the Contract.

Customer-specific standards, specifications, certifications, statutory approvals or tender requirements shall apply to IP only to the extent expressly identified and accepted as part of the Contract.

IP shall not be deemed to have accepted compliance with every standard potentially relevant to the Customer’s plant or industry merely because such standard exists.

Neither party shall be liable for delay or failure caused by events beyond its reasonable control, to the extent permitted by law and subject to reasonable mitigation.

Such events may include natural disasters, fire, flood, epidemic or pandemic restrictions, war, civil disturbance, government action, embargo, transport disruption, major utility failure, widespread cyber incident, OEM/manufacturer disruption, shortage or unavailability of critical components, or other events beyond the affected party’s reasonable control.

The affected party shall notify the other party within a reasonable period where practicable. Payment for Goods delivered and Services properly performed before the event shall remain due.

Cancellation, postponement or rescheduling after Contract formation may result in charges for Services performed, Goods procured or committed, non-cancellable third-party commitments, restocking, travel, mobilisation, demobilisation, storage and other amounts properly due under the Contract.

Suspension and termination rights shall be governed by the applicable Specific T&C and Contract. IP may suspend affected work where essential prerequisites are unavailable or where continued performance would create material safety, security or commercial risk.

Termination shall not affect accrued rights, payment obligations or provisions intended by their nature to survive termination.

Any indemnity provided by IP or the Customer shall apply only where expressly stated in the Contract.

Neither party shall be deemed to indemnify the other for every loss arising from the Contract merely because it is the service provider or Customer. Responsibility for third-party claims shall be allocated according to the applicable Contract, the party’s agreed obligations and applicable law.

Specific indemnities required by a tender or project contract shall apply only to the extent expressly accepted by IP.

Where insurance is required, the applicable quotation, SOW, tender or project contract shall specify the required policies, limits, duration and responsible party.

IP shall not be deemed to have accepted a project-specific insurance obligation merely because insurance is customary in the industry or required by a Customer’s internal policy unless the requirement forms part of the binding Contract.

Subject to the applicable Specific T&C, accepted project contract and mandatory law, each party shall be responsible for loss directly attributable to its own breach, negligence, wilful misconduct or other legally attributable act or omission.

To the maximum extent permitted by applicable law, neither party shall be liable to the other for indirect, incidental, special, exemplary or consequential loss, including loss of profit, revenue, production, business, opportunity or anticipated savings, unless expressly accepted in the Contract.

IP’s aggregate liability arising out of or in connection with a transaction shall, unless a different limit is expressly agreed in the applicable Contract, be limited to the amount actually paid or payable to IP under the affected transaction. This limitation applies to the aggregate of all claims arising from the same transaction, regardless of the legal basis of the claim.

The liability cap and exclusions in these General Terms may be modified by an applicable Specific T&C or transaction-specific Contract where an express, accepted provision allocates a different risk or establishes a specific carve-out.

Nothing in these General Terms or any Specific T&C shall be construed as excluding or limiting liability to the extent such exclusion or limitation is prohibited by applicable law.

Formal notices required under the Contract shall be sent to the addresses or email addresses stated in the quotation, SOW, Work Order or other Contract document.

Operational instructions and approvals may be communicated through agreed project communication channels, provided they are traceable.

Each party shall identify its authorised commercial or project representative where the Contract requires such identification.

Each party may retain quotations, orders, approvals, correspondence, service reports, delivery records, photographs, test records, electronic logs and other records reasonably required to evidence performance and contractual decisions, subject to applicable confidentiality, privacy and record-retention requirements.

Where a Specific T&C requires a particular record, that requirement shall apply to the relevant activity.

The Customer shall not assign the Contract in a manner that materially changes IP’s counterparty or payment risk without IP’s prior written consent, except where permitted by the applicable project contract.

IP may engage employees, associates, subcontractors, specialists, OEMs or other service providers to perform portions of the Services, while remaining responsible for IP’s contractual obligations to the extent provided in the Contract.

T&C-3 shall govern IP’s contractual relationship with Service Providers / Associates where expressly applicable.

These General Terms shall be read together with the applicable Specific T&Cs.

The Specific T&C governs activity-specific matters. These General Terms govern matters of general application unless the applicable Specific T&C expressly modifies them or the Transaction Documents expressly provide otherwise.

Where an engagement combines multiple activities, the applicable Specific T&Cs shall apply to their respective activities without requiring the Customer to enter into separate contracts for each activity, unless the Transaction Documents provide otherwise.

Where a Specific T&C contains a technical, operational, warranty, acceptance, emergency, liability or other mechanism designed specifically for the relevant activity, that mechanism shall apply to that activity subject to the order of precedence established in Clause 3.

The Specific T&C governs activity-specific matters. The General Terms govern matters of general application unless the applicable Specific T&C expressly modifies them.

Where an engagement combines multiple activities, the applicable Specific T&Cs shall apply to their respective activities without requiring the Customer to enter into separate contracts for each activity, unless the Transaction Documents provide otherwise.

The governing law, dispute resolution, arbitration, jurisdiction and venue shall be those stated in the applicable Contract.

Where the Contract does not state these matters, they shall be governed by the provisions specified in IP’s then-current General Terms incorporated into that Contract and by applicable law.

An accepted tender or project contract may prescribe a different governing law or dispute-resolution mechanism where IP has accepted that requirement.

If any provision of the Contract is held invalid or unenforceable, the remaining provisions shall continue to the extent permitted by law.

Failure or delay by either party in exercising a contractual right shall not constitute a waiver of that right.

No amendment to the Contract shall be binding unless made through the amendment mechanism specified in the Contract or otherwise agreed in traceable written or electronic form by authorised representatives.

The Contract constitutes the agreement between the parties concerning its subject matter and supersedes prior proposals or discussions to the extent stated in the applicable Contract.

Provisions concerning payment, confidentiality, intellectual property, data, liability, dispute resolution, accrued rights and other matters that by their nature require continuing effect shall survive completion or termination.

The version of IP’s General and Specific T&Cs expressly incorporated into the Contract shall govern that transaction. Later website updates shall not automatically amend an existing Contract unless the Contract expressly provides for such incorporation.

T&C-2 Services & Maintenance Version 4, Rev 02 - Internal Review Draft

Repair Services Customer Terms & Conditions

These Repair Terms apply to repair, inspection, diagnosis, testing, refurbishment, reconditioning and related repair services provided by Industry Pro Solutions LLP (“IP”).

They supplement IP’s Common General Terms & Conditions (“General Terms”). The General Terms apply to matters not specifically addressed in these Repair Terms.

These Repair Terms shall apply to a repair engagement when they are expressly referred to or incorporated in the applicable quotation, order acceptance, repair acknowledgement, Work Order or other written/electronic communication forming part of the transaction.

Specific written terms expressly agreed for the particular repair engagement shall prevail over these Repair Terms to the extent of any inconsistency.

A repair engagement shall become binding when IP accepts the order or otherwise confirms the engagement in writing or electronically, or when IP commences the agreed work or accepts the equipment for the agreed work.

Submission of equipment does not authorise IP to undertake work outside the agreed scope. Where equipment is submitted for diagnosis or inspection, IP is authorised to perform the diagnostic and inspection activities expressly included in the applicable quotation or repair acknowledgement.

Repair shall be limited to the equipment, fault, components, activities and deliverables stated in the applicable quotation or subsequently approved by the Customer.

An initial assessment or quotation may be based on information provided by the Customer and preliminary inspection. The actual condition of equipment may become clear only after detailed testing, opening, dismantling or diagnosis.

Unless expressly included, repair does not include restoration of the equipment to original factory condition, replacement of all ageing or weakened components, correction of unrelated faults, or repair of the complete machine, production line or process in which the equipment is installed.

IP shall be entitled to inspect, test and diagnose the equipment before or during repair.

Where IP identifies additional faults, damaged components, hidden defects, deterioration, obsolescence, incompatibility or other conditions materially affecting the repair, IP shall inform the Customer and may revise the scope, price and/or estimated completion time.

Additional repair work shall require Customer approval unless the Customer has previously authorised IP to proceed within a defined scope or value.

Diagnostic, inspection, testing and evaluation charges shall remain payable where such charges are stated in the quotation or applicable commercial terms, including where the equipment is not repaired, the Customer does not approve the revised repair, the reported fault cannot be reproduced, or no fault is found.

Diagnosis may require opening, dismantling, de-soldering, removal or other invasive or potentially irreversible work. Where repair is not approved, is discontinued, or the equipment is declared unserviceable or Beyond Economical Repair (“BER”), IP may return the equipment in its then-current diagnostic condition. Unless specifically included in the agreed scope, IP shall not be required to restore the equipment to its pre-diagnostic physical condition.

Where IP cannot reproduce or verify the reported fault, or the equipment passes the applicable tests, IP may classify the case as No Fault Found (“NFF”), No Problem Found (“NPF”) or an unverified fault.

IP may return the equipment without repair. Applicable diagnostic, testing, evaluation, handling, packing and transportation charges shall remain payable in accordance with the quotation or applicable commercial terms.

IP may determine that equipment is technically unserviceable, unsafe to repair, obsolete, commercially impractical to repair, or BER.

IP may decline, discontinue or recommend against repair in such circumstances. Inspection, diagnosis, dismantling, packing, storage, transportation and other charges incurred up to that point shall remain payable.

A determination that equipment is BER or unserviceable does not by itself constitute an admission that the equipment was damaged by IP.

Repair services are provided for the specific equipment and repair scope agreed for the engagement.

IP does not guarantee that every equipment item can be repaired, that every reported fault can be eliminated, or that repaired equipment will perform satisfactorily in every Customer application.

Repair of an individual component or unit does not constitute a guarantee of the performance, reliability, safety, remaining life or production outcome of the complete machine, system or process in which it is used.

Unless expressly included in the agreed scope, repair does not constitute re-certification, statutory compliance certification, safety validation or approval of the Customer’s machine, system or application.

IP may use new, equivalent, refurbished, reconditioned or repaired components where technically appropriate and permitted by the applicable quotation or approved scope.

A specific manufacturer, make, model or component requirement shall be identified before approval where it is material to the repair. Such requirement may affect price, availability and completion time.

Unless expressly agreed, repair does not require replacement of all ageing, weakened or marginal components or restoration to original manufacturer condition.

Removed or replaced parts may be retained by IP for technical analysis, warranty verification, exchange arrangements or other legitimate repair-related purposes, subject to applicable law and the agreed transaction terms.

IP shall carry out functional or other appropriate testing within the agreed repair scope before declaring the repair complete, where such testing is reasonably practicable.

Testing shall be based, where available, on applicable specifications, procedures, operating information, test methods or agreed acceptance criteria.

Testing of a repaired component or equipment does not constitute testing or acceptance of the complete machine, production line, process or application unless expressly included in the agreed scope.

Completion of repair shall mean completion of the agreed repair activities and applicable testing; it shall not constitute a guarantee of future operation or production.

The Customer shall provide accurate and complete equipment identification, serial number, fault description, operating conditions, repair history and other information reasonably available to it. The Customer acknowledges that equipment may be received by IP in a non-functional, non-communicative or corrupted condition in which internal programs, parameters, recipes, firmware or other information may already be inaccessible or unrecoverable.

Where relevant, the Customer shall provide drawings, manuals, error messages, photographs, programs, parameters, passwords, licences, activation keys and other information required for the agreed work.

The Customer shall provide timely approvals, documents, access, testing facilities, utilities and other cooperation required for execution.

Delays or additional costs arising from incomplete, inaccurate or delayed information, approvals, access or other Customer dependencies may result in revised schedules and additional charges.

The Customer is responsible for maintaining appropriate and verified backups of data, programs, parameters and other information before submitting equipment for repair, except to the extent backup or restoration is expressly included in IP’s scope.

The Customer acknowledges that non-functional, inaccessible or damaged equipment may prevent such backup before repair.

During diagnosis or repair, IP may need to erase, reset, modify, replace, reprogram or reinstall data, programs, parameters, firmware or software as necessary for the agreed work.

IP does not guarantee preservation or restoration of Customer-specific programs, parameters, recipes, firmware, licences or other software unless expressly included in the quotation or agreed scope.

Where the equipment is capable of operation but the required backup is not provided or is not reasonably accessible, IP shall not be responsible for loss of such information resulting from the authorised repair activities, except to the extent caused by IP’s proven breach of the agreed scope.

Reconfiguration, restoration, reloading or revalidation remains the Customer’s responsibility unless expressly included in IP’s scope.

The Customer represents that it is the lawful owner of the equipment or is duly authorised by the owner to submit the equipment to IP and authorise the repair.

IP is not responsible for independently verifying the Customer’s ownership or authority.

The Customer shall be responsible for claims arising from lack of ownership, authority, licence or other legal right to submit the equipment, data, programs or materials to IP and shall indemnify IP to the extent provided in the General Terms and applicable law.

Where equipment is sent to IP, the Customer shall use the IP address communicated for the repair, provide appropriate packing and protection, identify the equipment and repair reference where applicable, and provide relevant fault and contact information.

The Customer shall be responsible for additional freight, handling, repacking or related costs arising from incorrect address, inadequate packaging, incomplete information or incorrect dispatch instructions.

IP shall not be responsible for damage occurring before receipt by IP except to the extent expressly accepted by IP or required by applicable law.

Unless otherwise agreed in writing, transportation of equipment to IP shall be arranged and paid for by the Customer and shall remain at the Customer’s risk until receipt by IP.

Responsibility and risk for return transportation shall be as stated in the quotation or agreed shipping arrangement.

Where offered by IP, the Customer may obtain additional transit insurance or special packing at additional cost. Where IP arranges transit insurance specifically for the Customer, any compensation shall remain subject to the applicable insurance policy and its terms.

IP shall not be responsible for consequential losses arising from transit, to the maximum extent permitted by applicable law.

Repair completion and dispatch dates are estimates unless expressly committed in writing.

The Customer shall promptly inspect equipment on receipt and notify IP of visible transit damage, shortage or apparent non-conformity, with supporting evidence.

The Customer shall provide IP a reasonable opportunity to inspect or verify any alleged damage or non-conformity before the equipment is further repaired, modified or disposed of, except where immediate action is reasonably necessary for safety or protection of property.

Acceptance of repaired equipment does not constitute acceptance of performance of the Customer’s complete machine, system or application unless such performance testing is expressly included in the agreed scope.

The Customer shall collect or arrange return transportation of completed or returned equipment within the period communicated by IP.

Storage charges may apply after the communicated collection period.

To the extent permitted by applicable law, IP may retain equipment until amounts due for repair, diagnosis, freight, handling, insurance and storage are paid.

If equipment remains uncollected despite reasonable attempts by IP to contact the Customer, IP may issue a further written notice specifying a final collection/payment period. After expiry of that period, IP may exercise any lien, retention, sale, disposal or other rights available under applicable law and the transaction documents, including sale or disposal where legally permissible.

Any proceeds realised may be applied, to the extent permitted by law, towards amounts due and reasonable costs incurred by IP. Nothing in these Terms creates or enlarges a statutory right otherwise unavailable to IP.

Unless otherwise stated in the quotation, the repair warranty shall apply only to the fault specifically repaired and/or components specifically repaired or replaced by IP, for the warranty period stated in the quotation.

The warranty shall commence on dispatch from IP’s facility or notification that the equipment is ready for collection/dispatch, whichever occurs earlier, unless the quotation states otherwise or IP is responsible for delivery or on-site commissioning.

A repair warranty shall not restart or extend the original warranty unless expressly stated in writing.

A subsequent unrelated or additional fault shall not be covered merely because it occurs during the repair warranty period.

Warranty support shall be available only after amounts due against the applicable invoice, including applicable packing, handling, freight and other charges, have been received, unless otherwise agreed in writing.

The repair warranty shall not apply to failure or damage arising from, or contributed to by:

physical damage, mishandling or abuse;

improper storage, installation, commissioning, operation or maintenance;

incorrect, unsuitable or incompatible application or system integration;

unauthorized repair, modification, alteration or tampering;

faulty external equipment, wiring, power supply or field devices;

abnormal voltage, power quality or environmental conditions;

contamination, moisture or other abnormal operating conditions;

normal wear and tear or ageing;

failure of components outside the repaired or replaced scope;

software, firmware, programming, parameters or licensing outside IP’s repair scope;

OEM or third-party equipment, software, firmware, licences, restrictions or dependencies outside IP’s agreed scope;

any fault unrelated to the repair performed by IP; or

any cause outside the work specifically performed by IP.

The warranty shall also not apply where the equipment has been modified, repaired, opened, reconfigured or otherwise interfered with by the Customer or a third party after completion of the repair, to the extent such action affects the claimed failure.

The Customer shall promptly notify IP of a suspected warranty failure and provide the equipment identification, repair reference and relevant details of the claimed failure.

IP shall have the right to inspect, test and diagnose the equipment before accepting a warranty claim.

The Customer shall not have the equipment repaired, modified or materially altered by another party before IP has had a reasonable opportunity to evaluate the claim, except where immediate action is reasonably necessary for safety or to prevent material property damage.

Where IP confirms that the failure is covered by the repair warranty, IP shall, at its option, re-repair the affected equipment/component, replace the relevant component or provide another remedy agreed for the engagement.

Where the reported failure is not covered, cannot be reproduced, or relates to another fault, applicable diagnostic, repair, freight and other charges may apply.

The warranty remedy shall be limited to correction, repair, replacement or other remedy expressly provided under the applicable warranty and shall not extend to removal, dismantling, reinstallation, commissioning, production loss, downtime or other consequential costs unless expressly agreed or required by applicable law.

IP’s responsibility is limited to the equipment and repair scope expressly entrusted to it.

The Customer and/or relevant Original Equipment Manufacturer (“OEM”) shall retain responsibility for the overall machine, system, application, programming, integration, field wiring, safety, regulatory compliance and operating conditions, except to the extent expressly included in IP’s written scope.

IP shall not be responsible for faults arising from improper, unsuitable or incompatible use, application or integration of repaired equipment.

Where performance depends on OEM software, firmware, components, licences, proprietary tools, communication protocols, third-party equipment or other external dependencies, IP’s responsibility shall remain limited to the agreed repair scope and matters reasonably within IP’s control.

IP is an independent repair/service entity unless expressly stated otherwise. IP shall not be responsible for OEM-enforced software blocks, feature restrictions, activation requirements, anti-repair restrictions, firmware limitations or other OEM/third-party restrictions beyond IP’s reasonable control.

IP may perform repair work through its employees, associates, approved service providers, repair partners, subcontractors, consultants, technical specialists, OEMs or other authorised personnel as appropriate.

IP may engage specialist or OEM support where required for a particular repair.

Such engagement shall not alter the agreed scope, commercial terms, warranty limitations or liability provisions applicable to the repair.

Customer technical, commercial and operational information received by IP in connection with a repair engagement shall be treated as confidential in accordance with the General Terms and applicable law.

IP’s general repair methodologies, diagnostic techniques, tools, processes, know-how, test methods, improvements and generic technical knowledge developed or used in providing repair services shall remain IP’s property and may be used in its business, provided Customer-specific confidential information is not disclosed.

To the maximum extent permitted by applicable law, IP’s total liability arising from a repair engagement shall not exceed the repair charges actually paid to IP for the equipment giving rise to the claim, unless a different limit is expressly agreed in writing for that engagement.

IP shall not be liable for indirect, incidental, special or consequential losses, including production loss, downtime, loss of profit, loss of revenue, loss of business, loss of opportunity, or loss or corruption of data, to the maximum extent permitted by law.

Nothing in these Terms excludes or limits liability to the extent such exclusion or limitation is prohibited by applicable law.

To the extent permitted by applicable law and the General Terms, the Customer shall indemnify IP against third-party claims, losses, costs and liabilities arising from lack of ownership or authority, inaccurate or unauthorised information or instructions, Customer misuse or unsuitable application, Customer breach of these Terms or applicable law, or claims arising from the Customer’s system, process, application or use of the repaired equipment, except to the extent directly caused by IP’s proven breach.

IP shall not be responsible for delay or failure caused by circumstances beyond its reasonable control, including natural disasters, fire, flood, war, civil disturbance, government action, labour disruption, transportation disruption, major power or communication failure, epidemic or pandemic, supply-chain disruption, component shortages or unavailability of OEM or third-party support.

Affected schedules shall be extended to the extent reasonably required. The Customer shall remain responsible for work performed and costs properly incurred up to the point of suspension or delay.

Prices, taxes, payment terms, quotation validity, freight, packing, handling, insurance and other commercial conditions shall be as stated in the applicable quotation, Work Order and General Terms.

Customer-requested changes, additional requirements, unforeseen conditions, specification changes, additional testing, additional site visits or other work outside the agreed scope may result in additional charges and revised timelines.

Where practicable, IP shall communicate the material impact before proceeding. Customer approval shall be obtained where required under the applicable commercial terms.

IP may suspend performance where the Customer fails to make payment, fails to provide required cooperation or approvals, creates unsafe conditions, materially changes the scope, or otherwise materially breaches the applicable terms.

IP may terminate the repair engagement for material breach remaining unremedied after reasonable notice, or where continuation is prohibited by law or becomes commercially impracticable.

Upon suspension or termination, the Customer shall pay for work performed, materials procured or committed, diagnostic activities, storage, transportation and other amounts properly due under the applicable transaction.

These Repair Terms form part of IP’s overall contractual framework and shall be read together with the General Terms and the applicable quotation, Work Order or other transaction document.

The General Terms govern matters of general application. These Repair Terms govern repair-specific matters.

Specific written terms expressly agreed for the particular repair engagement, including an accepted tender or project contract, shall prevail over these Repair Terms to the extent of a clear inconsistency.

Routine operational communications, repair approvals and confirmations may be made through email, electronic systems or other agreed channels. Approvals issued by the Customer's authorised representative through email or other traceable electronic communication accepted by IP may form part of the contractual record and may constitute binding approval of the corresponding scope, price or other change. IP may require a formal written document or purchase-order amendment where required by the applicable transaction or law.

The version of these Repair Terms referred to or incorporated in the applicable transaction shall govern that engagement. Later revisions shall not automatically modify an accepted repair engagement unless otherwise agreed.

The repair engagement shall be governed by the laws of India unless otherwise expressly agreed. Dispute resolution, arbitration and jurisdiction shall be governed by the General Terms or the applicable written agreement.

T&C-3 Provider Network Version 4, Rev 02 - Internal Review Draft

Repair Service Provider / Associate Terms & Conditions

These Terms and Conditions (“Terms”) apply to repair, troubleshooting, testing, refurbishment, component replacement, field service and related technical services assigned by Industry Pro Solutions LLP (“IP”) to a service provider, technician, contractor, associate, repair centre or other service partner (“Service Provider”).

These Terms shall be read together with the applicable work order, job assignment, purchase order, service instruction or other written/electronic instruction issued by IP (“Work Order”).

The Work Order shall specify the equipment, scope, commercial terms, timelines, location and job-specific requirements. Where the Work Order identifies an IP customer or project, any customer-specific technical, safety, testing, documentation, quality or schedule requirement that IP has communicated to the Service Provider in writing and that is applicable to the assigned work shall form part of the Service Provider’s obligations. The Service Provider shall not be required to accept a customer requirement that was not communicated to it or that materially changes the agreed scope without corresponding IP instruction.

Specific terms expressly agreed in the applicable Work Order shall prevail over these Terms only to the extent of a clear inconsistency.

The Service Provider acts as an independent contractor and not as an employee, agent, partner or representative of IP.

The Service Provider shall have no authority to bind IP, alter IP’s commercial terms, provide a warranty or representation on behalf of IP, accept liability for IP, collect payment, or make any commitment to an IP customer beyond the authority specifically given by IP.

The Service Provider shall remain responsible for its personnel and approved subcontractors and shall ensure that they comply with these Terms and the applicable Work Order.

The Service Provider shall promptly accept or decline an assigned Work Order through the communication channel specified by IP. Acceptance may be by written or traceable electronic confirmation or by commencement of the assigned work.

Once accepted, the Service Provider shall execute the Work Order in accordance with the agreed scope, schedule and requirements.

Silence shall not by itself constitute acceptance unless the applicable Work Order or established written arrangement expressly provides otherwise.

The Service Provider shall undertake only the work authorised by IP.

The Service Provider shall not undertake additional repair, replacement, modification, testing, travel or other chargeable work without IP’s prior approval.

Instructions received directly from an IP customer shall not, by themselves, authorise any change in scope, price, warranty or other contractual commitment by IP. Any such request shall be referred to IP.

The Service Provider shall not quote or negotiate directly with an IP customer for work arising from an IP assignment unless expressly authorised by IP.

If the Service Provider identifies an additional fault, a different or more extensive cause of failure, a requirement for additional parts, an unsafe or unsuitable repair condition, an OEM/third-party restriction, or any other circumstance materially affecting the assigned work, it shall promptly inform IP and provide the relevant technical findings and supporting evidence.

The Service Provider shall await IP’s instructions before undertaking work outside the authorised scope. In an emergency, it may take only the minimum action reasonably necessary to prevent imminent injury, unsafe conditions or physical damage to the equipment, and shall immediately notify IP. No chargeable component replacement, additional repair or expenditure exceeding ₹5,000 per incident shall be undertaken without traceable approval from IP, unless a different limit is expressly stated in the Work Order. Emergency action shall not by itself create an entitlement to additional payment.

Where an external cause is relied upon to explain a failure, the Service Provider shall provide reasonable diagnostic evidence supporting that conclusion.

The Service Provider shall deploy personnel having appropriate knowledge, skill, experience and competence for the assigned work.

Repair work shall be performed with appropriate professional skill and care, using suitable tools, equipment and test instruments and in accordance with the agreed technical requirements and applicable safety practices.

The Service Provider shall follow applicable precautions relating to electrical safety, electrostatic discharge (ESD), contamination, physical handling, isolation/lockout and other risks relevant to the work.

Parts and components used for repair shall conform to the requirements communicated by IP.

The Service Provider shall not substitute a component with another component having materially different specifications, ratings, functionality or origin without IP’s approval where the substitution could affect performance, reliability, warranty or compatibility.

The Service Provider shall maintain traceability of parts used where required by IP.

Removed, defective, replaced and unused parts shall be retained, identified and returned or otherwise dealt with in accordance with IP’s instructions.

No IP/customer-owned material, component or equipment shall be scrapped, retained, sold, transferred or otherwise disposed of without IP’s authorisation.

Where equipment or customer property is placed in the Service Provider’s custody, the Service Provider shall exercise reasonable care and protect it against loss, theft, misuse, unauthorised access and damage.

The Service Provider shall maintain equipment identification and serial-number traceability, store the equipment appropriately, use it only for the authorised work, and return it and associated materials as instructed by IP.

The Service Provider shall promptly report any loss, damage, missing component, unusual condition or other incident affecting equipment or customer property.

The Service Provider shall maintain appropriate records of receipt, transfer and return where required by IP.

The Service Provider shall carry out diagnosis appropriate to the assigned repair and accurately report its findings to IP.

Where applicable, the Service Provider shall identify whether the equipment is successfully repaired, No Fault Found (NFF), found to require additional work, Beyond Economical Repair (BER), or otherwise unsuitable for the proposed repair.

Before declaring the repair complete, the Service Provider shall carry out the agreed testing and provide the agreed test evidence.

Testing shall not be represented as establishing performance beyond the scope of the tests actually performed.

Completion shall mean completion of the authorised work and applicable testing; it shall not constitute a guarantee of the complete machine, system, process or application unless expressly included in the Work Order.

For each assigned repair, the Service Provider shall provide accurate records reasonably required by IP, including equipment identification, reported fault, diagnosis/findings, work performed, parts replaced, test results, photographs/videos, calibration or test records and completion status, as applicable.

Where requested, the Service Provider shall identify the technician who performed the work.

Records shall be made contemporaneously where reasonably practicable and shall not be retrospectively altered in a manner that obscures the actual sequence or nature of the work.

IP may require reasonable supporting evidence where a warranty claim, customer complaint, damage event or external-cause explanation is involved.

The Service Provider may communicate directly with an IP customer only to the extent authorised or necessary for execution of the assigned work.

The Service Provider shall not, without IP’s prior written authorisation, solicit or accept repair/service work directly from an IP customer introduced to the Service Provider through IP in relation to the same or a substantially related requirement.

For 12 months after the last assignment involving a particular customer, the Service Provider shall not directly solicit or accept from that customer any repair or service requirement that is the same as, or substantially related to, the requirement for which IP introduced or engaged the Service Provider, except with IP’s prior written consent.

This restriction does not apply to a customer relationship that the Service Provider can demonstrate, through records existing before the relevant IP introduction, was independently established by the Service Provider, or to work demonstrably unrelated to the IP-introduced requirement.

Nothing in this clause is intended to prohibit lawful independent business activity beyond the specific non-circumvention restriction stated above and all restrictions remain subject to applicable law.

The Service Provider shall keep confidential all technical, commercial, customer and other non-public information received from IP or an IP customer in connection with the assigned work.

Such information shall be used only for performing the authorised work and shall be disclosed only to personnel who need it for that purpose and who are bound by confidentiality obligations no less protective than these Terms.

The Service Provider shall take reasonable technical and organisational measures to protect equipment, data, programs, passwords, credentials, drawings, photographs, reports and other information in its possession.

Any actual or suspected loss, unauthorised access, disclosure or security incident involving IP or customer information shall be reported to IP promptly.

Customer-specific drawings, programs, data, documents and materials supplied by IP or the customer shall remain the property of the respective owner.

The Service Provider shall not copy, reuse, publish, commercialise or disclose such material except as necessary for the authorised work.

The Service Provider shall retain ownership of its pre-existing general repair methodologies, tools, diagnostic techniques and general know-how, except where specific ownership or assignment is expressly agreed in the Work Order.

Where a Work Order requires the Service Provider to create custom software, PLC/HMI/SCADA code, configuration files, parameter files, scripts, drawings, documentation or other copyrightable deliverables specifically for IP, the Service Provider hereby assigns to IP, to the extent legally assignable, all rights, title and interest in such identified deliverables, including the rights to reproduce, modify, adapt, use, distribute, license and otherwise exploit them, for the full period of copyright and throughout the world. The consideration for such assignment shall be included in the consideration stated in the applicable Work Order. The Service Provider shall execute any further document reasonably required to evidence or perfect the assignment. Pre-existing tools, libraries, methodologies and general know-how of the Service Provider are excluded unless expressly assigned in the Work Order.

The Service Provider shall not access, copy, extract, alter, erase, transfer or retain customer programs, parameters, recipes, firmware, passwords or other digital information except to the extent necessary for the authorised work or expressly instructed by IP.

Where backup, extraction, restoration, cloning or reloading is required, the Service Provider shall perform it only within the authorised scope and shall preserve the integrity and confidentiality of the information.

The Service Provider shall promptly report any loss, corruption or unauthorised modification of customer data or programs arising during its work.

The Service Provider shall, at its own cost, rectify defects in workmanship or repair attributable to the Service Provider and identified within the warranty period specified in the applicable Work Order. Where the Work Order identifies a customer-facing warranty obligation for the assigned repair, the Service Provider’s warranty shall, unless expressly agreed otherwise, cover the corresponding period and shall be triggered from the date specified by IP for the customer-facing warranty, so that IP is not left with an unbacked warranty period attributable to the Service Provider.

The Service Provider shall not be responsible for failures caused solely by matters outside its repair scope, customer misuse, third-party intervention, external equipment or other causes not attributable to the Service Provider.

Where a warranty claim is made, the Service Provider shall promptly investigate and provide diagnostic evidence requested by IP.

Where a warranty defect is established as attributable to the Service Provider, the Service Provider shall bear the reasonable costs of rework, packing, handling, return transportation and re-delivery directly arising from that warranty rework, unless the Work Order expressly provides otherwise. The Service Provider shall not be responsible for costs arising from unrelated faults or causes outside its responsibility.

The Service Provider shall complete the assigned work within the agreed timeline and shall promptly notify IP of any actual or anticipated delay and its cause.

Where delay is attributable to the Service Provider and is not caused by IP, the customer, an OEM, a third party or another event outside the Service Provider’s reasonable control, IP may, subject to the applicable Work Order and law, require expedited corrective action, reassign the work, or recover reasonable additional costs and customer charges/penalties actually incurred by IP to the extent attributable to the Service Provider.

Any agreed liquidated damages or other delay remedy shall be stated in the applicable Work Order. No unagreed penalty is created by these Terms alone.

The Service Provider shall comply with applicable laws, labour and social-security requirements, occupational safety requirements, environmental requirements, site rules, permits and customer safety procedures applicable to its personnel and work.

The Service Provider shall be solely responsible, as between IP and the Service Provider, for wages, statutory benefits, employment records, social-security contributions, required insurance and other employer/contractor obligations applicable to its personnel, and shall comply with applicable labour, social-security, minimum-wage, occupational safety and workmen/employee compensation requirements.

The Service Provider shall obtain and maintain any registration, licence, permit or certification required for the services or deployment of its personnel.

The Service Provider shall promptly report accidents, injuries, unsafe conditions, regulatory notices or other material incidents connected with the assigned work.

Where the Service Provider deploys contract labour or personnel at an IP or customer site, it shall provide IP with statutory/compliance documents reasonably requested by IP. These obligations do not exclude any liability that applicable law may place directly on IP or the customer. The Service Provider shall reimburse and indemnify IP, to the extent legally recoverable, against claims, statutory demands, penalties, interest and costs arising from non-compliance attributable to the Service Provider or its personnel.

The Service Provider shall not subcontract or further outsource the assigned work without IP’s prior written approval.

Any approved subcontractor shall be bound in writing by obligations relating to scope, safety, confidentiality, customer information, intellectual property, data protection, equipment custody and other requirements applicable to the assigned work.

The Service Provider remains fully responsible for the acts and omissions of its personnel and approved subcontractors.

Rates, payment terms, taxes and reimbursable expenses shall be as stated in the applicable Work Order or agreed commercial terms.

The Service Provider shall submit invoices with the supporting documents reasonably required by IP, including work completion records, customer/site confirmations, test records, expense proofs and tax documentation where applicable.

IP may withhold or dispute amounts that are unsupported, incomplete or subject to a genuine service/quality dispute, without affecting undisputed amounts.

To the extent permitted by law and the applicable agreement, IP may set off amounts due from the Service Provider against amounts payable to the Service Provider.

Where the nature, value, location or risk of the assigned work warrants insurance, IP may require the Service Provider to maintain appropriate insurance and provide evidence of coverage before commencement.

Insurance shall not by itself limit the Service Provider’s contractual responsibility or indemnity obligations unless expressly agreed.

Subject to applicable law, the Service Provider shall be responsible for loss or damage arising from its breach of these Terms or the Work Order, negligence, wilful misconduct, unauthorised acts, defective workmanship, damage to equipment/property in its custody, or breach of confidentiality, data or intellectual-property obligations.

Unless a different limit is stated in the Work Order, the Service Provider’s aggregate liability for ordinary contractual breaches shall not exceed 100% of the value of the affected Work Order.

The foregoing cap shall not apply, to the extent permitted by law, to loss of or physical damage to IP/customer property while in the Service Provider’s custody or control, fraud, wilful misconduct, breach of confidentiality or non-circumvention obligations, death or bodily injury caused by the Service Provider, or amounts payable under the Service Provider’s indemnity obligations for third-party claims arising from such matters. For clarity, a claim for defective workmanship shall remain subject to the agreed warranty/rework obligations and the applicable liability cap unless the Work Order expressly provides otherwise.

The Service Provider shall indemnify and hold IP harmless, to the extent permitted by law, from third-party claims, losses, costs and liabilities arising from the Service Provider’s breach, negligence, wilful misconduct, unauthorised customer commitments, damage to IP/customer property, employment/statutory non-compliance attributable to the Service Provider, or infringement arising from materials supplied by the Service Provider.

The Service Provider shall maintain records and reasonably cooperate with IP in defending any claim for which indemnity is sought.

IP may reasonably inspect the status and quality of work assigned to the Service Provider and review records relevant to the assignment.

Where repeated defects, customer complaints, safety concerns or compliance failures arise, IP may require investigation, root-cause analysis and corrective action.

Such verification shall not relieve the Service Provider of its contractual responsibility.

IP may suspend an assignment or terminate the Service Provider’s engagement, in accordance with the applicable agreement, for material breach, repeated poor workmanship, repeated failure to meet agreed commitments, unauthorised customer dealings, serious confidentiality or data breach, serious safety or statutory non-compliance, insolvency, fraud, wilful misconduct, or other serious misconduct.

IP may also terminate an individual Work Order where the customer cancels the underlying requirement or the work is no longer required, subject to payment of amounts properly due for work performed and authorised committed costs.

Termination shall not affect obligations that by their nature are intended to continue.

Upon completion, suspension or termination of an assignment, the Service Provider shall promptly return all IP/customer equipment, components, materials, documents, repair records, credentials, programs and other property as instructed by IP.

The Service Provider shall not retain IP/customer property as security for unrelated amounts due.

To the extent permitted by law, the Service Provider waives any right of lien or retention over IP/customer property arising from these assignments, except to the extent IP expressly agrees otherwise in writing.

Nothing in this clause excludes any right that cannot lawfully be waived.

These Terms and the applicable Work Order shall be read together. Specific Work Order terms expressly agreed by IP and the Service Provider shall prevail over these Terms to the extent of a clear inconsistency.

The Service Provider shall not assign the Work Order or its rights/obligations without IP’s prior written approval.

Electronic communications, approvals and records through authorised IP channels may form part of the contractual record. An approval issued by an authorised IP representative through a traceable electronic channel may constitute approval of a scope or commercial change only to the extent that the representative has authority to give that approval.

Confidentiality, intellectual property, non-circumvention, indemnity, liability, payment obligations, return of property and dispute provisions shall survive completion or termination to the extent their nature requires.

These Terms shall be governed by applicable Indian law.

Disputes shall first be referred to authorised representatives of IP and the Service Provider for resolution in good faith. If not resolved within the period specified in the applicable agreement, the dispute shall be dealt with through the arbitration, jurisdiction or other dispute-resolution mechanism specified in the governing agreement or Work Order. If no specific mechanism is stated, the applicable legal forum and jurisdiction shall be determined in accordance with applicable law.

The version of these Terms referred to or incorporated in the applicable Work Order or other contractual communication shall govern that assignment.

IP may revise these Terms for future assignments. A later revision shall not automatically alter an accepted Work Order unless expressly agreed in writing.

T&C-4 Services & Maintenance Version 4, Rev 03

Preventive Maintenance / Non-Comprehensive AMC Customer Terms & Conditions

These Specific Terms apply to preventive-maintenance services (“Services”) provided by Industry Pro Solutions LLP (“IP”) for equipment/devices specifically identified in the applicable AMC Schedule, Proposal, Work Order or other agreed transaction document.

IP’s standard AMC offering is non-comprehensive preventive maintenance. Its purpose is to inspect, assess, maintain and report the condition of the listed equipment at the agreed intervals.

These Terms supplement IP’s Common General Customer Terms & Conditions (“General Terms”). The applicable AMC Schedule, Proposal or Work Order shall define the actual equipment, activities, frequency, duration, commercial terms and any additional commitments for the particular engagement.

Only equipment/devices specifically identified in the applicable AMC Schedule or Work Order shall be covered.

The equipment schedule shall, where relevant, identify: equipment/device description; make and model; serial number or other identification; quantity; site/location; application, machine or system to which the device is connected; and applicable preventive-maintenance activities or checklist.

Equipment added subsequently shall be covered only after the applicable scope and commercial terms are agreed.

IP shall undertake the agreed number and frequency of preventive-maintenance visits during the AMC period.

The actual activities shall depend on the equipment and agreed scope and may include inspection, cleaning, checking/tightening of connections, cooling/ventilation checks, electrical or functional checks, parameter verification, condition assessment and other preventive activities specifically included in the AMC Schedule or applicable checklist.

Not every activity is applicable to every equipment item. IP shall perform the activities reasonably applicable to the listed equipment within the agreed scope.

Unless expressly included, the AMC does not include breakdown attendance, corrective repair, replacement of parts, major overhaul, modification, redesign, installation, commissioning, programming or system integration.

Before IP’s engineer undertakes preventive-maintenance activity on a listed device, the engineer shall, to the extent reasonably possible, verify the identity of the device and establish whether it is functioning at that time.

The pre-maintenance condition shall be recorded where practicable as: functioning; not functioning; abnormal condition; or not available for verification.

Where reasonably apparent, pre-existing defects, alarms, abnormal conditions or other material observations may also be recorded.

Where a device is found to be non-functional or defective before IP undertakes the preventive-maintenance activity, that condition shall be recorded and communicated to the Customer.

The preventive-maintenance service does not, by itself, constitute an obligation to restore a device that was already non-functional or defective before IP commenced the maintenance activity.

Preventive maintenance and corrective repair are separate activities.

Where IP identifies a fault, defective component, abnormal condition or requirement for corrective work during a PM visit, IP may report the finding and recommend appropriate corrective action.

Corrective work shall be undertaken only against separate Customer approval and applicable commercial terms, unless expressly included in the AMC Schedule.

Identification of a fault during preventive maintenance shall not by itself mean that corrective repair, replacement or restoration is included in the AMC fee.

Unless expressly included in the AMC Schedule, the AMC fee does not include replacement parts, spare components, major consumables, special materials, major repair components, batteries, specialised testing or other material required for corrective work.

Where a particular consumable or replacement item is included, the applicable AMC Schedule shall identify it.

IP may recommend replacement, repair or other corrective action where required. Supply and installation of such parts or execution of such work by IP shall be subject to the applicable quotation, approval and commercial terms unless expressly included in the AMC.

The Customer shall make the covered equipment and required site access available at the agreed time and shall provide necessary shutdowns, isolation, permits, clearances, utilities, safety arrangements and a suitable contact person.

The Customer shall ensure that the equipment can safely be accessed and worked upon when IP’s engineer attends.

Where the equipment is unavailable, inaccessible, unsafe to service, not shut down or otherwise not ready at the agreed time, IP may defer or reschedule the affected activity.

If the Customer fails to maintain the agreed schedule or the covered device is not made available after IP’s engineer has reached the site, IP may defer or reschedule the affected activity. Where the visit forms part of a defined AMC visit entitlement, IP may, at its option, treat the aborted visit as a consumed visit for that AMC period, or charge reasonable waiting, travel/mobilisation or re-mobilisation costs as applicable. IP shall not recover the same cost twice under both alternatives. Such circumstances shall not constitute a failure by IP to perform the AMC.

The Customer shall provide a safe and reasonably suitable working environment and shall communicate applicable site safety, security and access requirements to IP before or at the time of service.

Where required shutdown, isolation, permit, access or safety conditions are unavailable, IP may decline or defer the affected activity until the required condition is provided.

IP shall not be responsible for consequences arising from unsafe, inaccessible or unsuitable site conditions outside IP’s control.

IP’s personnel shall comply with reasonable site safety and security requirements communicated by the Customer, subject to their compatibility with the agreed Services and applicable law.

IP shall provide a service report or equivalent service record for the preventive-maintenance activity in the format used by IP for the applicable service.

The report may record: equipment identification; connected application/machine; pre-maintenance condition; activities performed; observations/findings; post-maintenance condition, where ascertainable; equipment not available for service; defects or abnormalities identified; and recommendations for further action.

A recommendation for corrective work is an observation/recommendation only and shall not constitute a commitment by IP to perform that work under the AMC.

Where a listed device is not available for inspection or is found to be non-functional before IP undertakes the PM activity, IP may record that condition in the service report.

IP shall not be deemed to have accepted responsibility for restoring such equipment merely because the equipment is included in the AMC Schedule.

Where the Customer subsequently requests repair, restoration, replacement or other corrective work, such work shall be separately considered and quoted unless expressly covered by the AMC Schedule.

Where a device cannot be serviced because it is not available, inaccessible or unsafe, IP may record the reason and the affected visit shall be dealt with in accordance with the agreed schedule and commercial terms, including the provisions relating to customer non-readiness in these Terms.

The Customer shall provide IP with information reasonably relevant to the Services, including known equipment faults, operating conditions, relevant modifications and known safety or access restrictions.

The Customer shall inform IP of material modifications, repairs, replacements or interventions carried out on covered equipment by persons other than IP where such changes may affect the maintenance activity or equipment condition.

IP shall be entitled to rely on information provided by the Customer unless the information is reasonably shown to be incorrect during the Service.

Unless expressly included in the AMC Schedule, preventive maintenance does not include modification, optimisation or reprogramming of PLCs, Variable Frequency Drives (VFDs), drives, controllers, Supervisory Control and Data Acquisition (SCADA) systems or other software/configuration.

IP shall not intentionally alter equipment parameters, programs or configuration as part of routine PM unless such activity is specifically included or separately authorised.

The Customer acknowledges that routine diagnostic and verification activities appropriate to the equipment, including reading diagnostic information, checking parameter blocks and, where within the agreed procedure, cycling power, may expose a pre-existing or latent weakness in ageing or degraded electronic memory, storage, firmware or related components and may result in loss, corruption or reset of parameters or other stored information. IP shall not be responsible for such loss, corruption or reset where it results from a routine authorised PM activity and is not caused by IP’s negligence or failure to follow the agreed procedure.

Where software, program or configuration backup, restoration or modification is required, the responsibility, method and scope shall be separately specified.

IP shall not be responsible for preservation or restoration of software, parameters or configuration that was already inaccessible, corrupted or unavailable before the Service, unless such activity was expressly included in IP’s scope.

IP shall not be responsible for equipment failure or abnormal operation to the extent caused by conditions outside the agreed maintenance scope, including power supply or power quality; connected equipment or external systems; Original Equipment Manufacturer (OEM) hardware, software or firmware issues; environmental conditions; Customer operation, misuse or improper maintenance; unauthorised modifications or third-party intervention; or other conditions not attributable to IP’s Services.

Where such a condition is identified during PM, IP may report it and recommend appropriate action.

Preventive maintenance is intended to reduce the likelihood of failure and identify maintenance requirements. It cannot eliminate the possibility of subsequent failure.

Unless expressly agreed otherwise in a separate written arrangement: the AMC does not guarantee uninterrupted operation of the equipment; the AMC does not guarantee production output, plant uptime or business continuity; IP does not warrant that equipment will remain operational throughout the AMC period; and a PM visit does not constitute a guarantee against subsequent equipment failure.

The fact that a device is found functioning before or after a PM activity does not constitute a guarantee of its future performance.

Failure of a covered device between PM visits shall not, by itself, establish that the preceding PM activity was defective.

IP shall exercise reasonable care while performing the Services.

IP shall be responsible for direct physical damage to Customer equipment caused by IP’s negligence or failure to exercise reasonable care during the performance of the Services, subject to the aggregate liability cap, exclusions and other limitations contained in the General Terms and applicable law. The specific AMC proposal or Work Order may expressly provide a different liability allocation for that engagement.

IP shall not be responsible for damage or failure attributable to pre-existing conditions, normal wear and tear, inherent equipment defects, Customer actions, external systems, or other causes outside IP’s reasonable control.

IP shall not be responsible for damage or failure attributable to pre-existing conditions, normal wear and tear, inherent equipment defects, Customer actions, external systems, or other causes outside IP’s reasonable control.

The AMC fee, payment terms, number of visits, applicable expenses and other commercial conditions shall be as specified in the applicable quotation, AMC Schedule or Work Order.

Unless expressly included, additional work such as corrective repair, emergency attendance, replacement of parts, special testing, additional visits, reconfiguration or other work outside the agreed PM scope shall be separately chargeable.

IP shall obtain Customer approval before undertaking chargeable additional work, except where a separate agreed procedure or standing authorisation applies.

Travel, accommodation, freight, special transportation, permits, mobilisation/demobilisation and other expenses shall be treated as specified in the AMC Schedule or commercial proposal.

Where such expenses are not included in the AMC fee, they shall be separately chargeable in accordance with the agreed commercial terms.

Additional travel or mobilisation arising from Customer postponement, non-readiness, non-availability of equipment or other Customer dependency may be separately chargeable.

The AMC shall remain valid for the period specified in the applicable AMC Schedule or Work Order.

The number and frequency of visits shall be those agreed for the AMC period. Any unused visit or service entitlement shall not automatically carry forward beyond the AMC period unless expressly agreed.

Renewal shall take place only in accordance with the agreed renewal mechanism or through fresh commercial confirmation.

Unless expressly agreed, expiry or termination of the AMC shall not create an obligation on IP to continue preventive-maintenance services.

IP may suspend or terminate the Services in accordance with the General Terms and applicable agreement.

IP may also suspend, defer or reschedule Services where required access is repeatedly unavailable; the site or equipment cannot safely be serviced; agreed payments remain outstanding; the Customer repeatedly prevents scheduled maintenance; or continued performance becomes impracticable for reasons attributable to the Customer.

Treatment of any prepaid amount, if applicable, shall be as specified in the applicable commercial terms and the General Terms.

Service reports, checklists, observations and other records generated by IP for the AMC shall form part of the service record for the covered equipment.

The Customer is responsible for maintaining its own operational, statutory and maintenance records unless record-keeping is expressly included in IP’s scope.

IP may use service observations and non-confidential technical information from the engagement for internal service-quality, planning and maintenance-improvement purposes, subject to the confidentiality obligations applicable to Customer information.

The Annual Maintenance Contract (AMC) is a service contract and not an equipment warranty.

IP shall perform the agreed preventive-maintenance activities with reasonable professional skill and care.

If the Customer identifies an alleged deficiency in the performance of an agreed PM activity, IP shall have a reasonable opportunity to inspect and, where the deficiency is attributable to IP and can reasonably be corrected, repeat or correct the affected PM activity.

Correction of a PM service deficiency shall not create an obligation to repair, replace or restore equipment whose underlying condition is outside the agreed PM scope.

These Preventive Maintenance / Non-Comprehensive AMC Terms are specific to IP’s standard non-comprehensive preventive-maintenance Services and shall be read together with IP’s Common General Customer Terms & Conditions and the applicable AMC Schedule, Proposal or Work Order.

Specific written commercial or technical terms expressly agreed for a particular AMC shall prevail over these Specific Terms to the extent of a clear inconsistency.

Where a customer tender or project contract expressly requires a different or comprehensive AMC scope and IP accepts that requirement, the accepted project contract shall govern the applicable scope and obligations for that engagement.

The governing law, dispute resolution, arbitration and jurisdiction provisions shall be those contained in the General Terms or the applicable written agreement.

Nothing in these Specific Terms shall prevent an accepted tender or project contract from prescribing a different governing law, dispute-resolution mechanism or jurisdiction for the particular engagement.

T&C-5 Engineering & Systems Version 4, Rev 02

PLC / HMI / SCADA / Programming Services

These Specific Terms apply to PLC, HMI, SCADA and related industrial automation programming, configuration, troubleshooting, migration, testing and associated software services (“Programming Services”) provided by Industry Pro Solutions LLP (“IP”).

The Programming Services shall be limited to the platforms, equipment, applications, software versions, functions, interfaces, deliverables and activities expressly identified in the applicable quotation, Statement of Work (“SOW”), Work Order, tender or project contract.

Programming Services may be provided as a standalone service or as part of a wider automation, system integration, repair, commissioning or maintenance engagement.

These Specific Terms supplement IP’s Common General Customer Terms & Conditions (“General Terms”). Specific written terms accepted for the particular engagement shall prevail over these Terms to the extent of a clear inconsistency.

Programming shall be undertaken on the basis of the requirements, functional specifications, sequence of operation, I/O information, drawings, existing programs, hardware information, network information and other technical inputs made available by the Customer and accepted as the basis of the work.

Where the assignment requires a Functional Design Specification (FDS) or equivalent functional baseline, IP shall commence detailed programming against the version formally approved by the Customer. The approval date shall constitute the FDS/baseline freeze date. Changes after that date may constitute a change in scope, price and schedule. For assignments where no separate FDS is required, the approved SOW, Work Order, functional description or equivalent document shall constitute the programming baseline.

The Customer shall be responsible for the accuracy, completeness and authority of information and materials supplied by or on behalf of the Customer.

Where requirements are incomplete, inconsistent, subsequently changed, or dependent on information or equipment not available to IP, the resulting work, time and cost may be treated as a change to the agreed scope.

Where IP is required to modify, troubleshoot, migrate, convert or otherwise work on an existing program or application, IP shall be entitled to rely on the condition and information made available for the agreed work.

IP shall not be responsible for undocumented logic, hidden dependencies, pre-existing defects, obsolete instructions, corrupted files, unknown passwords, missing libraries, unsupported versions or other conditions existing in the original program unless investigation or correction of those conditions is expressly included in the agreed scope.

The Customer represents and warrants that it has the necessary rights, licences and authority to provide existing programs, software, documentation and other materials to IP and to authorise the agreed modification, migration, troubleshooting or other work.

IP shall not be required to circumvent, crack or bypass passwords, licence controls, security protections or OEM restrictions unless the Customer has expressly authorised such action and has confirmed in writing that it has the necessary rights and authority. The Customer shall be responsible for third-party/OEM claims arising from the Customer’s lack of such authority and shall indemnify IP to the extent provided in the General Terms and applicable law.

IP’s responsibility shall be limited to the programming, configuration and interfaces expressly included in the agreed scope.

Connection or interaction with PLCs, HMIs, SCADA systems, drives, I/O devices, instrumentation, networks, servers, databases, protection devices, Intelligent Electronic Devices (“IEDs”), OEM software or other external systems shall not by itself make IP responsible for their condition, performance, compatibility or continued operation.

Where an external interface is material to the outcome, the applicable SOW, Work Order or project document shall identify the interface and respective responsibilities where reasonably necessary.

Where IEC 61850 is expressly included in the agreed scope, the applicable SOW or project specification shall define the actual IEC 61850 activities and deliverables.

Depending on the assignment, such activities may include IED configuration, Substation Configuration Language (SCL) engineering, system configuration, Generic Object Oriented Substation Event (GOOSE) configuration/testing, Manufacturing Message Specification (MMS) configuration/testing, Sampled Values configuration/testing, interoperability testing and related documentation.

The applicable IEC 61850 edition/revision, devices, communication functions, configuration files, testing requirements and deliverables shall be those specifically agreed for the project.

The inclusion of IEC 61850 work shall not by itself make IP responsible for IEDs, protection schemes, communication networks, third-party devices or functions outside the agreed IEC 61850 scope.

Where IEC 61850 communication depends upon Customer- or third-party-supplied Ethernet infrastructure, IP shall not be responsible for communication failure, excessive latency, loss or delay of GOOSE, MMS or Sampled Values messages, or resulting non-operation, to the extent caused by network congestion, switches, VLAN configuration, multicast handling, routing, firewall configuration, network topology, time synchronisation or other infrastructure conditions outside IP’s agreed scope. Where time synchronisation is relevant, this includes PTP/IEEE 1588, SNTP or other Customer/third-party time-synchronisation infrastructure.

Programming may depend upon hardware, firmware, operating systems, communication networks, field devices, IEDs, OEM software, third-party applications, licences and other external systems.

The Customer shall ensure that required third-party equipment, software, licences, access and test facilities are available in the agreed condition and within the agreed schedule, unless IP has expressly undertaken to provide them.

IP shall not be responsible for delay, malfunction, incompatibility or inability to achieve an agreed result to the extent caused by such external dependencies and not attributable to IP.

The applicable SOW or Work Order shall identify, where material, the relevant programming platform, software version, firmware version, engineering environment and target equipment.

Where offline engineering software, online controller firmware, HMI/SCADA runtime, IED firmware or other version-dependent components are material to the work, the Customer shall provide the relevant version information and access for compatibility verification. IP shall not be responsible for incompatibility caused by undisclosed, subsequently changed or unsupported versions or by a mismatch between the development environment and the installed equipment not attributable to IP.

IP may maintain version identification, revision records and controlled working copies for programs and configurations developed or modified under the assignment.

Where the Customer or a third party changes the program, hardware, firmware, operating environment, network, database, configuration or other relevant part of the system after IP’s agreed handover or acceptance, IP shall not remain responsible for resulting changes or failures except to the extent expressly covered by an applicable warranty or subsequent scope.

Testing and acceptance requirements shall be those expressly stated in the SOW, Work Order, approved test protocol or other agreed project document.

Depending on the assignment, testing may include offline testing, Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT), functional testing, communication testing, commissioning tests or other specifically agreed tests.

Programming shall be assessed against the agreed requirements and acceptance criteria, and not against unspecified, subsequently introduced or Customer-modified requirements.

Where the agreed acceptance procedure identifies defects attributable to IP, IP shall be given a reasonable opportunity to correct them within the agreed scope.

Minor observations or punch points that do not prevent the agreed functionality from being achieved shall not by themselves constitute rejection of the complete deliverable, unless the project contract expressly provides otherwise.

If the Customer does not complete an agreed acceptance test or provide written rejection identifying specific non-conformities within 10 Business Days after IP gives written notice that the deliverable is ready for the agreed acceptance test, the deliverable shall be deemed accepted, to the extent permitted by the applicable contract and law.

The deliverable shall also be deemed accepted, to the extent permitted by the applicable contract and law, when the Customer or its authorised operator places the programmed system into commercial production or other operational use for the purpose for which it was delivered, except where such use is expressly stated to be a temporary test, trial or commissioning activity.

Any rejection must identify specific, reproducible non-conformities against the agreed acceptance criteria. A rejection shall not suspend acceptance of unaffected deliverables or functionality.

Once the requirements, functional specification, programming baseline or approved design has been established, changes requested by the Customer may constitute additional work and may result in revised price and schedule.

This includes changes to process requirements, I/O, sequence, hardware, platform, software version, network architecture, customer-supplied information, testing requirements, commissioning requirements or modifications requested after acceptance.

IP shall assess the technical and commercial impact before undertaking material changes, unless an agreed change-control procedure permits otherwise.

Each party shall retain ownership of its pre-existing intellectual property.

For clarity, IP’s pre-existing and reusable intellectual property includes its generic software, libraries, reusable function blocks, templates, routines, scripts, algorithms, development tools, utilities, methods, know-how and improvements that are not created exclusively for the Customer as an identified project-specific deliverable. Such materials shall remain IP’s property even when incorporated into or used in a project deliverable, subject to the Customer receiving the rights expressly agreed for the project.

Unless expressly transferred under an accepted tender, SOW, Work Order or project contract, IP shall retain ownership and copyright in its background and reusable software and materials.

Where the Customer is to receive a licence to a project-specific application or deliverable owned by IP, the licence shall, unless the project contract states otherwise, be non-exclusive, perpetual, worldwide and royalty-free for use, operation, maintenance and modification of that application for the Customer’s designated plant/site and its authorised maintenance personnel or contractors. The licence shall not transfer ownership of IP’s background or reusable components and shall not permit their separate commercialisation, resale or extraction for use in another project.

Customer-provided programs, drawings, specifications, data and other Customer intellectual property shall remain the Customer’s property.

Rights in customer-specific application software or other project deliverables shall be those expressly agreed for the engagement. Delivery of source code, project files or editable files shall not by itself constitute transfer of ownership of IP’s pre-existing or reusable intellectual property.

Where an accepted contract requires assignment of copyright in identified project-specific software or other copyrightable deliverables, the assignment shall be recorded in writing and shall identify the relevant work, rights assigned, duration, territorial extent and consideration/royalty, as applicable under the Copyright Act, 1957. Unless the accepted contract expressly requires assignment, the default position shall be the licence/ownership arrangement stated above.

Where ownership, assignment, perpetual licence, source-code delivery or other special rights are required by a tender or project contract accepted by IP, those rights shall be governed by that accepted contract.

Where source code, project files or editable configuration files are included in the agreed deliverables, the applicable SOW or Work Order shall identify the files or categories of files to be handed over.

Handover may include, as specifically agreed, PLC source programs, HMI/SCADA project files, scripts, configuration files, SCL files, parameter files, databases, documentation and backups.

IP shall not be required to hand over development tools, proprietary libraries, reusable function blocks, internal utilities, credentials, third-party licensed software or other materials not expressly included in the agreed deliverables.

Where the Customer requires source-code escrow, archival copies, repository access or other special arrangements, those requirements shall be expressly stated in the applicable project documents.

Where third-party or OEM software, libraries, drivers, runtimes, firmware, development tools or licences are required, their availability, licensing and associated costs shall be as specified in the applicable commercial or project documents.

IP shall not grant rights in third-party software beyond the rights available to IP.

The Customer shall comply with applicable OEM and third-party licence conditions, activation requirements, usage restrictions and other licensing requirements.

Where open-source software or other third-party components impose disclosure, attribution, source-code or other licence obligations material to the deliverable, the applicable project documents shall identify such components or requirements where known to IP.

IP shall maintain reasonable working copies of programming/configuration files required for performance of the agreed Services.

Unless expressly included, IP does not undertake to maintain the Customer’s operational backup system or long-term archival of the Customer’s complete automation environment.

The Customer shall maintain appropriate backups of existing programs, parameters, recipes, databases, configurations and other operational data before IP undertakes modification, migration or other programming work, except where backup is expressly included in IP’s scope.

Where existing software or configuration is already inaccessible, corrupted, incomplete or unavailable, IP shall not be responsible for restoration of the missing material unless restoration or recovery is expressly included in the agreed scope.

Where Programming Services involve access to the Customer’s Information Technology (“IT”) or Operational Technology (“OT”) environment, such access shall be limited to the agreed purpose and authorised by the Customer.

The Customer shall provide appropriate access credentials, network connectivity, remote-access arrangements and permissions required for the agreed work and shall maintain its own network, endpoint and security controls unless such activities are expressly included in IP’s scope.

IP’s cybersecurity responsibility shall be limited to cybersecurity activities expressly included in the agreed scope and matters attributable to IP.

IP shall not be responsible for vulnerabilities, malware, unauthorised access, firewall or network configuration, operating-system security, third-party infrastructure or other conditions in the Customer’s or third-party environment except to the extent expressly included and attributable to IP.

Where remote access is required, the access method, responsibilities, permitted activities and applicable security controls shall be agreed before access is provided.

Where Programming Services involve safety PLCs, Safety Instrumented Systems (SIS), protection functions, safety interlocks, emergency functions or other safety-related logic, the applicable requirements, standards, validation activities and responsibilities shall be expressly identified in the SOW or project documentation.

Where IP is engaged to program safety-related functions, the Customer shall remain responsible for the overall functional-safety lifecycle, hazard assessment, safety requirements and authorisation for live/hazardous operation. Before introducing the programmed safety functions into live or hazardous operation, the Customer shall ensure that the required verification and validation has been completed and documented by the competent person(s) or Functional Safety Expert required by the applicable standard, project specification or Customer safety system, and that the Customer has authorised operation.

IP shall not be responsible for failure of a safety function to the extent caused by failure to perform the required Customer-side verification, validation, commissioning, proof testing, bypass management or other safety lifecycle activity outside IP’s agreed scope. Nothing in this clause excludes liability for IP’s own proven negligence or failure to perform the programming work in accordance with the agreed requirements.

Unless expressly included, IP’s programming scope shall not be interpreted as independent certification, validation or guarantee of the overall safety, statutory compliance or functional safety of the Customer’s machine, plant or process.

The Customer shall remain responsible for ensuring that the complete machine, plant and process is operated and maintained in accordance with applicable safety requirements except to the extent expressly undertaken by IP.

Where site commissioning is included, programming changes reasonably required to complete the agreed commissioning scope may be undertaken within that scope.

Changes arising from revised Customer requirements, defective or changed hardware, field conditions, third-party systems, unavailable information or other matters outside IP’s agreed programming responsibility may be treated as additional work.

The Customer shall provide the required site access, equipment availability, permits, utilities, network access and other conditions necessary for commissioning.

IP shall correct programming defects attributable to IP and identified within the applicable warranty period, subject to the agreed warranty conditions. Unless a different warranty period or trigger is expressly stated in the applicable project contract, the warranty shall commence on the earliest of: (a) formal Customer acceptance; (b) deemed acceptance under §8; or (c) 30 days after IP’s written Notice of Readiness for the agreed commissioning/acceptance, provided IP has made the deliverable available for such activity.

The warranty shall apply to conformity of the Programming Services with the agreed requirements and acceptance criteria. It shall not be extended merely because the Customer delays testing, commissioning, deployment or acceptance after the applicable warranty trigger has occurred.

The warranty shall not apply to problems caused by Customer or third-party modification; changes to hardware, firmware or operating environment; changes to field devices or external systems; incorrect or changed Customer inputs; misuse or operation outside the agreed application; unauthorised access or alteration; third-party/OEM software or equipment; or circumstances outside IP’s agreed scope.

Where a covered programming defect is established, IP’s primary warranty remedy shall be correction or re-performance of the affected Programming Services. The warranty shall not automatically include unlimited troubleshooting, optimisation, training, future modification or on-site support.

Troubleshooting, modifications, optimisation, migration, additional programming, training, on-site support or remote support after completion of the agreed Services shall be chargeable unless expressly included in the applicable warranty, support arrangement, AMC or other contract.

A warranty for a programming defect shall not automatically constitute an obligation to provide continuing technical support or future modifications.

If the Customer or another party modifies the delivered program or relevant system after handover, any subsequent investigation or restoration by IP may be treated as additional chargeable work unless covered by an applicable warranty.

Unless expressly agreed in writing, IP’s responsibility is to provide the Programming Services in accordance with the agreed requirements and acceptance criteria.

Programming Services do not by themselves constitute a guarantee of continuous plant operation, equipment availability, production output, process performance, energy performance, product quality, network availability or performance of hardware, field devices or third-party systems.

Where a specific performance parameter is required, it shall be expressly identified, measurable and agreed in the applicable SOW or Work Order, together with the assumptions and conditions under which it will be assessed.

The extent of software documentation, as-built information, configuration records, test records, troubleshooting documentation, operating instructions and training material to be supplied by IP shall be as specified in the applicable scope.

IP shall not be required to create documentation, records or training material beyond the agreed deliverables merely because such material may be useful for future operation or maintenance.

Where IP provides training, the scope shall be limited to the personnel, duration, subject matter and format expressly agreed.

These Programming-specific Terms shall be read together with IP’s Common General Customer Terms & Conditions and the applicable quotation, SOW, Work Order, accepted tender or project contract.

The General Terms shall govern matters of general application, including payment, taxes, confidentiality, general intellectual property principles, limitation of liability, force majeure, termination, governing law and dispute resolution, except to the extent specifically modified by the applicable Programming Terms or accepted project contract.

Where an accepted tender or project contract contains specific programming, software, source-code, cybersecurity, testing, warranty or other requirements that differ from these Terms, the accepted project contract shall govern the particular engagement to the extent of the inconsistency.

T&C-6 Engineering & Systems Version 4, Rev 02

Automation / System Integration Services

These Specific Terms apply to Automation / System Integration Services (“Integration Services”) provided by Industry Pro Solutions LLP (“IP”), whether as a standalone integration assignment or as part of a larger engineering, supply, programming, commissioning or automation project.

IP shall provide only the Integration Services, equipment, engineering, software, installation, testing, commissioning and other deliverables expressly identified in the applicable quotation, Statement of Work (“SOW”), Work Order, accepted tender or project contract.

The applicable project documents shall define, as relevant, the scope, deliverables, equipment, interfaces, standards, testing, commissioning, documentation, schedule, assumptions, exclusions and responsibilities of the parties.

IP’s responsibility shall be assessed against the agreed scope and acceptance criteria. IP shall not assume responsibility for an activity, equipment, interface or outcome merely because it may be necessary for the overall operation of the Customer’s plant or system, unless that responsibility is expressly included in the agreed scope.

IP shall perform the Services on the basis of the drawings, specifications, functional requirements, equipment information, existing programs, site information, network information and other inputs made available by the Customer or its authorised representatives and accepted as the basis of the work.

The Customer shall be responsible for the accuracy, completeness and authority of information supplied by it or on its behalf.

Where existing systems are involved, IP shall be entitled to rely on the condition and information made available for the agreed work. IP shall not be responsible for hidden, undocumented, obsolete, defective or incompatible conditions that are outside the agreed scope and were not reasonably identifiable from the information and inspection available to IP.

Where the project requires an approved Functional Design Specification (FDS), Control System Architecture, Panel General Arrangement (GA), I/O list, approved drawings or equivalent design baseline, the date of formal approval shall constitute the applicable design-freeze date. Changes after that date, including changes to I/O, control philosophy, logic, hardware layout, interfaces or approved drawings, may constitute a change in scope and shall be dealt with through the applicable change-control process.

Where no separate design-freeze document is specified, the approved SOW, Work Order, functional description or equivalent project document shall constitute the applicable baseline.

Where actual site, equipment or system conditions materially differ from the agreed basis, the resulting additional work, cost or schedule impact shall be dealt with through the applicable change-control process.

Where engineering, architecture, system design, panel design, network design, application design or other engineering forms part of the agreed scope, the applicable project documents shall identify the required deliverables and the extent of IP’s design responsibility.

Where Customer review or approval is required, the Customer shall provide such review or approval within the agreed period. IP shall be entitled to rely on an approved design or engineering baseline.

Changes requested after approval of an engineering or design baseline may constitute additional work and may result in corresponding changes to price, resources, testing and schedule.

Approval of an engineering document by the Customer shall not transfer to IP responsibility for Customer-owned requirements, process design, statutory duties or matters expressly retained by the Customer.

The applicable project documents shall identify, where relevant, equipment and materials to be supplied by IP, the Customer or third parties.

Where a make, model, specification or component is selected or mandated by the Customer, IP’s responsibility shall be limited to the activities expressly included in the agreed scope. IP shall not be responsible for defects, performance, compatibility, obsolescence, availability or continued support of Customer-specified or third-party/OEM equipment except to the extent expressly undertaken by IP.

Manufacturer/OEM warranties shall remain subject to the applicable manufacturer’s terms. IP shall not be deemed to extend, replace or enlarge an OEM warranty merely because IP supplies, installs, configures or integrates the equipment.

Where PLC, HMI, SCADA, IEC 61850 or other programming/configuration work forms part of the Integration Services, IP’s PLC/HMI/SCADA/Programming Specific Terms shall apply to that portion of the work.

The applicable SOW or Work Order shall specify, where relevant, the programming platforms, software versions, interfaces, licences, source-code requirements and deliverables.

The inclusion of programming within an Integration project shall not alter the intellectual-property rights applicable to IP’s pre-existing software, libraries, function blocks, tools, templates, methods, know-how or other reusable materials.

Where the Programming Terms and these Integration Terms overlap, the more specific provision applicable to the programming activity shall govern that activity, subject to the accepted project contract.

IP shall integrate the systems, equipment and interfaces specifically identified in the agreed scope.

Where the project requires IP to design the overall system architecture, the applicable project documents shall expressly identify that responsibility. Otherwise, IP’s responsibility shall be limited to the integration architecture and interfaces expressly included.

Integration of two or more systems does not by itself make IP responsible for the independent design, performance, safety, reliability or continued operation of each system.

For larger or multi-party projects, an Interface Responsibility Matrix (“IRM”) or equivalent document may be used to identify responsibilities of IP, the Customer, OEMs and other contractors. Where an IRM is agreed, it shall form part of the project basis.

Where industrial networking, communication systems or interfaces with other systems are included, the applicable project documents shall define the scope.

Network equipment, fibre, gateways, switches, routers, firewalls, time synchronisation, OPC interfaces, Distributed Control System (“DCS”), Manufacturing Execution System (“MES”), Enterprise Resource Planning (“ERP”), databases, cloud services or other external interfaces shall be IP’s responsibility only where expressly included.

Where an interface depends on Customer- or third-party-controlled infrastructure, IP shall not be responsible for failure, latency, incompatibility or loss of communication to the extent caused by that external infrastructure and not attributable to IP’s agreed Services.

Where IEC 61850 is expressly included, the applicable scope shall be defined in the SOW or project specification.

Depending on the assignment, this may include Intelligent Electronic Device (“IED”) configuration, Substation Configuration Language (“SCL”) engineering, system configuration, Generic Object Oriented Substation Event (“GOOSE”) configuration/testing, Manufacturing Message Specification (“MMS”) configuration/testing, Sampled Values configuration/testing, interoperability testing and related documentation.

The applicable IEC 61850 edition/version, devices, communication functions, configuration files, testing requirements and deliverables shall be those specifically agreed.

IP shall not be responsible for functions, devices, protection schemes, network infrastructure or interfaces outside the agreed IEC 61850 scope.

Where IEC 61850 communication depends on Customer- or third-party-supplied Ethernet infrastructure, IP shall not be responsible for communication failure, excessive latency, non-delivery or non-operation to the extent caused by network congestion, switches, VLAN configuration, multicast handling, routing, firewall configuration, topology, time synchronisation or other infrastructure conditions outside IP’s agreed scope.

Where cybersecurity activities are included, the applicable requirements, standards and deliverables shall be expressly identified in the project documents.

IP shall be responsible only for cybersecurity activities expressly included in its agreed scope. IP shall not be responsible for the security of the Customer’s overall Information Technology / Operational Technology (“IT/OT”) environment merely because IP is performing system integration.

Unless expressly included, responsibility for the Customer’s network environment, firewall infrastructure, operating systems, endpoint security, access policies, credentials, backup systems, third-party infrastructure and other Customer-controlled security measures shall remain with the Customer.

Where a specific cybersecurity standard or certification is required, including a requirement relating to the IEC 62443 series or another identified standard, it shall be expressly stated in the applicable project documents together with the required scope of conformity.

Where IP accesses or processes personal data in connection with an integration assignment, the respective roles and obligations of IP and the Customer shall be determined by the Digital Personal Data Protection Act, 2023 and other applicable law, and shall not be assumed merely from IP’s role as an integrator. Where the Customer determines the purpose and means of processing and IP processes personal data only on the Customer’s documented instructions, the parties shall document the corresponding Data Fiduciary/Data Processor responsibilities where required.

The Customer shall be responsible for establishing the lawful basis, notices, permissions and authorisations required for Customer-controlled systems and data, and for ensuring that IP’s access is authorised. IP shall process personal data only to the extent reasonably necessary for the agreed Services and in accordance with applicable law and the Customer’s lawful instructions.

Nothing in this clause transfers to IP responsibility for security controls, infrastructure or unauthorised access originating in Customer- or third-party-controlled systems. Any indemnity or allocation of data-breach responsibility shall remain subject to the General Terms and the applicable project contract.

Installation, erection, dismantling, cabling, termination, panel installation, equipment mounting or other physical site activities shall be performed by IP only where included in the agreed scope.

The Customer shall provide safe and timely site access, permits, shutdowns, isolations, utilities, lifting arrangements, work areas, facilities and other prerequisites identified in the project documents.

Where required site prerequisites are unavailable, unsafe or materially different from the agreed basis, IP may defer or reschedule the affected work and shall be entitled to an appropriate schedule adjustment and recovery of additional costs where applicable under the agreed commercial terms.

Testing shall be conducted in accordance with the agreed project requirements and applicable test procedures.

Depending on the assignment, testing may include Factory Acceptance Testing (“FAT”), Factory Integration Testing (“FIT”), Site Acceptance Testing (“SAT”), Site Integration Testing (“SIT”), functional testing, communication testing, interoperability testing, commissioning tests or other agreed tests.

The applicable tests, responsibilities, test facilities, test data, customer witnessing requirements, prerequisites and acceptance criteria shall be specified in the SOW, Work Order or approved test protocol.

Testing shall assess compliance with the agreed requirements and shall not create additional requirements that were not part of the agreed scope.

Where a test cannot be completed because a Customer or third-party prerequisite is unavailable, the affected test shall be rescheduled and the resulting time and cost consequences shall be dealt with under the applicable project terms.

Failure of a Customer or third party to provide a required test prerequisite shall not by itself constitute a failure of IP’s deliverable or prevent IP from issuing a Notice of Readiness for the affected test or milestone.

Acceptance shall be based on the acceptance criteria expressly agreed for the project.

Where testing identifies minor observations or punch points that do not prevent the agreed functionality from being achieved, such items shall be recorded and addressed through the agreed punch-point process. Such minor items shall not, by themselves, entitle the Customer to reject the complete project or withhold acceptance where the agreed acceptance criteria have otherwise been met.

Where the applicable project contract provides for deemed acceptance, that provision shall apply.

Where the applicable project documents do not specify an acceptance period, and to the extent permitted by the applicable contract and law, the relevant deliverable shall be deemed accepted if the Customer does not complete the agreed acceptance test or provide written rejection identifying specific, reproducible non-conformities within 10 Business Days after IP gives written notice that the deliverable is ready for acceptance.

Use of the integrated system for commercial production or its normal operational purpose shall constitute acceptance of the relevant functionality to the extent permitted by the applicable contract and law, except where such use is expressly identified as temporary testing, trial operation or commissioning.

Where the Customer continues to operate the integrated system in commercial production or normal operational use for more than 72 continuous hours after IP has notified readiness for acceptance, such continued use shall, to the extent permitted by the applicable contract and law, constitute deemed acceptance of the relevant functionality, unless the Customer has before expiry of that period issued a written rejection identifying specific, reproducible non-conformities against the agreed acceptance criteria.

A Customer description of the operation as a “trial”, “extended trial”, “performance run” or similar shall not by itself prevent deemed acceptance where the system is being used beyond the expressly agreed test conditions, trial duration or output limits in the project documents.

Where commissioning is included in the agreed scope, IP shall perform the agreed commissioning activities after the required site, equipment, safety and system prerequisites have been met.

Start-up, energisation, live cutover, migration, shutdown/restart or trial operation shall be performed by IP only where specifically included in the agreed scope.

The Customer shall provide required operating personnel, process conditions, shutdowns, permits, utilities and other prerequisites for commissioning and start-up.

Before live energisation, hot cutover, process introduction or other operation presenting a material electrical, mechanical or process hazard, the parties shall complete the applicable pre-commissioning checks, isolation/permit requirements and responsibility confirmations specified in the project safety plan, method statement, commissioning procedure or applicable law. Where the project documents require a signed pre-energisation or pre-commissioning checklist, IP shall not be required to authorise or participate in energisation until the required checklist has been completed.

The Customer shall not energise, operate, bypass interlocks, introduce process media or place the system into hazardous or commercial operation contrary to the agreed commissioning procedure without IP’s written concurrence where such concurrence is expressly required by the project documents. The Customer shall be responsible for consequences arising from its decision to proceed contrary to those requirements, except to the extent directly caused by IP’s proven negligence, wilful misconduct or other liability that cannot lawfully be excluded.

Changes required due to revised Customer requirements, unforeseen site conditions, defective or changed third-party equipment, unavailable prerequisites or other matters outside IP’s agreed scope shall be treated through the applicable change-control process.

IP shall not be responsible for production losses, process disruption or other consequences arising from a Customer decision to operate, energise or place a system into service before completion of agreed testing or acceptance, except to the extent directly caused by IP’s proven breach of its agreed scope.

Where statutory inspection, approval, electrical inspector clearance, energisation permission, factory licence, fire approval or other regulatory approval is required, the party responsible for obtaining that approval shall be the party identified in the applicable project documents or, where not identified, the Customer as owner/operator of the installation. IP shall provide only those documents, tests or assistance expressly included in its scope and shall not be deemed responsible for obtaining an approval merely because its equipment or engineering forms part of the installation.

Where specific system performance parameters are required, they shall be expressly stated in the applicable project documents together with the measurement method, test conditions, assumptions and exclusions.

Unless expressly agreed otherwise, IP does not guarantee continuous plant operation, production output, production quality, overall plant availability, energy savings, process performance, performance of Customer/OEM equipment or performance of external systems and infrastructure.

Where IP has expressly accepted a system performance guarantee, the applicable project documents shall define the specific performance parameter, baseline, measurement method, test conditions, permitted exclusions and remedy. No performance obligation shall be implied merely from IP’s role as system integrator.

Project schedules shall be based on the assumptions and dependencies identified in the applicable project documents.

Where progress is delayed by the Customer, OEMs, third parties, site conditions, non-availability of equipment or information, delayed approvals, shutdown requirements, testing prerequisites, access restrictions or other matters outside IP’s responsibility, the applicable completion dates shall be adjusted accordingly.

IP shall be entitled to recover additional costs resulting from such delay where applicable under the agreed commercial terms.

Where the project contract contains liquidated damages, delay damages, milestone deductions or other delay consequences, IP’s exposure shall be only to the extent expressly accepted by IP in that contract. Customer or third-party delay shall not be treated as IP delay, and the contractual completion dates and associated consequences shall be adjusted where the project contract or applicable law permits.

IP shall promptly communicate material delays attributable to matters reasonably identifiable during execution.

Any change to the agreed scope may affect price, schedule, resources, engineering, procurement, testing, commissioning, documentation or warranty.

Customer-requested changes, changes arising from site conditions or third parties, changes to approved engineering/design baselines, and changes requested after completion of an agreed testing or acceptance stage shall be assessed through the applicable change-control process.

IP shall not be required to undertake material additional work without appropriate technical and commercial approval, except where an agreed change-control mechanism expressly permits such work.

Instructions or requests given verbally by Customer site personnel shall not, by themselves, amend IP’s scope, price, schedule, warranty or other contractual obligation.

A scope or commercial change shall bind IP only when confirmed through the agreed change-control mechanism or through written or traceable electronic communication from a Customer representative authorised to approve such changes and accepted by IP. Where immediate action is required for safety or protection of equipment, IP may take the minimum reasonable action necessary and shall record the action and resulting commercial/schedule impact as soon as practicable.

The extent of as-built drawings, software/configuration backups, network records, test records, certificates, manuals, parameter records and other technical documentation to be supplied by IP shall be specified in the applicable project documents.

Upon completion of the agreed Services and satisfaction of the applicable acceptance requirements, IP shall hand over the agreed deliverables and final configuration/version.

Unless separately contracted, responsibility for maintaining operational backups, controlling subsequent changes and protecting the system from unauthorised modification after handover shall rest with the Customer.

The final configuration/version handed over by IP shall be the reference baseline for warranty and post-completion responsibility, subject to subsequent authorised changes.

Where training is included, IP shall provide training to the extent and for the number of personnel, duration, subject matter and format specified in the applicable project documents.

Training shall not constitute continuing operational, maintenance or technical support unless separately agreed.

The Customer shall remain responsible for ensuring that its personnel are appropriately authorised and competent to operate the completed system after handover.

IP shall correct defects attributable to IP’s agreed Integration Services during the applicable warranty or Defects Liability Period (“DLP”), subject to the agreed warranty conditions.

Unless a different trigger is expressly stated in the applicable project contract, the warranty/DLP shall commence on the earliest of: (a) formal acceptance; (b) deemed acceptance under the applicable project terms; or (c) 30 days after IP’s written Notice of Readiness for the agreed commissioning or acceptance, provided the relevant deliverable has been made available for such activity.

The warranty/DLP shall apply to conformity of IP’s agreed Services with the specified requirements and acceptance criteria. It shall not constitute a guarantee of uninterrupted operation or overall plant performance.

Where a covered defect is established, IP’s primary remedy shall be correction, re-performance or other remedy expressly agreed for the project.

The warranty shall not apply to defects or failures caused by modification of the system by the Customer or a third party; changes to hardware, firmware or software by others; misuse or operation outside the agreed application; failure of Customer-supplied or third-party/OEM equipment; failure of Customer infrastructure, utilities or networks; unauthorised intervention; normal wear or deterioration; or matters outside IP’s agreed scope.

Post-commissioning support, remote support, on-site support, troubleshooting, optimisation, modification or maintenance shall apply only where separately included or contracted.

IP’s standard AMC offering is non-comprehensive preventive maintenance. Under the standard AMC, IP’s responsibility is limited to the preventive-maintenance activities and equipment specifically identified in the applicable AMC scope.

Where a particular project or Customer contract expressly requires a different AMC scope, including comprehensive maintenance, the accepted project contract shall define that scope and shall govern the engagement.

A warranty/DLP for Integration Services shall not automatically create an obligation to provide continuing technical support, optimisation, modification or maintenance after the warranty/DLP period.

The intellectual-property provisions of IP’s Common General Customer Terms and, where applicable, Programming Terms shall apply.

Project-specific deliverables shall be provided in accordance with the rights expressly agreed for the particular engagement.

IP shall retain its rights in pre-existing and reusable software, libraries, tools, templates, methods, know-how and other intellectual property unless expressly transferred or licensed.

Where Programming Services form part of the Integration Services, the ownership, licensing, source-code and assignment provisions of the Programming Terms shall apply to that portion of the work.

Third-party and OEM intellectual property shall remain subject to the rights and licences applicable to them.

Project-specific commercial conditions, including milestone payments, mobilisation/advance, retention, performance security, delay damages, travel, site expenses, testing requirements, liquidated damages, warranty/DLP obligations and other special conditions shall be governed by the applicable quotation, SOW, Work Order, accepted tender or project contract.

Where IP accepts a tender or other Customer contract containing terms different from these Specific Terms, the accepted project contract shall govern to the extent of the inconsistency.

The applicability and commercial impact of such terms shall be assessed by IP as part of its tender/contract review before acceptance.

Nothing in these Specific Terms shall be interpreted as overriding an obligation expressly accepted by IP in a tender or project contract.

IP’s liability for the Integration Services shall be governed by the limitation of liability and other risk-allocation provisions of the Common General Terms, except to the extent expressly modified by an accepted project contract.

IP shall not be liable for indirect, incidental, special or consequential losses, including production loss, downtime, loss of profit, loss of revenue, loss of business or loss of opportunity, to the extent permitted by applicable law.

Nothing in these Specific Terms shall expand IP’s liability merely because IP has acted as an integrator or has coordinated Customer, OEM or third-party equipment.

Where IP expressly accepts responsibility for an identified system performance parameter or project outcome, the liability and remedy applicable to that obligation shall remain subject to the agreed project-specific terms and the Common General Terms, except to the extent an accepted contract expressly provides otherwise.

IP may suspend or terminate the Services in accordance with the Common General Terms and applicable project contract.

IP may also suspend, defer or reschedule affected work where required access, equipment, approvals, utilities, safety conditions, third-party dependencies or other essential prerequisites are unavailable, or where agreed payments remain outstanding.

Upon suspension, cancellation or termination, the Customer shall pay for Services performed, equipment and materials supplied or committed, non-cancellable third-party commitments, demobilisation, storage and other amounts properly due under the applicable project terms.

Termination shall not affect obligations that by their nature are intended to survive completion or termination.

These Automation / System Integration Specific Terms shall be read together with: 1. IP’s Common General Customer Terms; 2. IP’s PLC/HMI/SCADA/Programming Terms, where programming or software services form part of the engagement; and 3. the applicable quotation, SOW, Work Order, accepted tender or project contract.

The General Terms govern matters of general application. The Programming Terms govern programming-specific matters where applicable. These Integration Terms govern integration-specific matters.

Where the applicable project contract contains specific technical or commercial terms, those terms shall govern the particular engagement to the extent of any inconsistency.

The governing law, dispute resolution, arbitration and jurisdiction provisions shall be those contained in IP’s Common General Terms or the applicable written agreement.

Nothing in these Specific Terms shall prevent an accepted tender or project contract from prescribing a different governing law, dispute-resolution mechanism or jurisdiction for the particular engagement.

T&C-7 Engineering & Systems Version 4, Rev 03 - Internal Review Draft

IT/OT, Industrial Digitalisation & Connected Automation

These Specific Terms apply to IT/OT, industrial digitalisation, connected automation and related remote or managed technical services (“IT/OT Services”) provided by Industry Pro Solutions LLP (“IP”).

IT/OT Services may be provided as a standalone service or together with programming, system integration, installation, commissioning, maintenance or other services.

Where temporary or emergency assistance is requested during a plant outage or other urgent situation, IP may provide the minimum assistance reasonably necessary to address the immediate issue where authorised to do so. Such assistance shall not by itself amend IP’s agreed scope, price, warranty or other contractual obligation. Any material addition or change to scope shall be confirmed through the agreed written or traceable electronic change-control mechanism as soon as practicable, and preferably within forty-eight (48) hours of the emergency action.

Depending on the agreed scope, IT/OT Services may include industrial network assessment or configuration, OT/IT connectivity, SCADA/DCS connectivity and support, data acquisition, historians, dashboards, remote monitoring, remote technical support, remote access configuration, industrial cybersecurity activities, edge/cloud connectivity, recipe management, alarm/event support, technical coordination and related activities.

IP shall be responsible only for the IT/OT Services, systems, assets, interfaces, data and outcomes expressly identified in the applicable quotation, Statement of Work (“SOW”), Work Order, Service Schedule, accepted tender or project contract.

IT/OT environments commonly involve Customer, OEM, system integrator, telecommunications, IT, cloud and other third-party systems. IP’s responsibility shall extend only to the components and interfaces expressly included in its agreed scope.

IP shall not become responsible for the overall operation, security, availability, performance or business continuity of the Customer’s IT/OT environment merely because IP has access to it or provides services in relation to part of it.

Where responsibilities are shared, the applicable project documents may define an asset list, responsibility matrix, network boundary, interface list or equivalent baseline. IP shall be entitled to rely on such agreed boundaries.

Where IP is engaged to assess, support, connect or improve an existing IT/OT environment, IP shall base its work on the information, access and technical condition reasonably available at the time.

The assessment may identify vulnerabilities, obsolete equipment, unsupported software, configuration weaknesses, communication problems, documentation gaps or other observations. Identification of an observation does not constitute a guarantee that all defects or vulnerabilities have been identified.

Unless expressly included, IP is not responsible for correcting every issue identified during an assessment. Recommendations, risk observations and proposed remediation shall not constitute a commitment to implement the recommendation unless separately agreed.

Where IT/OT architecture or connectivity is included, the applicable SOW shall identify the systems, network segments, interfaces and design activities included.

Depending on the assignment, activities may include network segmentation, Industrial Demilitarized Zone (IDMZ) design or configuration, firewall/interface configuration, remote-access architecture, protocol gateways, data transfer, OPC interfaces, industrial Ethernet, Virtual Local Area Network (VLAN) configuration, routing or other connectivity work.

IP shall not be responsible for the security, capacity, availability or configuration of Customer-controlled or third-party network infrastructure except to the extent expressly included in IP’s scope.

Where an external network, telecommunications service, firewall, cloud service or third-party platform is a dependency, failure or degradation of that dependency shall not constitute failure of IP’s Services to the extent not attributable to IP.

Where remote access is required, the access method, permitted systems, duration, users, responsibilities and security controls shall be agreed before access is provided.

The Customer shall authorise remote access and shall provide or approve the required credentials, VPN, jump-server or other access mechanism unless provision of such infrastructure is expressly included in IP’s scope.

IP shall use remote access only for the agreed purpose and shall not knowingly share Customer credentials with unauthorised persons.

The Customer shall promptly disable or revoke IP personnel’s remote-access credentials when the relevant Services end, when access is no longer required, or when the Customer is notified that an IP personnel change requires revocation. IP shall similarly withdraw or disable access under its control when no longer required.

Where a Customer-controlled account or access mechanism remains active because the Customer has not completed revocation after being notified or after the Services have ended, IP shall not be responsible for subsequent use of that Customer-controlled access except to the extent directly attributable to IP.

The Customer remains responsible for its access-control policies and Customer-controlled infrastructure. IP shall be responsible for actions performed by IP personnel within the agreed access scope, subject to the General Terms and applicable law.

Where cybersecurity is included, the applicable SOW shall identify the services and the required standard or outcome. Such services may include OT cybersecurity assessment, asset identification, vulnerability review, network-security review, hardening recommendations, access-control review, monitoring, incident-response planning, patch-management coordination or other specifically agreed activities.

The ISA/IEC 62443 series may be used where expressly required. Any statement of conformity, certification, Security Level or other formal compliance outcome shall apply only where IP has expressly undertaken the relevant assessment or certification activity.

IP shall not be responsible for vulnerabilities, malware, unauthorised access, cyber incidents or security weaknesses originating in Customer- or third-party-controlled systems, software, credentials, networks or infrastructure except to the extent directly attributable to IP’s agreed Services and subject to the applicable liability provisions.

Where IP identifies a material cybersecurity risk and provides a recommendation, patch requirement, hardening measure or other remediation recommendation, the Customer shall decide whether and when to implement it. To the extent a subsequent incident or operational failure is directly caused by the Customer’s documented decision not to implement an identified and reasonably described IP recommendation, IP shall not be responsible for that resulting consequence, except to the extent directly attributable to a separate breach or negligence of IP.

The parties acknowledge that industrial cybersecurity is a responsibility activity involving asset owners, automation suppliers, integrators and service providers.

Where the ISA/IEC 62443 series or another cybersecurity framework is specified, the applicable scope, role, deliverable and assessment criteria shall be identified in the project documents. IP shall not be deemed to have accepted responsibility for the Customer’s complete cybersecurity programme merely because IP is engaged for a specific IT/OT activity.

The Customer shall retain responsibility for its overall security governance, business risk acceptance, policies, user management, physical security and other responsibilities not expressly assigned to IP.

Where monitoring or remote support is included, the applicable Service Schedule shall specify the systems or assets monitored, monitoring hours, review frequency, communication channels, response targets and exclusions.

Monitoring or receipt of an alarm shall not by itself constitute an obligation to restore the affected system, dispatch personnel, correct the underlying fault or guarantee continuous availability unless such response is expressly included.

Where IP provides advisory support, issue analysis or recommendations, the Customer shall remain responsible for operational decisions, plant intervention and execution unless IP has expressly accepted responsibility for those activities.

Any Service Level Agreement (“SLA”), response time, uptime target, monitoring window, escalation period or restoration commitment shall apply only where expressly stated in the applicable SOW or Service Schedule.

A response time is not a guarantee of restoration time unless restoration time is expressly stated.

Response or monitoring commitments may depend on availability of remote access, communications, Customer personnel, OEM support, spare parts, site access, utilities and other prerequisites. Failure or delay of such prerequisites may affect the applicable response or restoration commitment.

Where a cybersecurity or operational recommendation remains unimplemented by the Customer after IP has identified it and the Customer has been given sufficient information to act, the resulting risk shall remain with the Customer to the extent attributable to that decision.

A response time is not a guarantee of restoration time unless restoration time is expressly stated.

Response or monitoring commitments may depend on availability of remote access, communications, Customer personnel, OEM support, spare parts, site access, utilities and other prerequisites. Failure or delay of such prerequisites may affect the applicable response or restoration commitment.

Where IP provides SCADA, Distributed Control System (DCS) or related operational support, the scope may include monitoring, troubleshooting consultation, alarm/event review, configuration support, backup coordination, data review, vendor coordination and other agreed activities.

Unless expressly included, such support does not transfer to IP responsibility for operating the plant, making production decisions, approving process changes, overriding safety systems or guaranteeing plant availability or production output.

Changes to control logic, interlocks, recipes, set points or other operational parameters shall be performed only where expressly authorised and included in IP’s scope.

Where recipe management is included, the applicable SOW shall identify the systems, recipes, parameters, approval process, access rights, backup requirements and activities included.

IP may provide recipe creation, modification, version management, transfer, access-control or related technical support only to the extent expressly agreed.

Unless expressly included, IP shall not be responsible for the correctness of the process formula, production parameters, product specification, production outcome or Customer’s approval of a recipe.

The Customer shall remain responsible for authorising recipes and process parameters and for ensuring that only authorised personnel approve or release them for production.

Where IP provides data acquisition, historians, dashboards, reports or analytics, the applicable project documents shall identify the data sources, variables, retention period, reporting frequency, calculations and deliverables where material.

Data displayed, aggregated or analysed by IP shall depend on the accuracy, completeness, availability and time synchronisation of the underlying systems and sources.

Unless expressly included, IP does not warrant completeness or accuracy of historical data originating from Customer or third-party systems, nor does it guarantee business decisions or production outcomes based on such data.

Where cloud, edge computing, hosted services, Software as a Service (SaaS), telecommunications or third-party platforms are used, the applicable project documents shall identify the relevant service, provider, subscription/licence responsibility and interface.

IP shall not be responsible for service interruption, data loss, performance degradation, policy changes, licence changes, cyber incidents or other failures of a third-party platform except to the extent directly attributable to IP’s agreed Services.

The Customer shall maintain its own subscriptions, licences, domain ownership, cloud accounts and administrator rights unless expressly included in IP’s scope.

Software, firmware, operating systems, drivers, SCADA/DCS platforms, databases, cloud services and other software used in IT/OT Services may be subject to OEM or third-party licences.

The Customer shall provide or procure required licences unless expressly included in IP’s scope. IP shall not grant rights beyond those available to IP.

Where IP develops or modifies software, configuration, scripts, algorithms, historian logic, dashboards or other copyrightable materials, the ownership and licensing arrangements shall be stated in the applicable SOW, Work Order or other written agreement.

IP shall retain ownership of its pre-existing software, libraries, function blocks, scripts, algorithms, templates, methods, tools, know-how and reusable components. A Customer-specific deliverable shall not transfer ownership of such background or reusable IP merely because it is used in the Services.

Where the parties expressly agree to an assignment of copyright in a Customer-specific work, the assignment shall be in writing and shall identify the work and specify the rights assigned, duration, territorial extent and consideration to the extent required by applicable law. No assignment shall be implied merely from payment for Services unless the applicable written agreement expressly provides for it.

Unless expressly agreed otherwise, the Customer shall receive the rights expressly granted in the applicable project documents to use the agreed deliverables for its intended operational purpose, subject to third-party/OEM licence restrictions.

Unless expressly included, IT/OT Services do not include unlimited software upgrades, operating-system upgrades, licence renewals or migration to future platform versions.

The Customer shall maintain appropriate backups of critical IT/OT configurations, PLC/HMI/SCADA programs, databases, recipes, historian data, network configurations and other operational information unless backup and recovery are expressly included in IP’s scope.

Where IP performs backup or restoration, the applicable scope shall identify the systems, backup method, storage location, retention and restoration testing requirements where material.

IP shall not be responsible for restoration of data or configuration that was already missing, corrupted, inaccessible or unavailable before IP’s involvement unless recovery is expressly included.

A backup shall not be treated as successfully restorable merely because a backup file has been created; restoration testing shall be required only where expressly included.

Where IP has been contracted for incident-response or recovery services, the applicable SOW shall define the response scope, availability and escalation process.

The Customer shall notify IP without undue delay and, where the incident may affect systems within IP’s agreed Services or remote-access environment and may trigger applicable statutory reporting obligations, as soon as practicable and preferably within six (6) hours of becoming aware of the incident. This contractual notification is intended to facilitate containment, coordination and compliance support; it does not transfer the Customer’s or any other party’s statutory reporting responsibility to IP.

Where mandatory reporting to the Indian Computer Emergency Response Team (CERT-In) or another authority applies to the Customer or another responsible entity, that entity shall remain responsible for making the required report within the applicable statutory timeframe. Information available at the time may be supplemented in accordance with applicable directions.

Otherwise, IP may provide reasonable technical assistance when requested, subject to availability and applicable commercial terms.

Otherwise, IP may provide reasonable technical assistance when requested, subject to availability and applicable commercial terms.

IP shall not be responsible for investigating or containing an incident beyond its agreed scope, and shall not be deemed to have accepted responsibility for an incident merely because IP previously provided IT/OT Services to the affected environment.

The Customer shall promptly inform IP of known or suspected cyber incidents that may affect IP’s remote access, credentials, software, deliverables or agreed Services.

Where IP processes personal data in connection with IT/OT Services, the parties shall determine and document their respective roles and obligations under applicable data-protection law based on the actual processing arrangement.

Where the Customer determines the purpose and means of processing and IP processes personal data only on the Customer’s documented instructions, the parties shall document the corresponding Data Fiduciary/Data Processor responsibilities where required.

Where the Customer provides IP with personal data, including employee or contractor names, contact details, user identifiers, access records or similar information, the Customer shall be responsible for ensuring that the disclosure and requested processing are lawfully authorised and supported by the notices, consents or other lawful basis required in the circumstances. IP shall process such data only for the agreed Services, in accordance with applicable law and lawful Customer instructions.

Nothing in this clause assumes that consent is the only lawful basis for processing, or that IP is necessarily a Data Processor in every engagement.

Where the Customer determines the purpose and means of processing and IP processes personal data only on the Customer’s documented instructions, the parties shall document the corresponding Data Fiduciary/Data Processor responsibilities where required.

The Customer shall be responsible for lawful authorisation of Customer-controlled systems, user access and personal-data processing under its control. IP shall process personal data only to the extent reasonably necessary for the agreed Services and in accordance with applicable law and lawful Customer instructions.

Where Indian cyber incident, logging or other statutory requirements apply to a party or system, the responsible party shall comply with the requirements applicable to it. IP shall not assume regulatory responsibility for Customer-controlled systems merely because it provides IT/OT Services.

Changes to network architecture, firewall rules, remote access, software versions, SCADA/DCS configuration, recipes, databases, cloud services, security controls or other IT/OT components may affect system availability, cybersecurity and interoperability.

IP shall undertake material changes only within the agreed scope or through the applicable change-control process.

Emergency changes necessary to protect equipment, safety or system integrity may be undertaken only to the minimum extent reasonably necessary where IP is authorised to act, and shall be documented and commercially addressed as soon as practicable.

The Customer remains responsible for operation of its plant, machinery and production processes, including process decisions, production parameters, safety decisions, user authorisations and operational continuity, except to the extent expressly assigned to IP under a specific written agreement.

IP’s technical recommendations, alerts, reports and observations are advisory unless the applicable agreement expressly assigns IP an operational responsibility.

The Customer shall maintain competent personnel capable of making and implementing operational decisions affecting the plant and its IT/OT environment.

IP shall not intentionally bypass safety functions, protection systems or operational safeguards except where expressly authorised in writing or through another traceable electronic record by the Customer’s designated authorised plant/operations authority, specifically identifying the equipment/function, reason, duration and applicable precautions, and where such action is included within IP’s agreed scope and permitted by applicable procedure and law.

IP may refuse or defer a requested bypass, forcing of an I/O point, override of an interlock or other safety-related intervention where IP reasonably considers the proposed action unsafe, inadequately authorised or outside its agreed competence or scope.

Customer authorisation shall not transfer to IP the Customer’s statutory, operational or safety responsibilities. IP shall not be required to accept responsibility for the safety of the plant merely because it performs an authorised intervention.

Where a safety-related intervention is performed, the Customer shall remain responsible for ensuring that the relevant safety function is restored, tested and formally returned to service before normal operation, unless those activities are expressly included in IP’s scope.

Where a change may affect safety, interlocks, emergency shutdowns or other critical functions, the applicable Customer approval, testing and validation requirements shall be followed.

IP shall not be responsible for consequences arising from Customer or third-party operation, bypass, modification or use of the system outside the agreed procedures or scope, subject to IP’s own contractual and legal responsibilities.

The extent of reports, asset registers, network diagrams, cybersecurity assessment reports, backup records, configuration records, dashboards, SOPs, training and other documentation shall be specified in the applicable scope.

IP shall not be required to create documentation or records beyond the agreed deliverables merely because they may be useful for future operation or maintenance.

Where IP conducts training or knowledge-transfer sessions, the scope shall be limited to the personnel, duration, subject matter and format expressly agreed.

Where a warranty is provided for IT/OT Services, it shall apply to conformity of the agreed Services with the specified requirements and acceptance criteria.

Unless otherwise stated, the warranty shall not constitute a guarantee of continuous network availability, uninterrupted SCADA/DCS operation, cybersecurity against future threats, production output, business continuity or performance of Customer or third-party systems.

The warranty shall not apply to changes made by the Customer or third parties, changes to hardware/software or external systems, unsupported versions, cyber incidents originating outside IP’s control, misuse, unauthorised access, changes in third-party services, or circumstances outside IP’s agreed scope.

Where a covered service defect is established, IP’s primary remedy shall be correction or re-performance of the affected Service.

Troubleshooting, optimisation, additional configuration, cybersecurity remediation, software upgrades, recipe changes, additional monitoring, on-site support or other work after completion of the agreed Services shall be chargeable unless expressly included in the warranty, Service Schedule, AMC or other contract.

A periodic or managed support arrangement shall not automatically include project work, corrective repair, replacement of equipment, major software upgrades or system redesign unless expressly included.

These IT/OT, Industrial Digitalisation & Connected Automation Terms shall be read together with IP’s Common General Customer Terms and, where applicable, the PLC/HMI/SCADA/Programming, Automation/System Integration, Installation/Commissioning or other applicable Specific Terms.

Where programming or software-development work forms part of an IT/OT assignment, the Programming Terms shall govern programming-specific matters.

Where system integration forms part of an IT/OT assignment, the Integration Terms shall govern integration-specific matters.

Where an accepted tender, SOW, Work Order or project contract contains different requirements, the accepted project contract shall govern to the extent of the inconsistency.

Any Service Level Agreement (SLA), service credits, response commitments, uptime commitments, cybersecurity obligations, performance guarantees, indemnities, data-breach allocations, liability caps or other special commercial conditions shall apply only where expressly accepted in the applicable project documents.

IP’s liability shall otherwise be governed by the Common General Terms and applicable project contract.

Nothing in these Specific Terms shall expand IP’s liability merely because IP has access to an IT/OT environment or provides remote or managed technical services. Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law. Any additional carve-outs, if agreed, shall be those expressly stated in the Common General Terms or applicable project contract.

IP’s liability shall otherwise be governed by the Common General Terms and applicable project contract.

Nothing in these Specific Terms shall expand IP’s liability merely because IP has access to an IT/OT environment or provides remote or managed technical services.

IP may suspend or terminate the Services in accordance with the Common General Terms and applicable agreement.

IP may suspend remote access or affected Services where required credentials, network access, safety conditions, security controls, Customer cooperation or other essential prerequisites are unavailable or where continued access may expose IP or the Customer to material security or operational risk.

Upon suspension or termination, the Customer shall pay amounts properly due for Services performed and committed costs in accordance with the applicable commercial terms.

The governing law, dispute resolution, arbitration and jurisdiction provisions shall be those contained in the Common General Terms or applicable written agreement.

Nothing in these Specific Terms shall prevent an accepted tender or project contract from prescribing a different governing law, dispute-resolution mechanism or jurisdiction for the particular engagement.

T&C-8 Engineering & Systems Version 4, Rev 03 - Internal Review Draft

Installation, Commissioning & Handover Support

These Specific Terms apply where Industry Pro Solutions LLP (“IP”) is engaged for installation, erection, assembly, cabling, termination, testing, commissioning, start-up, cutover, handover support or related site services (“Services”).

The Services may be provided as a standalone assignment or together with equipment supply, programming, system integration, retrofit, maintenance, IT/OT or other services.

The exact scope shall be limited to the activities expressly identified in the applicable quotation, Statement of Work (“SOW”), Work Order, Service Schedule, accepted tender or project contract. Installation or commissioning of one component or system shall not by itself make IP responsible for the complete plant, machine or process.

Where the assignment involves Customer, EPC contractor, OEM, civil contractor, electrical contractor, mechanical contractor, instrumentation contractor or other third parties, the applicable project documents shall identify responsibilities and interfaces.

IP shall be responsible only for the work allocated to IP. Responsibility for design, manufacture, civil works, mechanical works, utilities, third-party equipment, statutory approvals, process performance or other activities not expressly included shall remain with the responsible Customer or third party.

Where an Interface Responsibility Matrix, approved drawings, method statement, commissioning procedure or similar document is agreed, IP shall be entitled to rely upon the information and boundaries contained in it.

Where IP is required to work on an existing installation, IP shall be entitled to rely on the condition and information reasonably observable or provided at the time of survey or mobilisation.

Concealed defects, undocumented modifications, unsafe conditions, incorrect drawings, legacy wiring, inaccessible equipment, unsuitable foundations, incorrect dimensions, damaged equipment or other pre-existing conditions that materially affect the Services shall be treated as a change or additional requirement unless expressly included in IP’s scope.

A site survey or inspection shall not constitute a guarantee that all concealed or latent conditions have been identified.

The Customer shall ensure that the site, equipment and work fronts are ready on the agreed date, including required access, foundations/supports, clearances, utilities, lighting, ventilation, safe working conditions, permits, isolation arrangements, process availability and other prerequisites identified in the project documents.

Where site readiness is incomplete or materially different from the agreed basis, IP may defer or suspend the affected work and shall be entitled to appropriate schedule adjustment and, where applicable, waiting, additional mobilisation and other reasonable costs.

The party responsible for obtaining statutory approvals, electrical inspector approvals, energisation permissions, work permits, shutdown permissions, factory or environmental permissions and other regulatory approvals shall be identified in the applicable project documents.

Where the Central Electricity Authority (Measures Relating to Safety and Electric Supply) Regulations, 2023, as amended from time to time, or applicable State/Appropriate Government requirements apply, the Customer and the other responsible parties shall obtain the approvals, inspections, self-certifications, competent-person supervision and other statutory requirements applicable to the installation before energisation or commencement of supply.

For installations requiring approval or inspection by an Electrical Inspector, IP shall not be required to proceed with energisation until the applicable statutory approval or other legally permitted pre-energisation requirement has been satisfied, unless IP’s expressly agreed scope includes the statutory approval activity itself.

Unless expressly included, IP’s scope shall be limited to providing the tests, documents or technical assistance expressly required from IP for such approvals. IP shall not be deemed responsible for obtaining a statutory approval merely because its work forms part of the installation.

Unless expressly included, IP’s scope shall be limited to providing the tests, documents or technical assistance expressly required from IP for such approvals. IP shall not be deemed responsible for obtaining a statutory approval merely because its work forms part of the installation.

Where applicable law requires inspection or approval before energisation, the parties shall comply with the applicable requirements before the affected installation is energised.

The Customer shall provide a safe work environment and shall implement required isolation, lockout/tagout, permit-to-work, access control and site safety arrangements applicable to the Services.

IP may refuse or stop work where IP reasonably considers that personnel, equipment or the installation are exposed to material safety risk or where required safety controls are absent or inadequate. Such stoppage shall not constitute IP delay where the cause is outside IP’s responsibility.

Customer instructions shall not require IP personnel to perform unsafe work or work contrary to applicable law, safety procedures or IP’s reasonable professional judgement.

Unless expressly included, the Customer shall provide required lifting equipment, cranes, scaffolding, work platforms, temporary power, lighting, compressed air, water, tools, consumables, access equipment, competent assistance, storage space and other site facilities identified in the agreed scope.

Customer-provided equipment, materials and facilities shall be suitable, safe and available when required. IP shall not be responsible for delay, damage or additional work arising from their inadequacy, failure or unavailability except to the extent directly caused by IP.

Materials, equipment and spare parts supplied by the Customer or third parties shall be available, complete and reasonably protected from damage before IP commences the relevant work.

Where IP identifies apparent shortage, damage or incompatibility before use, IP shall notify the Customer where reasonably practicable. IP shall not be responsible for defects or damage existing before IP’s custody or use.

Responsibility for storage, preservation and protection of equipment between delivery, installation, commissioning and handover shall be allocated in the project documents. Where not allocated, the owner/operator of the equipment shall remain responsible for its protection except during IP’s active custody of the equipment.

IP shall perform only the installation and erection activities included in the agreed scope.

Unless expressly included, IP shall not be responsible for civil construction, structural adequacy, foundations, building works, mechanical design, lifting engineering, plant utilities, incoming power quality or other enabling works.

Completion of physical installation shall mean completion of the installation activities included in IP’s scope and shall not by itself constitute acceptance of the complete plant or a guarantee of production performance.

Pre-commissioning tests shall be performed in accordance with the agreed procedures and applicable scope.

Where a test requires Customer or third-party participation, utilities, process conditions, communication links, OEM access, calibrated instruments, safety approvals or other prerequisites, those prerequisites shall be available before the relevant test is scheduled.

A test that cannot be completed because a prerequisite is unavailable shall not constitute failure of IP’s Services. IP may document the status and issue a Notice of Readiness or equivalent record for the affected activity.

Commissioning may include energisation, parameterisation, functional checks, I/O checks, sequence checks, trial operation, tuning, integration checks, start-up assistance and other activities expressly included.

Commissioning is intended to establish that the equipment or system performs the agreed commissioning functions under the agreed test conditions. Unless expressly stated, commissioning does not constitute a guarantee of plant capacity, production rate, product quality, energy consumption, uptime or performance of equipment or systems supplied or controlled by others.

Energisation, hot cutover, process introduction and other high-risk transition activities shall be undertaken only after the applicable readiness checks, permits, isolation controls, Customer approvals and agreed procedures have been completed.

Before initial energisation or hot cutover where IP is participating in the activity, the Customer and IP shall complete the portions of a Pre-Energisation / Cutover Safety Checklist applicable to their respective responsibilities. The Customer shall remain responsible for Customer-controlled isolation points, upstream/downstream safety systems, guarding, process conditions, statutory permissions and the decision to place the plant or equipment into operational service. IP shall remain responsible for the readiness of the IP scope expressly allocated to it.

A joint checklist or sign-off shall not transfer statutory or operational responsibility from the party to whom it is assigned, and shall not by itself constitute acceptance of the complete plant.

IP may decline or defer energisation, cutover or testing where required safety, statutory or readiness conditions within or affecting its agreed scope have not been met.

Where the Customer or another party controls the energisation or cutover decision, that party shall remain responsible for the decision and for the operational conditions under which it is made, except to the extent directly attributable to IP’s breach of its agreed scope.

IP may decline to proceed where required safety or readiness conditions have not been met.

The completion of commissioning may depend on OEM equipment, EPC works, utilities, mechanical systems, instrumentation, network infrastructure, software licences, process material, Customer operators or other third parties.

IP shall not be responsible for failure or delay caused by a dependency outside IP’s agreed responsibility.

Where such dependency prevents completion, IP may record the outstanding dependency, complete the portions of its work that can reasonably be completed and seek schedule and commercial adjustment for the affected balance.

Where commissioning is interrupted, repeated or prevented for reasons not attributable to IP, including Customer or third-party non-readiness, IP shall not be required to provide unlimited repeat commissioning at the original price.

Additional site visits, extended mobilisation, waiting time, additional engineering, travel, accommodation or other resulting costs shall be dealt with under the applicable commercial terms or change-control process.

IP shall document the reason for an unsuccessful or incomplete commissioning activity where reasonably practicable.

Working hours, overtime, night work, holiday work and other working conditions shall be as specified in the applicable commercial terms.

Where IP personnel are required to wait, remain at site, return to site or remobilise because the Customer or a third party has not provided the agreed prerequisites, IP shall be entitled to the applicable waiting, additional working, travel, accommodation and mobilisation charges.

A Customer request to keep personnel available without productive work shall constitute chargeable time where permitted by the applicable commercial terms.

Changes to equipment, drawings, quantities, sequence, site conditions, control philosophy, interfaces, shutdown windows or commissioning procedures after IP has commenced work may affect cost and schedule.

Instructions or requests given verbally by Customer personnel or plant operators that materially change IP’s agreed scope shall not by themselves constitute an agreed change to IP’s contractual or commercial obligations. Such changes shall be confirmed through the applicable written or traceable electronic change-control mechanism.

This requirement shall not prevent IP personnel from responding to an immediate safety or emergency situation where action is reasonably necessary to protect persons or equipment. Any resulting change in scope or cost shall be documented and regularised subsequently.

IP shall not be required to absorb the resulting additional work unless expressly agreed. Material changes shall be handled through the applicable change-control process.

Emergency actions required to protect personnel or equipment may be undertaken to the minimum extent reasonably necessary where IP is authorised to act, with the resulting scope and commercial impact documented subsequently.

The Services shall be ready for acceptance when IP has completed the agreed installation, testing or commissioning activities and the applicable acceptance criteria have been met, subject to permitted punch-list items.

Where acceptance cannot occur because Customer or third-party prerequisites are unavailable, the affected Services may nevertheless be treated as ready for acceptance to the extent permitted by the applicable contract.

Where the Customer puts the relevant equipment or system into normal commercial operation after IP has notified readiness for acceptance, such operational use may constitute acceptance of the relevant Services to the extent permitted by the applicable contract and law.

Where trial operation, hot testing or parameter tuning is expressly included in the Services, the applicable SOW shall specify the permitted trial period and, where appropriate, production volume or operating limits. Unless the applicable project contract specifies otherwise, trial operation shall not ordinarily continue beyond seventy-two (72) continuous hours after the relevant system is ready for trial operation. Continued commercial production or normal operational use beyond the agreed trial limit, after IP has notified readiness for acceptance, may constitute Deemed Acceptance of the relevant Services to the extent permitted by the applicable contract.

Any rejection shall identify specific, reproducible non-conformities against the agreed acceptance criteria.

Where acceptance cannot occur because Customer or third-party prerequisites are unavailable, the affected Services may nevertheless be treated as ready for acceptance to the extent permitted by the applicable contract.

Where the Customer puts the relevant equipment or system into normal commercial operation after IP has notified readiness for acceptance, such operational use may constitute acceptance of the relevant Services to the extent permitted by the applicable contract and law.

Any rejection shall identify specific, reproducible non-conformities against the agreed acceptance criteria.

Minor outstanding items that do not materially prevent the agreed operation of the relevant equipment or system shall not prevent acceptance where the applicable contract permits acceptance with deficiency list (punch-list) items.

The parties shall record outstanding items, responsibility and target completion where appropriate.

IP shall not be responsible for punch-list items allocated to Customer or third parties. Completion of IP’s deficiency-list items shall not make IP responsible for unrelated deficiencies in the plant or system.

The handover deliverables shall be limited to the drawings, test reports, checklists, configuration records, manuals, backups, training records, certificates and other documents expressly included in IP’s scope.

Where IP is assisting with handover from an EPC contractor or OEM, IP’s review, witnessing or recording of documents or tests shall not constitute certification that the EPC contractor’s or OEM’s design, manufacture or complete plant is defect-free unless IP has expressly accepted such certification responsibility.

Where handover records contain personal data such as names, contact details, user identifiers, access records or training records, each party shall comply with the data-protection obligations applicable to its role in relation to that data. The Customer shall ensure that personal data supplied to IP is lawfully disclosed and that any required notice, consent or other lawful basis is in place where applicable. Nothing in these Terms assumes that consent is the only lawful basis for processing or that IP is automatically a Data Processor in every engagement.

Customer and third-party documents shall remain subject to the responsibility and authenticity of their originators.

Where training or operator familiarisation is included, the scope shall identify the number of sessions, personnel, duration and subject matter.

Training shall not transfer to IP responsibility for the Customer’s competence management, operating procedures, statutory qualifications or safe operation of the plant.

Additional training requested after the agreed scope shall be chargeable unless otherwise agreed.

Where IP is engaged to support the Customer in taking over a plant or automation system from an EPC contractor, OEM or other third party, IP’s role may include witnessing tests, reviewing documentation, identifying gaps, preparing punch lists, advising the Customer and coordinating closure.

Unless expressly agreed otherwise, IP shall not assume the EPC contractor’s, OEM’s or designer’s obligations or certify the design, construction quality, statutory compliance, process performance or complete plant condition.

IP’s observations and recommendations shall be based on the information and access available to IP and shall not constitute a guarantee that all defects or deficiencies have been identified.

Completion of IP’s commissioning scope shall not by itself constitute a warranty or guarantee of future plant operation, production output, product quality, process stability, energy consumption, equipment life or continuous availability.

Where performance testing or guaranteed performance is required, the applicable project documents shall expressly identify the performance parameters, test conditions, exclusions, dependencies and remedies.

Performance of Customer- or third-party-supplied equipment shall remain the responsibility of the relevant supplier except to the extent IP has expressly undertaken an integration or other responsibility relating to that equipment.

Where a warranty is provided for IP’s Services, it shall apply to defects in the installation, workmanship or commissioning Services attributable to IP and within the agreed warranty period.

Unless the applicable project documents specify otherwise, the warranty period for IP’s installation and commissioning Services shall commence on the earliest of: (a) formal acceptance of the relevant Services; (b) Deemed Acceptance under the applicable contract; or (c) thirty (30) days after IP issues a valid Notice of Readiness for Acceptance or Commissioning, provided the relevant delay is not attributable to IP.

The warranty shall not apply to defects or failures caused by Customer or third-party work, equipment, design, operation, modification, misuse, inadequate maintenance, utilities, process conditions, environmental conditions or other matters outside IP’s agreed responsibility.

Where a covered defect is established, IP’s primary remedy shall be correction or re-performance of the affected Service.

The warranty shall not apply to defects or failures caused by Customer or third-party work, equipment, design, operation, modification, misuse, inadequate maintenance, utilities, process conditions, environmental conditions or other matters outside IP’s agreed responsibility.

Where a covered defect is established, IP’s primary remedy shall be correction or re-performance of the affected Service.

Unless expressly included, IP’s responsibility ends when the agreed Services are completed and accepted or otherwise brought to the agreed completion stage.

Troubleshooting, optimisation, additional commissioning, repeated trials, production support, modifications, breakdown assistance or further site visits after completion shall be chargeable unless covered by warranty, AMC or another applicable agreement.

IP may demobilise when its agreed scope is complete even if unrelated Customer or third-party work remains outstanding.

These Installation, Commissioning & Handover Terms shall be read together with IP’s Common General Customer Terms and, where applicable, the Programming, Automation/System Integration, IT/OT, Preventive Maintenance, Supply or Retrofit Specific Terms.

Where programming, integration or IT/OT work forms part of the assignment, the corresponding Specific Terms shall apply to those activities.

Where an accepted tender, SOW, Work Order or project contract contains different requirements, the accepted project contract shall govern to the extent of the inconsistency.

Any performance guarantee, liquidated damages, service level, delay liability, indemnity, acceptance test, statutory responsibility or other special condition shall apply only to the extent expressly accepted in the applicable project documents.

IP’s liability shall otherwise be governed by the Common General Terms and applicable project contract.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law. Any agreed limitation or exclusion shall be read subject to mandatory statutory requirements and the express terms of the applicable project contract.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

The governing law, dispute resolution, arbitration and jurisdiction provisions shall be those contained in the Common General Terms or applicable written agreement.

Nothing in these Specific Terms shall prevent an accepted tender or project contract from prescribing a different governing law, dispute-resolution mechanism or jurisdiction for the particular engagement.

T&C-9 Services & Maintenance Version 4, Rev 03 - Internal Review Draft

Automation O&M Support, Technical Advisory & Plant Stabilisation

These Specific Terms apply where Industry Pro Solutions LLP (“IP”) is engaged to provide automation and instrumentation operations support, technical advisory services, maintenance coordination, remote technical support, periodic site support, plant stabilisation assistance or related services (“Support Services”).

Support Services may be provided as a standalone engagement or together with preventive maintenance, programming, IT/OT, system integration, installation/commissioning, repair or other services.

The exact Services shall be limited to the activities expressly identified in the applicable quotation, Statement of Work (“SOW”), Work Order, Service Schedule, accepted tender or project contract.

Support Services are intended to provide technical assistance, structured review, diagnosis, recommendations, coordination and agreed operational support to the Customer.

Unless expressly stated otherwise, IP does not assume responsibility for operating the Customer’s plant, making production decisions, controlling the Customer’s workforce, approving process parameters, or guaranteeing plant availability or production output.

The Customer remains the owner/operator of the plant and retains operational decision-making responsibility except for responsibilities expressly assigned to IP in writing.

Depending on the agreed scope, Support Services may include remote technical consultation, structured review meetings, automation troubleshooting consultation, maintenance follow-up, escalation and issue review, technical recommendations, coordination with plant teams, automation system assessment, SCADA/DCS support, documentation review, SOP implementation follow-up, maintenance planning assistance, periodic site visits, OEM/EPC coordination, operational stabilisation assistance, recipe-management support and other specifically agreed activities.

The presence of an activity in this list does not mean that it is included in every engagement. The applicable SOW or Work Order shall govern.

Where IP is appointed to support an existing plant or automation environment, IP shall base its recommendations on the information, access, documentation and technical condition reasonably available at the time.

Existing defects, undocumented modifications, obsolete equipment, unsupported software, missing backups, incomplete drawings, inadequate maintenance history, incorrect configuration or other pre-existing conditions may affect the scope and effectiveness of the Services.

Identification of an issue does not mean that IP has accepted responsibility for correcting it unless correction is expressly included.

Where IP is engaged during or after handover of a plant from an EPC contractor, OEM or other party, IP may support document review, punch-list preparation, automation assessment, SOP development/follow-up, issue escalation, coordination and operational stabilisation.

Unless expressly agreed, such support does not transfer to IP the EPC contractor’s, OEM’s designer’s or other supplier’s responsibility for design, construction, statutory compliance, process performance or defects.

IP’s assessment shall be based on the information and access available and shall not constitute certification that all defects or deficiencies have been identified.

IP may issue observations, recommendations, priorities, action lists, maintenance suggestions or technical opinions.

Where IP considers a condition to present a material safety, process, equipment, cybersecurity or operational risk, IP may identify it expressly as a “High-Risk Technical Note”, “Safety Observation” or equivalent written risk notification, describing the observed condition, the reasonably foreseeable risk and the recommended action to the extent practicable.

The Customer shall decide whether, when and how to implement such recommendations, unless IP has expressly been contracted to implement them. The Customer shall acknowledge receipt of a material High-Risk Technical Note or Safety Observation where reasonably requested by IP.

Where the Customer elects not to implement, delays implementation of, or continues operation despite, a documented material recommendation, the resulting operational or technical risk shall remain with the Customer to the extent attributable to that decision. IP shall not be responsible for a resulting loss merely because IP previously advised the Customer of the condition, except to the extent directly attributable to IP’s separate breach, negligence or other liability under the applicable contract or law.

Where remote support is included, the applicable Service Schedule shall specify the systems covered, support hours, communication channels, access arrangements, response targets and exclusions.

Remote support may include diagnosis, configuration review, troubleshooting guidance, monitoring, documentation review, coordination with site personnel and other agreed activities.

Remote support does not by itself constitute continuous monitoring, emergency response, plant operation or guaranteed restoration unless expressly included.

Where periodic site support is included, the frequency, duration, personnel and activities shall be specified in the applicable scope.

Site visits may include system assessment, maintenance review, troubleshooting, meetings, SOP follow-up, technical coordination, training or other agreed activities.

A periodic site visit shall not be interpreted as continuous presence, resident engineering or full maintenance responsibility unless expressly agreed.

Where remote access is required, the access method, permitted systems, users, duration, approval mechanism and security controls shall be agreed.

Unless expressly included otherwise, remote support shall be provided through Customer-controlled and Customer-authorised access mechanisms such as a Customer-managed Virtual Private Network (VPN), jump host, remote-access gateway or firewall, with access limited to the systems and functions required for the agreed Services. A project-specific remote-access arrangement may be used where expressly agreed and documented.

The Customer shall provide or approve the required remote-access mechanism and shall remain responsible for Customer-controlled credentials, networks, firewalls, physical security and user administration except to the extent expressly included in IP’s scope.

IP shall follow the agreed access controls and shall not knowingly introduce malware, disable security controls or bypass agreed access restrictions. IP shall not be responsible for malware, unauthorised access, network intrusion, data loss or other cyber events occurring through Customer-managed infrastructure or originating in Customer- or third-party-controlled systems, except to the extent directly attributable to IP’s breach of agreed access controls, wilful misconduct or other liability under the applicable contract or law.

Where IP personnel make configuration or control changes remotely, such changes shall be made only within the agreed scope and after the required Customer authorisation, except for an urgent action expressly authorised under the emergency-support procedure. Where practicable, the material change and resulting system status shall be recorded.

The IT/OT Specific Terms shall apply to cybersecurity, remote access, data protection and related matters where those activities form part of the Support Services.

Where monitoring is included, the applicable scope shall specify the assets or systems monitored, monitoring hours, parameters, alert thresholds, review frequency, escalation route and response commitments.

Receipt of an alarm, alert or abnormal condition shall not by itself create an obligation to restore the plant, dispatch personnel, replace equipment or guarantee uninterrupted operation unless expressly agreed.

Where an escalation depends on Customer personnel, OEMs, utilities, site access or other third parties, IP’s response and resolution may depend on their availability.

IP may assist with maintenance planning, maintenance schedules, backlog review, prioritisation, follow-up and coordination where included.

Unless expressly agreed, IP does not assume responsibility for execution of all maintenance activities, availability of maintenance personnel, spare parts, statutory inspections, permits, isolation, or completion of maintenance actions.

Recommendations regarding maintenance intervals or priorities are based on the information and operating conditions known to IP and may require adjustment as conditions change.

These Support Services do not automatically constitute preventive maintenance, corrective maintenance or comprehensive Annual Maintenance Contract (“AMC”) services.

IP’s standard AMC offering is non-comprehensive preventive maintenance. Where a Customer or tender requires comprehensive AMC or another maintenance scope, the applicable AMC or project document shall expressly define the additional responsibilities, inclusions, exclusions, response commitments, parts and labour obligations.

Support Services shall not be interpreted as comprehensive maintenance merely because IP assists with maintenance planning, troubleshooting or coordination.

Where SCADA, Distributed Control System (DCS) or automation operations support is included, IP may provide monitoring, troubleshooting consultation, configuration support, alarm/event review, backup coordination, vendor coordination, performance observations and other agreed activities.

Unless expressly included, IP shall not operate the plant, approve process changes, override safety systems, make production decisions or guarantee production output or process performance.

Changes to control logic, interlocks, recipes, set points or other operational parameters shall require appropriate Customer authorisation and shall be undertaken only where included in IP’s scope.

Where recipe management is included, the applicable scope shall identify the systems, activities, approval process and access rights.

IP may provide technical assistance for recipe creation, modification, version management, transfer or related configuration.

IP shall not download, modify or execute a new or materially altered recipe, batch parameter, process setpoint or safety-related setpoint into an online controller without written or traceable electronic authorisation from the Customer’s designated Process Owner or other authorised Customer representative identified for the engagement. Where the agreed procedure permits real-time approval, the approval shall be captured in the Customer’s designated system, log or other auditable record.

Where IP is required to perform a technically necessary transfer or activation after approval, IP’s responsibility shall be limited to executing the authorised technical action; responsibility for the underlying formula, production parameter, product specification and release decision remains with the Customer unless expressly assigned otherwise.

The Customer remains responsible for the correctness and approval of process formulas, production parameters, product specifications and release of recipes for production unless expressly assigned otherwise. Customer authorisation does not transfer to IP responsibility for the underlying process decision.

Where documentation or Standard Operating Procedure (SOP) development or follow-up is included, the deliverables and level of detail shall be specified in the applicable scope.

IP may prepare, review or assist with SOPs and operational records based on information available and agreed plant practices.

Customer management remains responsible for approving, implementing, communicating and enforcing Customer operating procedures unless those responsibilities are expressly included in IP’s scope.

Operational stabilisation support may include identification of recurring issues, prioritisation, troubleshooting, coordination, recommendations, review meetings and follow-up.

Unless expressly agreed as a performance contract, stabilisation support does not guarantee a specific Overall Equipment Effectiveness (OEE), production rate, yield, energy consumption, quality level, uptime, Mean Time Between Failures (MTBF), Mean Time To Repair (MTTR) or other plant performance metric.

Where performance targets are required, the applicable contract shall identify the baseline, measurement method, operating conditions, Customer dependencies, exclusions and agreed remedy.

IP may coordinate with OEMs, EPC contractors, equipment suppliers, Customer personnel or other service providers where such coordination is included.

Coordination does not make IP responsible for the performance, warranty, response time, software, equipment, documentation or decisions of the third party.

Where IP depends on third-party support to resolve an issue, the resolution time may depend on the third party’s availability and contractual obligations.

Unless expressly included, Support Services do not include supply of spare parts, equipment repair, replacement, workshop repair, major corrective maintenance, system redesign, major programming changes or capital modification.

Where IP identifies a need for repair, replacement or additional engineering, IP may provide a separate quotation or change proposal.

No recommendation to replace an item shall constitute a guarantee that the replacement will eliminate all underlying plant or process problems unless expressly agreed.

The Customer shall provide reasonable access, competent personnel, information, drawings, backups, historical records, permits, utilities, remote access and other cooperation required for the agreed Services.

Failure or delay in providing required cooperation may affect the effectiveness, timing and cost of the Services.

IP shall not be responsible for delays or outcomes materially affected by unavailable Customer resources, unsafe conditions, concealed defects, third-party failures or other matters outside IP’s agreed responsibility.

Any response time, service level, uptime commitment, monitoring window, escalation period or restoration commitment shall apply only where expressly stated in the applicable SOW or Service Schedule.

A response time is not a restoration-time or resolution-time guarantee unless expressly stated.

Response and resolution may depend on remote access, site access, Customer personnel, OEM support, spare parts, communications, utilities, safe working conditions and other prerequisites. Where such prerequisites are unavailable or delayed, the applicable response or resolution commitment shall be adjusted to the extent affected by the unavailable prerequisite.

Unless expressly agreed otherwise, response-time measurement shall begin only after IP receives the required information and access necessary to commence the relevant support activity. An automated alert or message received outside the agreed support window shall not by itself create an immediate response obligation.

Where Support Services involve Customer data, system logs, configuration files, screenshots, alarm/event records, backups or other technical information, IP shall use such information only for performing the agreed Services, troubleshooting, reporting, quality control, contractual administration or other purposes permitted by the applicable agreement and law.

Where remote sessions are logged or recorded by IP or the Customer, the parties shall follow the agreed access, retention and confidentiality arrangements. IP shall not be responsible for retention, backup or recovery of Customer records unless expressly included in the scope.

Where personal data is incidentally accessed during technical support, the parties shall comply with the applicable contractual and legal requirements relating to such data. The Digital Personal Data Protection Act, 2023 and notified Rules may apply according to their scope and commencement provisions; responsibility for specific compliance obligations shall be allocated in the applicable contract where necessary.

Where structured review meetings are included, IP may maintain issue lists, action trackers, observations, recommendations and status reports as specified in the applicable scope.

Reports and action trackers shall reflect information available to IP at the time and shall not constitute certification of the complete condition of the plant unless expressly stated.

The Customer remains responsible for closing actions allocated to Customer or third parties.

Where urgent assistance is requested outside the agreed support arrangement, IP may provide reasonable assistance subject to availability and applicable commercial terms.

Emergency assistance shall not automatically expand the agreed scope, warranty, response commitment or liability of IP.

Where material additional work is required, the scope and commercial basis shall be confirmed through the agreed change-control mechanism as soon as practicable.

IP shall not intentionally bypass safety functions, protection systems, emergency shutdowns or operational safeguards unless expressly authorised and included in the agreed scope and performed in accordance with applicable procedures and law.

The Customer retains responsibility for plant safety, operational decisions, permits, isolation, statutory compliance and safe execution unless expressly assigned to IP.

IP may refuse or defer a requested intervention where IP reasonably considers it unsafe, inadequately authorised or outside its agreed scope or competence.

Where IP identifies an immediate and reasonably foreseeable risk of injury, equipment damage or unsafe operation, IP may recommend suspension or isolation of the affected activity or system. Such recommendation does not itself transfer plant operating authority to IP.

Where a warranty is provided for Support Services, it shall apply to the agreed Services and deliverables and not to the future operating condition of the Customer’s plant.

The warranty shall not apply to changes by the Customer or third parties, pre-existing conditions, equipment failures, process conditions, utilities, cyber incidents, lack of maintenance, Customer decisions, third-party performance or other causes outside IP’s agreed responsibility.

Where a covered service defect is established, IP’s primary remedy shall be correction or re-performance of the affected Service.

No warranty shall be implied merely because IP has identified a problem, made a recommendation, attended site, participated in troubleshooting or coordinated with a third party.

Unless expressly agreed otherwise, the Support Services shall end on the expiry or completion date stated in the applicable agreement.

Troubleshooting, optimisation, additional site visits, programming, repair, corrective maintenance, major engineering, cybersecurity remediation or other work requested after completion shall be chargeable unless covered by another applicable agreement.

Completion of Support Services does not constitute a certification that all outstanding plant issues have been eliminated.

These Automation O&M Support, Technical Advisory & Plant Stabilisation Terms shall be read together with IP’s Common General Customer Terms and, where applicable, the Preventive Maintenance/AMC, IT/OT, Programming, Automation/System Integration, Installation/Commissioning, Repair, Supply or Retrofit Specific Terms.

Where an activity falls within a more specific IP T&C, that T&C shall govern the activity-specific matters.

Where an accepted tender, SOW, Work Order or project contract contains different requirements, the accepted project contract shall govern to the extent of the inconsistency.

Any performance guarantee, service credit, liquidated damages, response commitment, uptime commitment, indemnity, statutory responsibility, maintenance obligation or other special condition shall apply only to the extent expressly included in the applicable project documents and accepted by IP or otherwise binding under the applicable contract.

Where a tender, Purchase Order, SOW or project contract imposes obligations different from these Specific Terms, the accepted project contract shall govern according to its applicable order of precedence. These Specific Terms shall not be construed to negate an obligation that has become binding on IP under the project contract.

IP’s liability shall otherwise be governed by the Common General Terms and applicable project contract.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

The governing law, dispute resolution, arbitration and jurisdiction provisions shall be those contained in the Common General Terms or applicable written agreement.

Nothing in these Specific Terms shall prevent an accepted tender or project contract from prescribing a different governing law, dispute-resolution mechanism or jurisdiction for the particular engagement.

T&C-10 Product Supply Version 4, Rev 02 - Internal Review Draft Not for website publication or execution until reviewed and approved by IP.

Supply / Sale of New Products

PURPOSE & APPLICATION

Purpose: These Terms establish the contractual framework for IP's supply and sale of new industrial Products. They are intentionally separate from the substantially different risk profile of used, refurbished and legacy Products.

These Specific Terms apply where Industry Pro Solutions LLP (“IP”) supplies, sells, trades, resells, sources or arranges supply of new industrial automation, electrical, instrumentation, control, IT/OT, software, spare parts, components, assemblies or related Products.

“New Product” means a Product represented by IP as new and unused, subject to the description, manufacturer/channel status and warranty expressly stated in the applicable quotation, order confirmation or contract.

The exact Product, make, model, part number, revision, quantity, source, warranty and delivery basis shall be governed by the applicable commercial document.

Product identification shall be based on the make, model, part number, revision, specifications and description stated in the quotation or order confirmation.

Where a Product has multiple hardware, firmware or software revisions, IP shall supply the specified revision where expressly agreed and available. A visually similar or related Product shall not be treated as equivalent merely because it belongs to the same series.

Products may be sourced from the original manufacturer, authorised distributor, authorised reseller or another lawful commercial source, depending on the agreed arrangement.

Where the Customer requires supply exclusively through an authorised manufacturer channel, that requirement shall be expressly stated in the order. IP shall not be responsible for channel restrictions arising from a Customer-selected or Customer-specified source unless IP expressly accepts such responsibility.

Where a Product carries a manufacturer's or upstream supplier's warranty, that warranty shall apply subject to the manufacturer's terms.

IP shall pass on the benefit of an available manufacturer warranty to the extent available to IP, but shall not be deemed to provide a broader manufacturer warranty, service level or remedy than IP has expressly accepted.

Third-party software licences, End User Licence Agreements (EULAs), firmware licences and other applicable third-party terms may govern use of the Product.

Software and firmware supplied with a Product may be subject to separate licensing, subscription, activation, update and support conditions.

Unless expressly agreed, sale of hardware does not transfer ownership of embedded or separate software intellectual property.

The Customer shall obtain and maintain licences, subscriptions and activations allocated to the Customer under the applicable commercial arrangement.

IP may provide technical assistance in identifying a Product based on information supplied by the Customer.

Unless IP expressly undertakes application engineering, system design or compatibility verification, the Customer remains responsible for confirming that the Product is suitable for its application, environment, process, electrical system, network, control architecture and regulatory requirements.

Where IP expressly undertakes engineering or compatibility responsibility, the agreed technical basis, drawings, specifications and assumptions shall govern.

Where the Customer specifies a make, model, part number, source or technical specification, IP may rely on that specification.

IP shall not be responsible for incompatibility, application unsuitability or performance resulting from the Customer's specification except to the extent directly caused by IP's failure to supply the agreed Product or by IP's separate breach of contract.

IP shall, where the Product carries a serial number, batch number or other unique manufacturer identifier, record the available identifier on the dispatch document, invoice, delivery record or other traceable IP record.

Where a Product has no unique identifier, IP shall record such other identification as is reasonably available and appropriate to the transaction.

A warranty claim may be rejected, subject to the applicable warranty and law, where the Product identifier is missing, defaced, altered or does not correspond with IP's supply records and the discrepancy prevents reasonable verification of the Product supplied.

Delivery dates are based on availability information reasonably available to IP at quotation or order acceptance.

Manufacturer lead times, allocation, production changes, discontinuation, logistics disruption, customs, export restrictions, third-party supply failure and other matters outside IP's reasonable control may affect delivery.

A quoted lead time shall not constitute a guaranteed delivery date unless expressly accepted as such in writing.

The Customer shall inspect delivered Products for quantity, identity, visible damage and other apparent non-conformity and shall notify IP in writing within seven (7) calendar days of receipt.

If the Customer does not notify IP within that period, the Customer shall be deemed to have accepted the Products as to quantity, identity and defects that were reasonably discoverable on such inspection, subject always to latent defects covered by an applicable warranty and rights that cannot lawfully be excluded.

This inspection period does not convert a concealed or latent defect into a visible defect and does not by itself extinguish a valid warranty claim.

Freight, insurance, title transfer and risk transfer shall be as stated in the quotation, order confirmation or agreed Incoterm where applicable.

Where no different term is agreed, risk and title shall pass in accordance with the applicable contract and law, subject to any lawful retention-of-title arrangement expressly stated.

IP shall pack Products in accordance with agreed shipping requirements or normal commercial practice appropriate to the Product.

After delivery, the Customer shall be responsible for storage, environmental conditions, electrostatic protection, moisture control, shelf-life management and preservation unless expressly included in IP's scope.

No substitution of a materially different Product shall be made without Customer approval where the substitution changes agreed specification, compatibility, form, fit, function or warranty.

Where a manufacturer changes a Product revision or supplies a successor Product, IP shall notify the Customer before dispatch where the change is material and reasonably known to IP, unless the applicable tender, purchase order or project contract expressly permits such substitution or revision without prior approval.

The applicable warranty shall be the warranty expressly stated in the quotation, order, manufacturer's warranty or separate warranty document.

A Product warranty applies to the Product and does not automatically warrant the Customer's larger system, process, production output, uptime or future plant performance.

Warranty shall not apply, to the extent permitted by law, to failure caused by improper installation, commissioning, operation, storage, maintenance, modification, repair, alteration, accident, abnormal electrical conditions, environmental conditions, process conditions, misuse, negligence, incompatible equipment, third-party intervention, software changes or use outside the Product's stated specifications.

Where a valid warranty claim is established, IP may, subject to the applicable warranty, repair, replace, reperform the affected service where relevant, or provide an appropriate credit/refund as agreed or required by contract or law.

Where the warranty is a manufacturer's or upstream supplier's warranty, the manufacturer's investigation, approval, repair, replacement, credit and turnaround remain subject to that manufacturer's control and terms.

Returns shall be permitted only in accordance with the applicable quotation, order or return policy.

Custom-ordered, configured, programmed, non-stock, specially sourced or third-party Products may be non-returnable except for an established warranty or non-conformity claim.

Cancellation after IP has committed to purchase or specially source the Product may result in applicable supplier, restocking, cancellation, configuration, testing or other reasonable charges, as stated in the applicable commercial document.

Where Product supply is combined with installation, programming, commissioning, repair, integration or maintenance, the applicable Specific Terms for those Services shall also apply.

The sale of a Product does not by itself include installation, configuration, commissioning, programming, integration or maintenance.

Where supply is made under a Government, PSU or other tender, the tender conditions, IP's submitted bid/deviations, clarifications, Letter of Award / Letter of Acceptance, Purchase Order and other contract documents shall apply according to the order of precedence specified in the accepted contract.

IP's standard T&C shall not be relied upon to contradict an obligation that IP has expressly accepted in its bid or that has become binding under the final contract.

Where IP considers a tender condition commercially or technically unacceptable, IP should seek clarification or record an explicit deviation before bid submission or contract acceptance. Once an obligation has become part of the binding contract, these Specific Terms shall not be construed as overriding it.

Prices shall be subject to applicable taxes, duties, freight, customs, insurance and other charges as stated in the quotation.

Where import, export, certification, hazardous-goods, electrical, radio, telecom, environmental or other regulatory requirements apply, responsibility shall be allocated in the applicable order. IP shall not be responsible for Customer-specific approvals or permits unless expressly included.

IP's liability in relation to a Product shall be governed by the Common General Terms and the applicable project contract.

A Product-only sale shall not automatically make IP responsible for the performance of a larger system or process into which the Product is incorporated.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

Where the Customer fails to make payment or otherwise defaults under the applicable contract, IP may exercise the rights available to an unpaid seller under applicable law, including withholding delivery, exercising lien or stoppage rights where available, and resale where legally permitted.

Where the contract expressly provides additional rights relating to uncollected, custom-sourced, configured or specially procured Products, IP may exercise those rights subject to applicable law and any required notice.

The Customer shall remain responsible for reasonable storage, handling, cancellation and other costs attributable to its default to the extent permitted by the contract and law.

These Supply / Sale of New Products Terms shall be read together with IP's Common General Customer Terms and, where applicable, the Repair, Preventive Maintenance/AMC, Programming, IT/OT, Automation/System Integration, Installation/Commissioning and Automation O&M Specific Terms.

Where an accepted tender, SOW, Work Order or project contract contains different requirements, the accepted project contract shall govern to the extent of the inconsistency.

T&C-11 Product Supply Version 4, Rev 03 - Internal Review Draft

Supply / Sale of Used, Refurbished, Reconditioned & Legacy Products

PURPOSE & APPLICATION

Purpose: These Terms establish the contractual framework for secondary-market and legacy industrial Products. They deliberately place greater emphasis on condition, disclosure, testing, uncertainty, warranty and application suitability.

These Specific Terms apply where IP supplies, sells, trades, resells, sources, repairs for resale, refurbishes or arranges supply of used, refurbished, reconditioned, remanufactured, open-box, surplus, legacy, obsolete or discontinued industrial Products.

These Products may include PLCs, HMIs, drives, servo systems, industrial computers, control equipment, instrumentation, electrical equipment, modules, cards, panels, components and other industrial Products.

The exact Product condition, identification, testing, refurbishment, warranty and known limitations shall be governed by the applicable quotation, order confirmation or contract.

The condition description of a used, refurbished, reconditioned, remanufactured, open-box, surplus or legacy Product forms an essential part of the commercial description.

The Customer shall evaluate the Product against the condition expressly stated and shall not assume that a Product is equivalent to a current new Product merely because it performs the same basic function.

A used Product may have previously been installed, operated, handled, repaired, stored or removed from service.

The prior operating history, operating hours, environment, service history or reason for removal may not be fully known to IP unless expressly stated.

Visible wear, cosmetic marks, labels, connectors, fasteners, packaging or accessories may differ from a new Product.

Open-box, surplus or unused old stock may not have been previously operated but may have been stored for an extended period or handled outside the manufacturer's current supply chain.

Packaging, documentation, firmware revision, date code, shelf life, battery condition, seals or accessories may differ from current production Products.

Unused old stock or surplus Products may contain age-degraded internal components, including electrolytic capacitors, back-up batteries, seals and other components whose condition can deteriorate with time even without operation. Such age-related deterioration shall not by itself constitute a manufacturing defect or a representation that the Product should perform for the service life of a new Product, subject to any express warranty and applicable law.

“Unused” shall not by itself mean “current production”, “latest revision” or “covered by current manufacturer support”.

A refurbished or reconditioned Product may have been inspected, cleaned, repaired, tested, calibrated, reassembled or had selected components replaced by IP, the manufacturer or another service provider.

The extent of refurbishment shall be limited to what is expressly represented in the quotation or accompanying report.

Refurbishment does not necessarily restore the Product to the manufacturer's current production specification or give it the expected service life of a new Product.

Where a Product is represented as remanufactured, the meaning and scope of remanufacture shall be based on the representation of the party performing the remanufacture.

IP shall not represent a Product as manufacturer-remanufactured unless that status is supported by the applicable source or documentation.

Legacy, obsolete or discontinued Products may no longer be manufactured, supported, patched or fully documented by the original manufacturer.

Availability of spare parts, firmware, software, licences, technical support, replacement Products and manufacturer warranty may be limited or unavailable.

IP may recommend a successor, equivalent, retrofit or migration option, but compatibility and suitability shall be subject to the agreed technical scope and Customer approval.

Product identification shall be based on the make, model, part number, revision, serial number and other identifiers stated in the quotation or order confirmation.

For legacy Products, hardware revision, firmware revision, date code and communication protocol may materially affect compatibility. IP shall not be responsible for an incompatibility arising from information not supplied to IP or from a Customer-specified revision.

Where IP tests a used, refurbished or legacy Product, the quotation, test report or service record shall identify the tests reasonably performed and, where relevant, the operating conditions under which they were performed.

Testing is evidence of the Product's condition at the time of testing and does not constitute a guarantee of future service life, continuous availability or performance under every Customer application.

Where a Product is supplied without a specified test, IP shall not be deemed to have performed a full functional or endurance test.

Unless expressly stated, IP's testing does not include destructive testing, long-duration endurance testing, every operating mode, every I/O combination, every environmental condition, complete system integration, Customer process simulation or manufacturer-level qualification.

Where the Customer requires a particular test, acceptance criterion or certification, it shall be expressly included in the order.

IP may disclose known limitations, missing accessories, cosmetic condition, obsolete status, unavailable manufacturer support, firmware limitations, battery condition, repair history or other material information known to IP.

A condition or limitation expressly disclosed before sale shall not constitute a defect merely because the Customer later experiences that disclosed condition, subject to applicable law and any express warranty.

Where reasonably available, IP may record source, serial number, date code, prior owner information, repair history or other traceability information.

IP shall take reasonable steps appropriate to the transaction to avoid knowingly supplying counterfeit Products. However, for secondary-market Products, original-manufacturer authentication, warranty registration or manufacturer acceptance may not be available unless expressly included.

Unless IP expressly undertakes application engineering, the Customer remains responsible for determining whether a used, refurbished or legacy Product is suitable for its process, environment, electrical system, network, control architecture, safety requirements and regulatory needs.

Where IP has expressly undertaken compatibility or application engineering, the agreed technical basis, drawings, specifications and assumptions shall govern.

Where the Customer specifies a particular used, refurbished, legacy or discontinued Product, revision or source, IP may rely on that specification.

IP shall not be responsible for limitations inherent in the specified Product or for application incompatibility arising from the Customer's selection, except to the extent directly caused by IP's failure to supply the agreed Product or by IP's separate breach.

Legacy Products may depend on software, firmware, programming tools, activation keys, licences or operating systems that are no longer commercially available or supported.

IP makes no representation that an original equipment manufacturer (OEM) will permit software or licence transfers, parameter-tool downloads, feature-key activation, firmware access or other software functions for secondary-market hardware.

IP shall not be responsible for an OEM-enforced licence restriction, feature lock, activation refusal, unsupported firmware, discontinued programming tool or similar OEM-controlled limitation, except to the extent expressly undertaken by IP or directly caused by IP's breach of the applicable contract.

IP may provide available software or technical assistance only where expressly included and lawfully available. Sale of the hardware does not transfer ownership of software intellectual property or create a right to use software beyond the applicable licence.

The warranty for a used, refurbished, reconditioned, remanufactured, open-box or legacy Product shall be only the warranty expressly stated in the applicable quotation, order or warranty document.

To the maximum extent permitted by applicable law, including Section 62 of the Sale of Goods Act, 1930, any implied term, condition or warranty as to quality, fitness for a particular purpose or merchantable quality that may otherwise arise by implication of law is excluded or varied by these Specific Terms, except to the extent such exclusion or variation is not legally permitted.

The Customer acknowledges that the express condition description, disclosed limitations and stated warranty form the agreed basis of sale for secondary-market Products. The warranty period may be shorter than that applicable to a new Product.

Where no warranty is expressly stated, the Customer shall not assume a new-Product or manufacturer warranty merely from the fact that IP supplied the Product, subject always to rights that cannot lawfully be excluded.

Warranty shall not apply, to the extent permitted by law, to failure caused by installation, commissioning, operation, storage, maintenance, modification, repair, alteration, accident, abnormal electrical conditions, environmental conditions, process conditions, misuse, negligence, incompatible equipment, third-party intervention, software changes or use outside the Product's specifications.

The warranty shall also not cover a condition or limitation expressly disclosed as part of the Product's condition before sale.

Where a valid warranty claim is established, IP may, subject to the applicable warranty, repair the Product, replace it with an equivalent Product, provide a reasonable credit/refund or adopt another remedy expressly stated in the warranty.

Replacement may be a used, refurbished, reconditioned or equivalent Product where permitted by the applicable warranty.

Where a used, refurbished or legacy Product is said to carry a manufacturer's or upstream supplier's warranty, that warranty shall apply only to the extent actually available and transferable to IP or the Customer.

IP does not guarantee that an original manufacturer will accept a warranty claim, provide parts, support the Product or honour a warranty after a secondary-market transfer unless expressly confirmed.

Used, refurbished, reconditioned, legacy, discontinued, specially sourced or configured Products may be non-returnable except for an established warranty or non-conformity claim.

Cancellation after IP has committed to acquire, refurbish, configure or specially source such a Product may result in supplier, restocking, cancellation, refurbishment, testing, storage or other reasonable charges, as stated in the applicable commercial document.

The Customer shall inspect the Product promptly after delivery and, in any event, shall notify IP in writing within seven (7) calendar days of receipt of any shortage, identity mismatch, visible damage or other defect reasonably discoverable on inspection.

If the Customer does not notify IP within that period, the Customer shall be deemed to have accepted the Product as to quantity, identity and defects reasonably discoverable on such inspection, subject always to latent defects covered by an applicable warranty and rights that cannot lawfully be excluded.

For used/refurbished/legacy Products, inspection shall also consider the disclosed condition and any test report supplied with the Product.

After delivery, the Customer shall be responsible for suitable storage and preservation, including environmental conditions, moisture control, electrostatic protection, battery maintenance and other requirements appropriate to the Product.

IP shall not be responsible for deterioration after delivery caused by unsuitable storage or preservation except to the extent directly attributable to IP's separate contractual responsibility.

Supply of a legacy or discontinued Product does not create an obligation on IP to maintain future availability of the same Product, firmware, software, spare parts or repair capability.

IP may assist in identifying successor Products, retrofit, migration, repair or replacement options where commercially and technically feasible.

Unless expressly stated and supported by objective information, IP does not warrant the remaining service life, future reliability or expected operating hours of a used, refurbished or legacy Product.

A Product that successfully passes a specified test may nevertheless fail later due to age, component degradation, operating conditions or other factors inherent in its condition.

Where a used, refurbished or legacy Product is supplied together with repair, installation, programming, commissioning, integration or maintenance, the applicable Specific Terms for those Services shall also apply.

Testing or repair performed by IP does not automatically make IP responsible for the Customer's larger system or process.

Where supply is made under a Government, PSU or other tender, the tender conditions, IP's submitted bid/deviations, clarifications, Letter of Award / Letter of Acceptance, Purchase Order and other contract documents shall apply according to the order of precedence specified in the accepted contract.

If the tender requires a warranty, service life, certification, OEM authorisation or condition standard inconsistent with the Product's actual condition, IP should identify and clarify the inconsistency before bid submission or contract acceptance. Once the requirement has become part of the binding contract, these Specific Terms shall not be construed as overriding it.

IP shall not represent a secondary-market Product as meeting a tender-specific condition, OEM authorisation or certification unless IP has actually confirmed and accepted that requirement.

IP's liability shall be governed by the Common General Terms and the applicable project contract.

The Customer acknowledges that used, refurbished and legacy Products may carry greater uncertainty than new Products. That uncertainty does not transfer to IP beyond the express representations, warranty and Services actually undertaken.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

Where the Customer fails to make payment or otherwise defaults under the applicable contract, IP may exercise the rights available to an unpaid seller under applicable law, including withholding delivery, exercising lien or stoppage rights where available, and resale where legally permitted.

Where the contract expressly provides additional rights relating to uncollected, custom-sourced, refurbished or specially procured Products, IP may exercise those rights subject to applicable law and any required notice.

The Customer shall remain responsible for reasonable storage, handling, cancellation and other costs attributable to its default to the extent permitted by the contract and law.

These Used / Refurbished / Legacy Products Terms shall be read together with IP's Common General Customer Terms and, where applicable, the Repair, Preventive Maintenance/AMC, Programming, IT/OT, Automation/System Integration, Installation/Commissioning, Automation O&M and New Product Supply Terms.

Where an accepted tender, SOW, Work Order or project contract contains different requirements, the accepted project contract shall govern to the extent of the inconsistency.

T&C-12 Engineering & Systems Version 4, Rev 02 - Internal Review Draft

Retrofit, Modernisation, Migration & System Upgrade Services

PURPOSE & APPLICATION

Purpose: These Terms govern projects in which IP modifies, upgrades, replaces, migrates, extends or modernises an existing industrial automation, control, electrical, instrumentation or IT/OT system while retaining part of the existing installation or functionality.

These Specific Terms apply where Industry Pro Solutions LLP (“IP”) undertakes retrofit, modernisation, migration, upgrade, replacement, extension, life-extension or conversion work on an existing machine, panel, control system, automation system, electrical system, instrumentation system, SCADA/DCS, network or related industrial installation (“Retrofit Services”).

Retrofit Services may include hardware replacement, controller or I/O migration, drive/servo replacement, panel modification, rewiring, software migration, program conversion, interface adaptation, communication upgrades, SCADA/HMI migration, third-party system conversion, obsolescence mitigation, functional upgrades and related installation, testing and commissioning.

The exact scope shall be limited to the activities and deliverables expressly identified in the applicable quotation, Statement of Work (“SOW”), Work Order or project contract.

Retrofit Services are performed on an existing system whose age, condition, design history, modifications and operating environment may not be fully known to IP.

Unless expressly included, IP does not warrant that the existing system is in accordance with its original design, manufacturer documentation, statutory requirements or current industry practice.

IP may rely on drawings, programs, manuals, backups, asset lists, I/O lists, network information and other information supplied by the Customer or its representatives.

Where a site survey, installed-base assessment or technical audit is included, IP shall assess the aspects expressly covered by the agreed scope.

An assessment shall not constitute a guarantee that every hidden defect, undocumented modification, obsolete component, latent condition or compatibility issue has been identified.

Where material differences are found between the assessed condition and the actual condition encountered during execution, the additional work, cost and schedule impact shall be dealt with through change control.

The objective of a Retrofit Service may be to extend equipment life, address obsolescence, improve maintainability, replace unsupported components, add functionality, improve connectivity or security, or migrate to a current technology platform.

Unless expressly agreed, modernisation does not guarantee a specific increase in production, Overall Equipment Effectiveness (OEE), energy efficiency, process capacity, uptime or product quality.

Where measurable performance improvement is required, the baseline, measurement method, operating conditions, dependencies and acceptance criteria shall be expressly defined.

Where IP develops retrofit engineering, architecture, drawings, Bill of Materials (BOM), control philosophy, I/O mapping, migration strategy or other design deliverables, the applicable scope shall identify the required review and approval points.

Customer approval of the design basis shall establish the agreed technical baseline for execution. Changes after such approval may require additional time and cost.

Customer approval does not transfer to IP responsibility for process design, statutory duties or Customer-owned operating decisions unless expressly included.

Retrofit work commonly requires interaction between new and existing equipment, software, wiring, protocols, networks, instruments, drives, panels and mechanical systems.

IP shall be responsible for compatibility only to the extent expressly covered by its agreed engineering scope and based on the information and interfaces reasonably available.

Compatibility of third-party equipment, undocumented interfaces, unsupported protocols, obsolete software or equipment outside IP’s scope may require additional engineering or replacement.

Where existing PLC, HMI, SCADA, DCS, drive, motion, protection or other software is to be migrated or converted, IP shall rely on the source programs, databases, backups and configuration information available.

Incomplete, corrupted, password-protected, encrypted, proprietary or unsupported source material may prevent exact migration or require additional work.

IP does not guarantee that legacy code can be converted without modification or that every historical function, undocumented feature or workaround will be reproduced unless expressly included in the acceptance criteria.

Before modification, flashing, downloading or otherwise changing an existing control or automation system, the Customer shall provide or approve appropriate current backups of programs, parameters, recipes, configurations and other relevant data, unless backup is expressly included in IP’s scope.

The backup status shall be confirmed by the Customer’s authorised representative in writing or by traceable electronic communication before IP proceeds beyond the agreed backup hold point. Where the Customer declines to provide or approve a backup, IP may suspend the affected activity until the risk is expressly accepted by the Customer.

Where IP creates a backup, its scope, format and storage location shall be as agreed. IP shall not be responsible for information that was already missing, corrupted, incomplete, inaccessible or outdated before IP’s work.

Where restoration of an existing system is required, restoration shall be a separate agreed activity unless expressly included.

Where practical, migration may be performed in stages to reduce operational disruption.

The agreed migration sequence, shutdown windows, temporary arrangements, parallel operation, cutover method and rollback strategy shall be identified in the project plan where included.

The Customer shall provide the agreed shutdown, production, isolation and access windows. Changes or loss of such windows may affect schedule and cost.

Cutover, shutdown, isolation, energisation and return-to-service activities shall be performed only when the agreed prerequisites, permits, safety arrangements and responsibilities are in place.

The Customer shall remain responsible for plant operating authority, statutory permissions, isolation and safety controls allocated to the Customer.

IP shall not be liable for damage or failure of pre-existing field components, instruments, switchgear, wiring, power supplies or other retained equipment arising solely from normal shutdown, isolation, power cycling or re-energisation during an agreed cutover, except to the extent directly caused by IP’s negligent, wilful or otherwise contractually attributable act or omission.

Where a cutover is delayed or repeated because of Customer or third-party readiness, additional mobilisation, engineering, waiting and testing may be chargeable.

Where existing equipment is removed, the scope shall state whether the removed equipment is to be returned to the Customer, retained by IP for testing/repair, exchanged, disposed of or otherwise treated.

Unless expressly included, disposal, recycling, hazardous-material handling and statutory disposal documentation are outside IP’s scope.

Customer-owned equipment retained by IP shall be handled with reasonable care, subject to its condition and the agreed work.

Replacement Products may be new, refurbished, reconditioned, used or legacy Products where expressly agreed.

T&C-10 (Supply / Sale of New Products) or T&C-11 (Supply / Sale of Used, Refurbished & Legacy Products), as applicable, shall govern the condition, description, warranty and limitations of the supplied Product.

Where a used, refurbished, reconditioned or legacy Product is supplied, no OEM factory-new warranty shall be implied merely because the Product was originally manufactured by an OEM. Any manufacturer or upstream warranty shall apply only to the extent expressly stated and actually available or transferable.

The Retrofit Services warranty shall not enlarge the Product warranty or make IP responsible for a replacement Product beyond the responsibility expressly undertaken for that Product and the Retrofit Services.

Where software conversion, PLC/HMI/SCADA programming, recipe migration, database conversion or other software work forms part of the Retrofit Services, IP’s Programming Specific Terms shall apply to those activities.

Unless expressly agreed, IP shall not be required to reproduce undocumented legacy behaviour, obsolete workarounds or functions that cannot reasonably be verified from the available baseline.

New functionality requested during migration shall be treated as additional scope unless expressly included.

Retrofit projects may involve proprietary hardware, software, protocols, licences, tools or systems controlled by OEMs or third parties.

IP shall not be responsible for restrictions imposed by an OEM or third party, including unavailable programming tools, licence transfer restrictions, unsupported firmware, locked interfaces, discontinued protocols or refusal to provide technical information, except to the extent expressly undertaken by IP.

Where third-party participation is required, schedule and outcome may depend on that party’s availability and cooperation.

Where Retrofit Services modify industrial networks, remote access, SCADA/DCS, PLC networks or other IT/OT interfaces, the applicable IT/OT Specific Terms shall apply.

Unless expressly included, IP does not assume responsibility for the Customer’s overall cybersecurity architecture, enterprise network, firewall, identity management, security monitoring or third-party systems.

Any cybersecurity improvement shall be limited to the controls expressly included in the agreed scope.

Where retrofit work affects safety PLCs, Safety Instrumented Systems (SIS), emergency shutdowns, protection relays, interlocks or other safety-related functions, the applicable scope shall identify the engineering, testing and validation responsibilities.

IP shall not represent that a retrofit independently certifies the overall functional safety or statutory compliance of the plant unless such certification is expressly included and IP is appropriately qualified and authorised to provide it.

Customer and other responsible parties shall retain their statutory and operational safety responsibilities.

Testing shall be performed against the agreed scope, specifications and acceptance criteria.

Testing may include Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT), functional testing, I/O testing, loop checks, communication testing, migration verification, backup/restore testing or other agreed tests.

Testing of the retrofitted equipment or system does not automatically constitute testing of the complete plant, production process or third-party equipment unless expressly included.

Retrofit Services do not automatically correct defects outside the agreed scope.

A failure of an existing component, third-party system, field device, cable, instrument, mechanical assembly, utility or process after the retrofit shall not by itself establish a defect in IP’s Services.

Where a post-retrofit failure is alleged to be attributable to IP, IP shall be entitled to investigate the causal relationship before a warranty remedy is determined.

The Customer shall not withhold or set off undisputed amounts otherwise due to IP solely because an alleged post-retrofit failure is under investigation, except where withholding or set-off is expressly permitted or required by the applicable tender, purchase order or project contract or by applicable law.

Unless expressly guaranteed, Retrofit Services do not guarantee that the modernised system will operate without future failure or that the remaining life of existing retained equipment will be extended by a specified period.

Modernisation recommendations are based on the condition and information available and may reduce obsolescence or failure risk without eliminating it.

The Customer shall provide timely access, shutdowns, permits, drawings, programs, passwords or authorised access, competent personnel, utilities, test facilities and other agreed resources.

Failure to provide required resources may cause additional mobilisation, waiting, engineering, testing or schedule costs.

IP shall not be responsible for delays caused by Customer or third-party readiness or by operating conditions outside the agreed basis.

Changes to approved architecture, hardware, I/O, control logic, sequence, drawings, interfaces, quantities, migration method, shutdown window, acceptance criteria or other agreed baseline shall be handled through the applicable change-control process.

IP field personnel are not authorised to accept verbal variations to contractual scope, price, acceptance criteria or warranty. Site personnel may acknowledge a technical instruction only where they have been expressly authorised by IP to do so.

Work performed by IP in response to an unauthorised site instruction shall not, merely because it was performed, be treated as a contractual variation. Where IP elects to perform such work, it shall be subject to subsequent written confirmation of scope, commercial treatment and risk allocation.

Where Customer personnel direct IP to make an unauthorised modification to a control program, interlock, protection setting or other system outside the approved baseline, IP may refuse the instruction. If IP nevertheless performs the change after an authorised Customer instruction, the warranty for the affected portion may be excluded to the extent the change causes or contributes to the relevant defect or failure.

Emergency actions required for immediate safety or prevention of damage may be undertaken within previously authorised limits and shall be documented subsequently.

IP shall maintain, where applicable to the project, records of material site instructions, software changes, cutover events, test results and Customer approvals relevant to the agreed scope.

Customer requests for changes shall be routed through the Customer representative identified in the SOW or project communication matrix. IP may require written or traceable electronic confirmation before implementing a change that affects safety, control logic, scope, price, schedule, acceptance criteria or warranty.

A site diary, email, electronic approval or other traceable project record may be used as evidence of an instruction or approval where the applicable contract permits such records.

The handover deliverables shall be limited to the documents expressly included in the agreed scope.

Where training is included, the number of sessions, participants, duration and subject shall be specified.

Customer approval of migrated programs, drawings or configurations establishes the handover baseline but does not transfer to IP responsibility for subsequent Customer modifications.

Where a warranty is provided for Retrofit Services, it shall apply to defects in IP’s agreed retrofit engineering, workmanship, programming or commissioning attributable to IP and within the agreed warranty period.

The warranty shall not apply to retained legacy equipment, Customer or third-party modifications, existing defects, utilities, process conditions, operation outside specifications, OEM/third-party failures or other matters outside IP’s responsibility.

Where a covered defect is established, IP’s primary remedy shall be correction or re-performance of the affected Service.

Completion of the Retrofit Services shall occur when the agreed scope and acceptance criteria are completed or otherwise treated as completed under the applicable contract.

Additional optimisation, troubleshooting, programming, modifications, further migration, production support or additional site visits after completion shall be chargeable unless covered by warranty, AMC or another agreed support arrangement.

Where Retrofit Services are supplied under a Government, PSU or other tender, the tender conditions, IP’s submitted bid/deviations, clarifications, Letter of Award / Letter of Acceptance, Purchase Order and other contract documents shall apply according to the order of precedence specified in the accepted contract.

Once a requirement has become part of the binding project contract, these Specific Terms shall not be construed as overriding it.

If the tender requires OEM authorisation, certification, guaranteed performance, specific lifecycle support or particular replacement Products, IP shall assess and expressly accept those obligations before they are relied upon as part of IP’s responsibility.

These Retrofit, Modernisation, Migration & System Upgrade Terms shall be read together with IP’s Common General Customer Terms and, where applicable, T&C-10 New Product Supply, T&C-11 Used/Refurbished/Legacy Product Supply, Repair, Programming, IT/OT, Automation/System Integration, Installation/Commissioning and Automation O&M Specific Terms.

Where an activity falls within a more specific IP T&C, that T&C shall govern the activity-specific matters.

Where an accepted tender, SOW, Work Order or project contract contains different requirements, the accepted project contract shall govern to the extent of the inconsistency.

IP’s liability shall be governed by the Common General Terms and the applicable project contract.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

The governing law, dispute resolution, arbitration and jurisdiction provisions shall be those contained in the Common General Terms or applicable written agreement.

T&C-13 Engineering & Systems Version 4, Rev 02 - Internal Review Draft

Engineering, Design, Consultancy & Technical Assessment Services

PURPOSE & APPLICATION

Purpose: These Terms govern standalone engineering, design, technical study, audit, assessment, specification, advisory and related consultancy assignments where IP is not undertaking the broader implementation unless expressly included.

These Specific Terms apply where Industry Pro Solutions LLP (“IP”) is engaged for engineering, design, technical consultancy, technical studies, audits, assessments, surveys, specifications, system reviews, feasibility studies, engineering calculations, architecture development, documentation or related advisory services (“Engineering Services”).

Engineering Services may be provided as a standalone assignment or as a preliminary or supporting stage to supply, programming, system integration, installation, retrofit, commissioning, O&M or other services.

The exact scope, deliverables, assumptions, exclusions and acceptance criteria shall be those expressly stated in the applicable quotation, Statement of Work (“SOW”), Work Order, tender or project contract.

IP shall provide professional technical work within the expertise and scope expressly engaged.

Unless expressly included, an engineering study, assessment, audit or recommendation does not constitute implementation, statutory certification, approval, EPC responsibility, plant operation or a guarantee that the Customer will achieve a particular commercial or production outcome.

Where IP is engaged only as an advisor or consultant, the Customer remains responsible for decisions taken on the basis of IP’s recommendations.

Engineering Services shall be based on the information, drawings, specifications, site observations, equipment data, operating information, historical records and other inputs made available to IP.

The Customer shall be responsible for the accuracy, completeness and authority of information supplied by it or on its behalf.

IP may rely on information that is reasonably presented as current and authoritative unless independent verification is expressly included in the scope.

Where IP assesses an existing plant, machine, automation system, electrical system, instrumentation system, network or other installation, the assessment shall be limited to the areas, equipment, conditions and records included in the agreed scope.

A survey, audit, health check or assessment shall not constitute a guarantee that every concealed defect, undocumented modification, intermittent fault, latent condition or non-compliance has been identified.

Access limitations, unavailable equipment, operating constraints and incomplete records may limit the assessment.

Where site inspection forms part of the Engineering Services, the Customer shall provide timely access, safe working conditions, relevant personnel, permits, drawings, documents, operating information and other agreed facilities.

Additional visits or repeated surveys caused by Customer or third-party non-readiness may be chargeable and may affect the schedule.

Engineering deliverables may include drawings, specifications, design calculations, equipment lists, Bills of Materials (BOM), architecture documents, control philosophies, I/O lists, network diagrams, reports, recommendations, feasibility studies, audit reports or other documents specifically identified in the SOW.

Unless expressly agreed in the SOW, deliverables shall be provided in PDF, read-only or other agreed non-editable format. Native source files, editable CAD drawings, unlocked PLC/HMI/SCADA source files, proprietary scripts, calculation models, engineering libraries, templates and reusable tools shall remain IP’s intellectual property or confidential working material and shall not form part of the deliverables.

Where transfer of a particular native or editable file is expressly agreed, the applicable SOW shall identify the file, permitted use, ownership/licence position and any associated commercial conditions.

IP shall not be required to create documents, calculations, models, source files or supporting records that are not included in the agreed deliverables merely because they may be useful to the Customer.

Where IP is responsible for design, the applicable project documents shall define the design boundary and required inputs.

Where Customer review or approval is required, the Customer shall review the deliverables within the period stated in the SOW or project documents. Unless the applicable project contract provides otherwise, the Customer shall provide written approval or specific technical comments within fourteen (14) calendar days of receipt.

Where the Customer fails to provide written approval or specific technical comments within that period, the deliverable may be treated as approved for purposes of progressing the agreed Engineering Services and related billing milestones, provided that the SOW or project contract permits such deemed approval. Where the project contract does not permit deemed approval, the agreed project procedure shall prevail.

Customer approval or deemed approval establishes the design basis for the agreed Services, subject to correction of demonstrable IP errors within scope. Customer approval does not transfer to IP responsibility for Customer-owned process requirements, statutory duties, site conditions or matters expressly retained by the Customer.

Where a Functional Design Specification (FDS), architecture, General Arrangement (GA), Piping and Instrumentation Diagram (P&ID), I/O list, equipment list or other design baseline is approved, the approval date may constitute the design-freeze date where stated in the project documents.

Changes after design freeze, including changes to process requirements, equipment, quantities, interfaces, standards, layouts, logic or specifications, may require additional engineering, rework, testing, time and cost.

IP may present alternative equipment, architecture, technology, implementation methods or technical solutions based on the objectives and information available.

Unless expressly stated otherwise, a recommendation is a professional technical opinion and not a guarantee of the performance, availability, price, life or future support of a proposed Product, technology or third-party solution.

Where the Customer selects an alternative against IP’s recommendation, IP’s responsibility shall be based on the selected and agreed scope.

Where IP performs a performance study, optimization study, energy assessment, reliability assessment or similar analysis, the applicable KPIs, baseline, measurement period, operating conditions, data sources and calculation methodology shall be defined where a quantitative result is required.

A calculated improvement potential or recommendation shall not constitute a guaranteed saving, production increase, energy reduction, OEE improvement or reliability improvement unless expressly agreed as a performance commitment with defined conditions and remedies.

Where IP performs an audit or compliance-oriented assessment, the applicable standard, checklist, system boundary and assessment criteria shall be stated in the project documents where material.

An assessment against a standard or guideline shall not constitute statutory certification, accreditation or approval unless IP is expressly contracted, qualified and authorised to provide the relevant certification or assessment.

Where an audit identifies gaps, IP may recommend corrective actions. Implementation of such actions shall be a separate scope unless expressly included.

Where Engineering Services concern electrical safety, functional safety, protection systems, Safety Instrumented Systems (SIS), emergency shutdowns, hazardous areas or other regulated functions, the applicable standards, design responsibility and validation/certification requirements shall be expressly identified.

IP shall not be deemed responsible for statutory approval or certification merely because its engineering documents support an application.

The Customer and other responsible parties shall retain statutory and operational responsibilities allocated to them under applicable law and the project documents.

Engineering may depend upon OEM manuals, proprietary drawings, software, licences, device data, technical clarifications and third-party information.

IP shall not be responsible for inaccuracies, omissions, restrictions or unavailability originating from an OEM or third party, except to the extent IP has independently verified the information or expressly assumed responsibility for doing so.

Where third-party technical clarification is required, schedule and outcome may depend on that party’s cooperation.

The applicable engineering standards, codes, specifications and Customer standards shall be those expressly identified in the project documents.

IP shall not be deemed to have undertaken compliance with every standard potentially relevant to the Customer’s plant merely because a standard exists or is commonly used in the industry.

Where the Customer requires compliance with a particular edition, standard, certification or client specification, it shall be identified before the relevant engineering baseline is established.

Where Engineering Services include PLC/HMI/SCADA/DCS, industrial networking, IT/OT, cybersecurity, IEC 61850 or other software/configuration design, the applicable Programming, IT/OT and/or System Integration Specific Terms shall apply to those portions of the work.

Engineering documentation shall not by itself constitute implementation or commissioning unless expressly included.

The Customer shall remain responsible for evaluating IP’s recommendations in the context of its plant, process, business requirements, statutory obligations and risk appetite.

Unless implementation responsibility is expressly included, IP shall not be responsible for the Customer’s decision not to implement a recommendation, to implement it differently, or to combine it with other systems or measures outside IP’s scope.

Customer technical, commercial, operational and proprietary information received by IP shall be handled in accordance with the Common General Terms and applicable law.

IP may use information necessary to perform the Engineering Services and may retain project records to the extent reasonably required for contractual, legal, quality or internal technical purposes, subject to applicable confidentiality obligations.

IP shall retain ownership of its pre-existing methodologies, templates, calculation methods, standard drawings, libraries, software, tools, know-how, generic designs and reusable engineering concepts.

Customer ownership of a project-specific deliverable, where expressly agreed, shall not transfer IP’s pre-existing or reusable intellectual property unless the applicable contract expressly provides otherwise.

Where deliverables are subject to review or acceptance, the applicable review period and acceptance criteria shall be stated in the SOW or project documents.

Unless the SOW expressly provides otherwise, the Engineering Services shall include up to two (2) consolidated rounds of Customer review comments per deliverable. A review round means one consolidated set of comments issued by the Customer against the submitted deliverable.

Comments that introduce new requirements, change the approved design basis, arise from changed Customer information, or require substantial redesign shall be treated as additional work even if raised within the included review rounds.

Subsequent review cycles or substantial redesign requested after the included review rounds shall be subject to Change Control and may be billed as additional work.

Acceptance shall be assessed against the agreed deliverable requirements and not against requirements introduced after submission. Minor comments that do not prevent the deliverable from meeting the agreed requirements shall not by themselves constitute rejection of the complete deliverable.

Additional analysis, redesign, re-survey, repeated calculations, revised specifications, additional alternatives, new standards, new equipment data, expanded site assessment or other work outside the agreed scope may be treated as additional work.

IP shall, where reasonably practicable, communicate the technical and commercial impact before undertaking material additional work.

Engineering schedules depend upon timely receipt of information, approvals, site access, third-party inputs and decisions.

Delays caused by Customer or third-party dependencies shall entitle IP to reasonable schedule adjustment and, where applicable, additional charges for rework, remobilisation or extended effort.

Where a warranty is expressly provided for Engineering Services, it shall apply to demonstrable defects in IP’s agreed deliverables attributable to IP and identified within the applicable warranty period.

The warranty shall not constitute a guarantee of plant performance, commercial outcome, third-party performance, regulatory approval or implementation success.

Where a covered defect is established, IP’s primary remedy shall be correction or re-performance of the affected Engineering Service.

Where Engineering Services are provided under a Government, PSU or other tender, the tender conditions, IP’s submitted bid/deviations, clarifications, Letter of Award / Letter of Acceptance, Purchase Order and other project documents shall apply according to the order of precedence specified in the accepted contract.

Once a requirement has become part of the binding project contract, these Specific Terms shall not be construed as overriding it.

Where a tender requires certification, design responsibility, performance guarantee, approval or professional liability beyond IP’s intended role, IP shall assess and expressly accept that responsibility before it is relied upon as part of IP’s scope.

Completion occurs when the agreed Engineering deliverables have been submitted and accepted or otherwise treated as completed under the applicable contract.

Additional meetings, redesign, implementation support, site visits, troubleshooting, project management or engineering changes after completion shall be chargeable unless expressly included in another applicable agreement.

These Engineering, Design, Consultancy & Technical Assessment Terms shall be read together with IP’s Common General Customer Terms and, where applicable, the Programming, IT/OT, Automation/System Integration, Installation/Commissioning, Retrofit, Supply and Automation O&M Specific Terms.

Where an activity falls within a more specific IP T&C, that T&C shall govern the activity-specific matters.

Where an accepted tender, SOW, Work Order or project contract contains different requirements, the accepted project contract shall govern to the extent of the inconsistency.

IP’s responsibility for Engineering Services shall be limited to the professional services and deliverables expressly undertaken in the applicable SOW or project contract.

IP shall not be responsible for consequential plant, production, business, revenue or process losses arising from engineering work except to the extent such liability is expressly accepted in the applicable project contract or cannot lawfully be excluded.

Any monetary limitation of IP’s liability, including any limitation specific to Engineering Services, shall be governed by the Common General Terms and the applicable project contract. Nothing in these Specific Terms shall be construed as creating a liability cap that conflicts with an accepted tender, Purchase Order or other binding project contract.

IP’s liability shall be governed by the Common General Terms and the applicable project contract.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

The governing law, dispute resolution, arbitration and jurisdiction provisions shall be those contained in the Common General Terms or applicable written agreement.

T&C-14 Training & Learning Version 4, Rev 02 - Internal Review Draft

Training & Knowledge Transfer Services

These Specific Terms apply where Industry Pro Solutions LLP (“IP”) provides training, knowledge transfer, operator familiarisation, maintenance training, technical workshops, classroom instruction, practical demonstrations or similar learning services (“Training Services”).

Training may be provided as a standalone assignment or as part of supply, programming, integration, installation, commissioning, retrofit, O&M, engineering or other project services.

The applicable quotation, Statement of Work (“SOW”), Work Order, tender or project contract shall define the subject, duration, participants, location, mode, number of sessions and deliverables included.

Training is intended to transfer the knowledge and skills expressly identified in the agreed scope. Unless expressly stated, Training Services do not constitute professional certification, statutory qualification, licence, competency certification or guarantee that a participant will independently operate, maintain, program or troubleshoot a plant or system safely or successfully.

Where training is intended to satisfy a statutory, OEM or certification requirement, the applicable requirement and authorised certifying body shall be expressly identified.

The training level shall be based on the agreed audience and objectives, such as operator familiarisation, maintenance-user training, programming basics, system administration, troubleshooting, recipe management, HMI/SCADA operation or other specified subjects.

IP shall not be responsible for prerequisite knowledge, qualifications or experience that the Customer has not ensured for its participants.

Training material, presentations, examples, exercises, templates, demonstrations, methods, libraries, software tools and other material developed or used by IP shall remain IP’s intellectual property unless expressly agreed otherwise.

The Customer may use supplied training material internally for the purpose for which the Training Services were purchased. Reproduction, commercial distribution, resale, publication, external training or transfer to third parties requires IP’s prior written permission unless expressly agreed.

The Customer shall provide suitable participants, premises or online facilities, required access, equipment, software licences, utilities, safety arrangements and other resources identified in the SOW.

Participants shall comply with Customer/site safety rules and IP’s reasonable instructions during practical training.

Where training is conducted on live plant or equipment, the Customer shall retain operational control and shall ensure that appropriate safety, isolation and operating permissions are in place.

Practical training involving live equipment, PLCs, HMIs, SCADA/DCS, drives, networks, machinery or process systems shall be subject to the agreed safety and access conditions.

The Customer shall retain operational control of the plant and shall ensure that applicable safety systems, interlocks, permits, isolations and operating controls are in place. Customer personnel shall not make or direct changes to live systems except as expressly authorised under the agreed training activity and applicable site procedures.

IP may refuse or stop a practical exercise where it reasonably considers that the proposed activity creates an unacceptable safety, equipment or operational risk.

Where a loss, damage, production interruption or system upset occurs as a result of a participant action, Customer instruction or Customer failure to maintain the required safety/operational controls, IP shall not be responsible for the resulting loss, except to the extent directly caused by IP’s own negligence, wilful misconduct or breach of its express obligations.

Training demonstrations do not authorise participants to modify live control systems unless such modification is expressly included and appropriately authorised.

Where training requires software, engineering tools, simulators, licences, hardware or access credentials, the responsibility for providing them shall be stated in the SOW.

IP shall not be responsible for licence restrictions, unavailable OEM software, unsupported versions or third-party systems that prevent or limit the planned training.

The Customer shall ensure that nominated participants attend the agreed sessions. Substitution of participants shall be permitted where reasonably practicable, subject to the training level and available capacity.

Repeated absence, late arrival, participant substitution requiring substantial reorientation, or failure to provide the required number of participants may reduce the effectiveness of the Training Services and may require additional sessions at additional cost.

The agreed training schedule shall be stated in the applicable commercial document.

Cancellation or rescheduling by the Customer after confirmation may result in charges for committed trainer time, travel, accommodation, preparation, venue or other non-recoverable costs. Where the quotation or SOW specifies a cancellation or rebooking charge, that agreed charge shall apply.

Where no specific cancellation charge has been agreed, IP may recover reasonable, documented and non-refundable costs already committed and may charge for trainer time or preparation that cannot reasonably be redeployed.

Delay caused by Customer/site readiness or third-party availability may require corresponding schedule adjustment and additional charges.

Where assessment, examination, practical evaluation or attendance certification is expressly included, the criteria and form of assessment shall be defined in the SOW.

Unless assessment or certification is expressly included, completion of Training Services means delivery of the agreed sessions/materials and does not constitute certification of participant competency.

Where included, IP may issue attendance certificates or completion records identifying the participant, subject and training period.

An attendance or completion certificate shall not be represented as a statutory, professional, OEM or competency certification unless IP is expressly authorised to issue such certification.

IP warrants only that the agreed Training Services shall be delivered with reasonable professional care and in accordance with the agreed scope.

IP does not warrant that every participant will achieve a particular level of competence, pass an external examination, eliminate future operating errors, or independently achieve a specified production, maintenance or process outcome unless expressly agreed.

Questions, troubleshooting, additional coaching, refresher sessions, on-site assistance, programming support or technical consultancy after completion are outside the Training Services unless expressly included or covered under another IP agreement.

Such support may be provided under the applicable Programming, O&M, Engineering, IT/OT or other Specific T&C.

Where Training Services are provided under a Government, PSU or other tender, the tender conditions, IP’s submitted bid/deviations, clarifications, Letter of Award / Letter of Acceptance, Purchase Order and other project documents shall apply according to the order of precedence specified in the accepted contract.

These Specific Terms shall not override a binding project requirement that IP has expressly accepted.

These Training & Knowledge Transfer Terms shall be read together with IP’s Common General Customer Terms and, where applicable, the Specific T&C governing the equipment, software, programming, integration, installation, O&M, retrofit or engineering subject of the training.

Where training is incidental to another contracted service, the principal service T&C shall govern the underlying technical/service responsibility; these Terms shall govern the Training Services themselves.

IP’s liability shall be governed by the Common General Terms and the applicable project contract.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

T&C-15 General Services Version 4, Rev 02 - Internal Review Draft Residual T&C for occasional activities not covered by a dedicated IP Specific T&C.

Miscellaneous Technical Services & Supplies

These Specific Terms apply to occasional technical services, inspections, testing, documentation support, technical manpower, minor engineering assistance, calibration coordination, technical verification, small technical supplies or other IP activities that are not sufficiently distinct or substantial to warrant a dedicated Specific T&C (“Miscellaneous Services”).

The applicable quotation, SOW, Work Order, tender or project contract shall identify the exact activity and deliverables.

The use of a general description such as “technical support”, “inspection”, “testing”, “assistance”, “technical manpower” or “miscellaneous work” shall not by itself create an obligation for IP to perform activities not expressly identified in the applicable commercial document.

Where an activity is sufficiently substantial to fall within an existing IP Specific T&C, that more specific T&C shall apply to the relevant activity.

Where IP performs inspection, testing or technical verification, the applicable equipment, system, parameters, standards, test method, acceptance criteria and reporting deliverables shall be identified where material.

Inspection or testing of a component, system or selected parameter shall not constitute certification of the complete plant, process or system unless expressly included and IP is appropriately authorised to provide such certification.

Where IP arranges, coordinates or performs calibration or measurement-related services, the scope shall identify the instruments, parameters, reference standards, calibration method and whether an accredited laboratory or third party is required.

Where calibration is performed by a third party, the third party’s certificate and terms shall govern the calibration result and IP shall not be deemed to have assumed the third party’s accreditation or technical liability.

Where IP provides personnel for technical assistance, the personnel shall perform only the functions stated in the applicable commercial document.

The Customer shall provide the site supervision, work permits, access permissions, task-specific risk assessments and operating authority required for activities under the Customer’s control. IP personnel shall not be required to perform tasks outside the agreed written scope or to undertake hazardous activities without the applicable site safety controls, permits and authorisations.

Unless expressly agreed otherwise, provision of technical manpower does not transfer to IP responsibility for plant operation, production decisions, statutory duties, site management or supervision of Customer personnel.

Nothing in this clause relieves IP of its own obligations concerning the competence and conduct of personnel supplied by IP or of its own negligence, wilful misconduct or breach of contract.

Where IP is engaged to prepare, update, digitise, organise or verify technical documentation, the deliverables shall be limited to the documents and data expressly identified.

IP may rely on information provided by the Customer and shall not be responsible for historical information that is incomplete, inaccurate or unavailable unless independent verification is expressly included.

Small technical supplies provided under Miscellaneous Services shall be governed by the applicable New Product or Used/Refurbished/Legacy Product T&C where the supplied item falls within those categories.

Where the applicable product T&C or quotation provides for an OEM/manufacturer warranty, IP’s warranty obligation shall be limited to the applicable pass-through or expressly agreed warranty. IP shall not provide an independent additional product warranty unless expressly agreed in writing.

This Miscellaneous T&C shall not be used to bypass the specific product-condition, warranty or inspection provisions applicable to such Products.

The Customer shall provide access, safe working conditions, permits, utilities, information, equipment availability and other agreed resources necessary for the Miscellaneous Services.

Additional visits, waiting time, rework or mobilisation caused by Customer or third-party non-readiness may be chargeable.

If an occasional assignment develops into a broader engineering, programming, integration, installation, commissioning, O&M, retrofit or other defined service, IP may require the work to be transferred to the applicable Specific T&C and a revised quotation or SOW.

Additional work outside the agreed scope shall be subject to change control.

Completion shall be determined by the agreed deliverables, test records, service report or other completion mechanism stated in the applicable commercial document.

Where no formal acceptance mechanism is specified, IP’s submission of the agreed report, certificate, service record or completion evidence shall constitute completion subject to any mandatory project-contract provisions.

Unless expressly agreed otherwise, Miscellaneous Services carry only the service warranty expressly stated in the applicable commercial document.

Where a covered service defect is established, IP’s primary remedy shall be correction or re-performance of the affected service.

No warranty shall be implied for the performance, remaining life or suitability of Customer-owned or third-party equipment merely because IP inspected, tested, assisted with or supplied services relating to it.

For Products supplied under this T&C, the warranty provisions of the applicable product-specific T&C shall govern.

Where a Miscellaneous Service depends on an OEM, laboratory, certification body, Customer-appointed contractor or other third party, IP’s responsibility shall be limited to the services expressly undertaken by IP.

Third-party performance, certificates, approvals, software licences and technical information shall remain subject to the relevant third party’s responsibility.

Where Miscellaneous Services are provided under a Government, PSU or other tender, the accepted tender/project contract shall govern according to its stated order of precedence.

These Specific Terms shall not override binding project requirements expressly accepted by IP.

These Miscellaneous Technical Services & Supplies Terms are intended as a residual T&C only.

Where a service is clearly covered by a dedicated IP Specific T&C, the dedicated T&C shall govern. These Terms shall apply only to the residual activity or to the portions expressly identified in the applicable commercial document.

IP’s liability shall be governed by the Common General Terms and the applicable project contract.

Nothing in these Specific Terms shall exclude or limit liability to the extent such exclusion or limitation is prohibited by applicable law.

Chat